Availability
1999 JEEP CHEROKEE Transmission & Drivetrain
U-Joint, Spicer 1350-1410 Style, Steel, Each
Part Number: YGA-42006
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Bearing, Rear Axle, Steel, Replacement, Each
Part Number: NTL-5707
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Wheel Hub and Bearing Assembly, Front, Jeep, Each
Part Number: TMK-HA597449
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Ring and Pinion Installation Kit, Dana 30, Ford, Jeep, Front, Kit
Part Number: MGR-R30RMKT
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Ring and Pinion Installation Kit, Master Kit, Dana 35, Kit
Part Number: MGR-R35JRMKT
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Torque Converters, Remanufactured, OEM Style, 1.5 in. Slotted Hub, 4 Pad Mount, 11.5 in. Diameter, Stock Stall, 26 Spline Input, Jeep, 4.0L, Each
Part Number: CCV-TQJ30
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Clutch Kit, 10.472 in. Diameter, Heavy Duty, Street, Off-Road, Jeep, L6, V8, Kit
Part Number: ACL-JP1-HDSS
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Wheel Bearing, Rear Inner, Each
Part Number: TMK-6408
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Center Yoke, Cast Steel, Spicer 1310, Checker, Chevy, Dodge, Ford, GMC, Jeep, Each
Part Number: SDH-211544X
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Flywheel, Iron, 164-Tooth, 27.5 lbs. Internal Balance, Jeep, 4.0L, Each
Part Number: CTF-400469
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Air Locker, Dana 30, 27-Spline, 3.73 and Up Ratio, Each
Part Number: ARB-RD100
Not Yet Reviewed
Estimated Ship Date: May 27, 2026 if ordered today
Estimated Ship Date: May 27, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Eaton Electronic ELocker 27 Spline Differential Dana 30 19818-020
Not Yet Reviewed
Estimated Ship Date: Monday 3/23/2026
Spider Gears, Side Gears, Cross Shaft Pin, Cross Shaft Pin Bolt, 27 Spline, Open, Rear, Dana 35, Jeep, Kit
Part Number: CWA-4740670
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Wheel Hub and Bearing Assembly, Front, Jeep, Each
Part Number: MOG-513084
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Universal Joint, Super Strength, 1330 Style, Solid, Steel, Each
Part Number: MOG-254
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
FLYWHEEL ASSM.
Part Number: PIO-FRA-480
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Yoke, Driveshaft Location, 26-spline Inner, Stainless Steel, U-bolt Kit, Pinion Seal, Dana 30, Dana 44, Kit
Part Number: CWA-D3044YOKEUBK
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Axle Shaft, Excel OEM Replacement, Rear Driver Side, 27-spline Inner, Steel, Dana 35, Jeep, Kit
Part Number: RMG-92-31290
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Ring and Pinion Gear Installation Kit, Master Overhaul, 26 Spline, Dana 35, Kit
Part Number: YGA-14109
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Clutch Kit, 1.000 in. - 14-spline, Organic Disc, Pressure Plate, Jeep, 2.5L, Kit
Part Number: LUK-01-040
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Axle Seal, Rear Outer, Avanti, Buick, Chevy, GMC, Chrysler, Dodge, Plymouth, Ford, Lincoln, Mitsubishi, Each
Part Number: TMK-8835S
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Throwout Bearing, 1 1/8 in. Shaft Diameter, Dodge, SUV/Pickup/Van, V6/V8, Each
Part Number: CTF-N1764
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Cover, 10-bolt, Nodular Iron, Red Powdercoated, Dana 44, Each
Part Number: ARB-0750003
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
U-Joint Straps, Spicer 1330 Style, Differential Location, Kit
Part Number: YGA-41199
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
PIVOT, CLUTCH RELEASE LEVER, 1951-2024
Part Number: MOP-52087542
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Differential Cover, 10-bolt, Nodular Iron, Red Powdercoated, Dana 30, Each
Part Number: ARB-0750002
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Estimated Ship Date: Monday 3/23/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster