Availability
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 0.060 in. Thick, 377 lbs./in., Factory Valve Guides, Kit
Part Number: BTC-SK001T0560BB
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rocker Arm Trunnion Upgrade Kit, Needle Bearing Style, Chevy, Small Block LS, Kit
Part Number: BTC-BTRTK001
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam Bearings, Direct Replacement, Bi-metal, Lead-Based Micro Babbitt, Chevy, Small Block LS Fits Second and Third Design, Kit
Part Number: DUR-CH-25
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
LS Cylinder Head, 5.3L Specific, 64cc Chamber, 2.000 Int. Valve, Permanent Mold A-356, Manganese Guides, Ductile Seats, PAC Springs, 21 4N Stainless
Part Number: SUM-LS210CATH64
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Accessory Drive Systems, LS Mid-mount, Serpentine, Alternator, Water Pump, Clockwise, Power Steering, AC, SD-7, Polished Finish, Chevy, 4.8-7.0L, Kit
Part Number: HLY-20-185P
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Camshaft, BTR, Red Hot, 221 int. Duration, 0.619 in./0.617 in. Lift, 113 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Gen III/IV LS, Each
Part Number: BTC-BTR-REDHOT
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Rocker Arm Trunnion Upgrade Kit, Trunnion Upgrade, Chevy, LS, Set of 16
Part Number: SME-143002
Estimated Ship Date: Jan 2, 2026 if ordered today
Estimated Ship Date: Jan 2, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Harmonic Balancer, Super Damper, Internal Balance, Aluminum/Steel, Black, Cadillac, LS-A, Each
Part Number: ATI-918854
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Oil Pans, Engine Swap, Low Profile, Aluminum, 4.250 in. Stroke, 5.5 Quarts, Chevy, LS, 4.8L, 5.3L, 5.7L, .0L, 6.2L, Kit
Part Number: TSN-81074
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crate Engine, Pro Series 530 HP EFI Base Dressed Long Block, Assembled, Internal Balance, Aluminum Cylinder Heads, Chevrolet, 6.2L LS, Each
Part Number: MLL-PSLS37650CTF
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Head, LS3, Aluminum, Assembled, 68.4cc, 260cc Intake Runner, Each
Part Number: NAL-12675871
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crate Engine, Long Block, LSX454, Hydraulic Roller Tappet, 1-Piece Rear Main, Orange Valve Covers, Gen III/IV LS, Chevy, Each
Part Number: NAL-19417357
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Cam and Lifter kit, Stage 2, LS Truck Swap Cam, 218/227 112+2, .522/.524 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, Each
Part Number: SUM-K8701R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LY6 LY5
Part Number: SUM-8709R1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Chevy LS 408 Boosted/NOS Short Block 58 Tooth +10cc Dish
Part Number: HPE-SP26-B
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Head, GenX® 260, CNC Competition Ported, Assembled, 70cc CNC Chambers, 450 Lb. Springs, GM LSX, Each
Part Number: TFS-32710002-C01
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, Serpentine, Internal Balance, Aluminum/Steel, Black, SFI 18.1, Chevy, Pontiac, 5.7L LS
Part Number: ATI-917302
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crankshaft, Compstar 4340 Forged LS, 4.000 Stroke, Internal Balance, 8 counterweight, 6-bolt Flange, Standard Snout. 58-tooth GM Reluctor, Ea.
Part Number: CPI-APO31Q-CS58
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Heads, LS3, Aluminum, 260cc Intake Runner Volume, 95cc Exhaust Runner Volume, 6 Bolt, Pair
Part Number: AFR-1840
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pro LS Big Truck Torkinator High Lift. 212/218 Dur., 110+3, .600/.585 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, Vortec LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8728R1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Variable Valve Timing VVT Delete Combo, Cam Bolts, 3-bolt Cam Sprocket, Timing Cover, Damper Bolt, Chevy, 4.8L, 5.3L, 6.0L, 6.2L, Kit
Part Number: CMB-09-0027
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam Gear, 3-Bolt, 58/4X, Chevy, V8, LS, Each
Part Number: NAL-12586481
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Covers, Centerbolt, Stock Height, Cast Aluminum, Black Powdercoated, Textured, Brian Tooley Racing Logo, Chevrolet, Small Block LS, Pair
Part Number: BTC-VCA02BLKCM
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Stage 1 Pro LS Truck Swap Cam, High-Lift version, 209/217 112 + 1 .550/.550 Lift, 3-bolt, 4.8-6.2L, LQ4 LQ9 LY6 LS1 LS2 LY6 LS6 LS7 LS9 LH6, Each
Part Number: SUM-8719R1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Covers, Tall Height, Cast Aluminum, Black Crinkle, Plain, Chevy, LS, Pair
Part Number: SUM-440362
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.