Availability
2019 Summit Racing Engines & Components
Cylinder Head Fasteners, Bolt, 2004+ Chevrolet LS, Hex Head, Steel, Zinc Plated, Kit
Part Number: SUM-910211
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
LS Cylinder Head, 5.3L Specific, 60cc Chamber, 2.000 Int. Valve, Permanent Mold A-356, Manganese Guides, Ductile Seats, PAC Springs, 21 4N Stainless
Part Number: SUM-LS210CATH60
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Combo, Engine Oil Change Kit, 0W40 10 Qts., Kit
Part Number: CMB-08-0100
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, Stage 2, Kit
Part Number: CMB-09-0037
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Rod Bearings, Direct Replacement, Standard Size, Bi Metal, Chevy, Small Block, Set of 8
Part Number: SUM-171000
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Chevy LS Cylinder head, 210cc Cathedral port Intake Runner, 64cc Chamber, 2.02 Intake Valve 1.6 Exhaust Valve, 3.898+ bore sizes, Max .660 Lift, Each
Part Number: SUM-162LS210CATH
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, Performance, I-beam Style, Forged 4340 Steel, 6.098 in. Length Center To Center, Chevrolet, 5.3L, 5.7L, 6.0L, 6.2L LS, Set of 8
Part Number: SUM-LS6098945I
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft, Stage 2, LS Truck Swap Cam, High lift version, 218/227 112+2, .600/.600 Lift, 3-bolt, LS1 LS2 LS6 LS3 LQ4 LY6 LQ9 Each
Part Number: SUM-8720R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Spring Upgrade Kit, 1.300 OD Dual Springs, Retainers/Locks, Seals, All GM LS LS1, LS2, LS3, LS7, LSA, LS9, LQ4, LQ9, L92, L76, LY6
Part Number: SME-174003
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LY6 LY5
Part Number: SUM-8709R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.030 bore, 1.299 C.H., 2cc Flat, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8
Part Number: SUM-2999274030-2
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Oil Pump, Standard-Volume, Standard Pressure, Chevy LS, 4.8/5.3/5.7/6.0/6.2L, Each
Part Number: SUM-121170
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, LS1 LS2 LS6 LS7 LS9 LS3 LH6 LQ4 LQ9, Each
Part Number: SUM-8712R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cam and Lifter kit, Stage 2, LS Truck Swap Cam, 218/227 112+2, .522/.524 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, Each
Part Number: SUM-K8701R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Summit Chevy LS 4340 Forged Steel Crankshaft, 3.622 stroke, 58X Reluctor, Gun-drilled and Lightened, Nitride Hardened, Narrowed Rod Bearings Req.
Part Number: SUM-180LS362258
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 1 Pro LS Truck Swap Cam, High-Lift version, 209/217 112 + 1 .550/.550 Lift, 3-bolt, 4.8-6.2L, LQ4 LQ9 LY6 LS1 LS2 LY6 LS6 LS7 LS9 LH6, Each
Part Number: SUM-8719R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft, Stage 2, Pro LS Turbo Cam. 226/230 Dur., .600/.575 Lift, 113+4 Lobe Sep. , 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Each
Part Number: SUM-8706R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cylinder Deactivation Delete Combo, 09-21 5.7 Gen III Hemi Truck, MDS Delete Kit With VVT, Stock spec cam, Kit
Part Number: CMB-09-0044
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cylinder Head Studs, Extreme Duty, 12-Point Head, Black Oxide, Chevy, 4.8, 5.3, 5.7, 6.0L, 2004-up, Kit
Part Number: SUM-910501
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Tall Height, Cast Aluminum, Black Crinkle, Plain, Chevy, LS, Pair
Part Number: SUM-440362
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.030 bore, 1.110 C.H., 20cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.0 LY6 LQ4 LQ9, Set of 8
Part Number: SUM-110927403020
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pistons, Pro LS 2618 Forged, 4.030 bore, Flat top, 3.622 in. Stroke, 6.098 Rod, Set of 8
Part Number: SUM-3269454030-2
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Rocker Arm Trunnion Upgrade Kit, Trunnion Upgrade, Chevy, LS, Set of 16
Part Number: SME-143002
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 4 Pro LS Cam, Extra Valve Clearance Version, 234/248 113.5 +3.5 .625/.605 Lift, Great Power, 3-bolt, 4.8-7.0L , Vortec LS1 LS2 LS6 LS7 LQ9 LS9
Part Number: SUM-8711R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster