Availability
2000 Summit Racing Engines & Components
Water Pump Pulley, V-Belt, 2-Groove, Steel, Black, Chevy, Big Block, Long, Each
Part Number: SUM-329723B
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Main Bearings, 1/2 Groove, Standard Size, Bi Metal, Silicon Aluminum, Chevy, Big Block, Set of 5
Part Number: SUM-172200
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Rocker Arms, Stud Mount, OEM-Style, Stamped Steel, 1.7 Ratio, Fits 7/16 in. Stud, Chevy, Big Block, Set of 16
Part Number: SUM-G6803
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Power Steering Brackets, Driver Side, Upper and Lower, Steel, Chrome, Kit
Part Number: SUM-341211
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 410 Cid., 4.040 bore, 4.000 stroke, 24X, 6.125 rod, 8cc dish, 11.2:1 @ 65cc, 10.6:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24400408
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Water Pump Pulley, V-Belt, 2-Groove, Steel, Black, Chevy, Small Block, Short Water Pump, Each
Part Number: SUM-G3951B
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pistons, Hypereutectic, Flat, 4.040 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-40
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS Rotating Assembly, 370 Cid., 4.030 bore, 3.622 stroke, 24X, 6.125 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit rings, H Bearings
Part Number: SUM-R2436L0302
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8723R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS Piston and Rod Kit, 330 Cid., 3.810 bore, Standard 3.622 stroke, 6.125 rod, 7cc dish, 9.8:1 @ 61cc, 9.4:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR36L8107
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cam and Lifter kit, Pro SBC Stage 3 Hyd. Flat-Tappet 4/7 Firing Order Swap, 218/228 Dur., 109 LSA + 2 Adv, .465/.473 1.5 Ratio, 1500-5800 Range
Part Number: SUM-K1202
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pistons, Hypereutectic, Flat, 4.000 in. Bore, Chevy, Set of 8
Part Number: SUM-17350C-00
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.030 bore, 1.326 C.H., 12cc dish, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LQ4 LQ9
Part Number: SUM-326945403012
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Stock Height, Cast Aluminum, Black Crinkle, Plain, Chevy, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0L, Pair
Part Number: SUM-440367
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, 4340, H-Beam, 12-Point, 6.275 in. Length, 0.945 in. Pin, ARP2000 Bolts, Chevy GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-LS6275945
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pistons, Forged, Flat, 4.030 in. Bore, Chevy, Set of 8
Part Number: SUM-17360FC-30
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 402 Cid., 4.000 bore, 4.000 stroke, 24X, 6.125 rod, 20cc dish, 9.7:1 @ 65cc, 9.3:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R244000020
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 364 Cid., 4.000 bore, 3.622 stroke, 24X, 6.098 rod, 12cc dish, 9.6:1 @ 65cc, 9.2:1 @ 70cc, File-Fit Rings, H Bearings,
Part Number: SUM-R243600012
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 275/288, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8707-1DS
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft, Hydraulic Flat Tappet, Advertised Duration 280/289, Lift .449/.473, Ford, Small Block, Each
Part Number: SUM-3600
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cam and Lifter kit, Camshaft, Stage 2, LS Truck Swap Cam, High lift version, 218/227 112+2, .600/.600 Lift, 3-bolt, LS1 LS2 LS6 LS3 LQ4 LY6 LQ9 Each
Part Number: SUM-K8720R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 402 Cid., 4.000 bore, 4.000 stroke, 58x, 6.125 rod, 8cc dish, 11:1 @ 65cc, 10.4:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R58400008
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Standard Clearance, set
Part Number: SUM-663HS
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Centerbolt Mounting, Cast Aluminum, Black Powdercoated, Chevy GM, LS/LSX, Gen III/IV, Pair
Part Number: SUM-440343B
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 1 Hyd. Roller LS Firing Order,212/218 Dur., 110 LSA + 2 Adv, .525/.520 1.5 Ratio, 1500-6000 Range
Part Number: SUM-K1221
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster