Availability
1999 JEEP CHEROKEE Transmission & Drivetrain
U-Joints, Spicer 1310 To GM 3RL/S44/Mechanics 3/American Axle 1344, Steel, Each
Part Number: YGA-42013
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
U-Joint, Spicer 1310, Greasable, Steel, Each
Part Number: YGA-42008
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Clutch Slave Cylinder, Push Type, Plastic, Black, Jeep, Kit
Part Number: CWA-52107654AB
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Ring Gear Bolts, Hex Head, 3/8 in. Thread Size, Steel, Black, Dana 30, Dana 35, Dana 44, Set of 10
Part Number: CWA-4720891
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Ring & Pinion Gear Set DANA 30 / 4.88 Ratio Rev. Rotation
Part Number: SVL-2020831
Estimated Ship Date: Apr 3, 2026 if ordered today
Estimated Ship Date: Apr 3, 2026 if ordered today
Axle Shaft, Rear Driver Side, 1541H Alloy, 27 Spline, 30.688 in. Length, Dana 35, Jeep, Each
Part Number: YGA-21303
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Carrier Bearing Kit - Dana 30
Part Number: SDH-706016X
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Fitting, Straight, Steel, Gold Iridited, -3 AN, 7/16-24 in. Inverted Flare, Male Threads, Each
Part Number: ADD-716130TJ
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Spider Gear Kits, Open Differential, Dana 30, 27 Spline, Kit
Part Number: MGR-D30BI
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Shims, Pinion Shim Type, Steel, Set
Part Number: MGR-1100
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Universal Joint, 1310-WJ Style, Non-Greasable, Steel, Each
Part Number: SUM-732004
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Carriers, Loaded, Dana 35, Open, 27-spline, Standard, Split Case 2.73 in. - 3.31 in., with Bearings, 10 Bolt, Rear, Jeep, Truck, Each
Part Number: SDH-75053X
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Carrier Rebuild Kits and Spider Gears, Differential Inner Gear Kits, Dana 35, Side Gears, Open, 27-spline, 10-bolt, Jeep, Kit
Part Number: SDH-707321X
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Clutch Throwout Bearing, Standard Style, Dodge, Jeep, Each
Part Number: CWA-53008342
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Transfer Case Lowering, Steel, Black E-Coat, Jeep, Kit
Part Number: BDX-BDS124006
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Gasket, 4WD Actuator Housing Cover, Dana 44, Each
Part Number: SDH-41494
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Axle Shaft, 27-Spline, 22.680 in. Length, Dana 30, Driver Side Front, Jeep, Each
Part Number: SDH-75814-1X
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Front Driveshaft
Part Number: RNB-938-129
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Transfer Case Component, Drain Plug, Chrysler, Dodge, Jeep, Ram, Each
Part Number: CWA-68001627AA
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
U-Joint, Spicer 1310-1330 Style, Steel, Each
Part Number: YGA-42005
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Pinion Nuts, Steel, Dana 30, Jeep Wrangler JK, Each
Part Number: SDH-44189
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Gear, Ring and Pinion, 4.56:1 Ratio, Dana 30, Reverse Rotation, Set
Part Number: MGR-D30-456F
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Transfer Case Rebuild Kit, Bearing and Seal Kit, NP242, 16mm Narrow Input Bearing, 62mm Rear Mainshaft Bearing, Dodge, Jeep, NP242, Kit
Part Number: SPZ-72206
Not Yet Reviewed
Estimated Ship Date: Apr 7, 2026 if ordered today
Estimated Ship Date: Apr 7, 2026 if ordered today
Flywheel Bolts, Pro Series, 12-point, 1/2-20 in. Thread, Chromoly, Black Oxide, Jeep, 4.0L, 4.2L, Set of 6
Part Number: CTF-31002
Not Yet Reviewed
Estimated Ship Date: Apr 13, 2026 if ordered today
Estimated Ship Date: Apr 13, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster