Availability
2000 Summit Racing Engines & Components
Summit Factory Performance Stage 3 LS Single Plane Cam, 236/246 110 +0 .612/.612 Lift, LS1 LS2 LS6 LS3 LQ9, Summit's version of Factory LSX 454 cam
Part Number: SUM-8702
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.000 bore, 1.299 C.H., 12cc Dish, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-299927400012
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Gen. 1.5 LT1 Forged Steel Crankshaft, 3.750 stroke, 5.700 Rod, Lightened, bull-nose counterweights, Nitride Hardened, 1 piece rear main seal
Part Number: SUM-SBCLT37501P
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Harmonic Balancer Bolt, Steel, Gold Iridite, External Hex, Chevy, Small Block, Each
Part Number: SUM-G1677
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pistons, Hypereutectic, Flat, 4.030 in. Bore, Ford, SBF, Set of 8
Part Number: SUM-17302C-30
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Chevy SB, 195 cc Intake Runner, 65cc Angle-Plug Chamber, 2.02 Intake Valve, 1.6 Exhaust Valve, Hydraulic Roller Cam Max .600 Lift, Ea.
Part Number: SUM-162SBCANGHR
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.780 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273780-7
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 261/269, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8719-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Stock Height, Centerbolt Mounting, Steel, Black Powdercoated, Chevy, 5.0L, 5.7L, Pair
Part Number: SUM-G3319B
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 2cc dome, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Coated, 4.8L 5.3L Vortec Truck
Part Number: SUM-326945780-2P
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
SUM-8728 Pro LS Big Truck Torkinator Level 1 Cam Kit, Beehive Springs, 212/218 Dur., 110 + 3, .600/.585 Lift, 3 Bolt, 4.8, 5.3, 6.0, 6.2 Vortec
Part Number: SUM-8728-1-BHV
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 283/297, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8711-1DS
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.810 bore, 1.326 C.H., 2cc dome, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943810-2F
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pistons, Hypereutectic, Flat, 4.030 in. Bore, Chevy, Set of 8
Part Number: SUM-17350C-30
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, Excellent power and torque, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-8710R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 4 Pro LS Truck Swap Cam, 226/230 112+4, .550 /.550 Lift, 3-bolt, Chevy, LS, Each
Part Number: SUM-8714R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Summit Chevy LS 4340 Forged Steel Crankshaft, 3.622 stroke, 24X Reluctor, Gun-drilled and Lightened, Nitride Hardened, Narrowed Rod Bearings Req.
Part Number: SUM-180LS362224
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro SBC Stage 3 Hyd. Flat-Tappet 4/7 Firing Order Swap Cam, 218/228 Dur., 109 LSA + 2 Adv, .465/.473 1.5 Ratio, .486/.505 1.6 Ratio, 1500-5800 Range
Part Number: SUM-1202
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.810 bore, 1.326 C.H., 7cc dish, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Coated, 4.8L 5.3L Vortec Truck
Part Number: SUM-326945810-7P
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Water Pump Pulley, V-Belt, 2-Groove, Aluminum, Machined, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3964
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft, Mechanical Flat Tappet, Advertised Duration 287/297, Lift .504/.504, Chevy, Small Block, Each
Part Number: SUM-CT101
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 4 Hyd. Roller LS Firing Order, 232/242 Dur., 110 LSA + 3 Adv, .550/.550 1.5 Ratio, 2200-6400 RPM Range
Part Number: SUM-K1224
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Summit Factory Performance Stage 1 LS Circle Track Cam, 225/236 110+1, .525/.525 Lift, Vortec LS1 LS2 LS6 LS3 LQ4, Summit's version of the ASA Cam
Part Number: SUM-8700
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Harmonic Balancer, Damper, Internal Balance, Medium Spacing, Steel, Clearcoated, Chevy, Pontiac, 5.7, 6.0L, Each
Part Number: SUM-C2500
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Timing Chain and Gear Set, Double Roller, Heavy Duty, Ford, Set
Part Number: SUM-G6771
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster