Availability
Showing In Stock Items. Show All 738 Items.
Fuel Injector System Components, Pressure Transducer, Replacement, 0-100 psi, 0.5-4.5 V Output, 1/8 in. NPT Inlet, 0.875 in. Diameter, Stainless, Each
Part Number: HLY-554-102
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
BUILD IT WITH SUMMIT!
GPS Speed Sensor, Universal, Each
Part Number: SUM-800107
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
GPS Speed Sensor and Interface Module, Each
Part Number: DAK-GPS-50-2
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Tank Sending Unit, 0-90 ohms, Each
Part Number: TNK-TAN-GML
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
GPS Speedometer Interface, 10 hz Sampling Rate, Plug-n-Play, Each
Part Number: ATM-5289
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Gauge Sending Unit, OIl Pressure, 0-100 psi, Electrical, Each
Part Number: DAK-SEN-03-8
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Sending Unit, Oil Pressure, 0-100 psi, 1/8 in.-27 NPT, Each
Part Number: SWW-279B-F
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
MeterMatch Fuel Gauge Interface Module, Fuel Level, Each
Part Number: TNK-TAN-MM
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Sensors, Replacement, Air Temperature, Brass, 3/8 in. NPT, for Holley EFI, Pro-Jection Systems, Each
Part Number: HLY-534-20
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Sending Unit, Oil Pressure, 0-80 psi, 1/8 in.-27 NPT, Each
Part Number: SWW-279A
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Tank Sending Unit, 0-90 ohms, 6 in. Long, For Gasoline, Each
Part Number: TNK-T-GML-06
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
GPS Speed Sensor, Speedometer, Universal, Each
Part Number: IZL-S9020
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Gauge Sending Unit, Digital, 0-300 degrees F, 0-150 degrees C, Water Temperature, Electric, 1/8 NPT, Each
Part Number: DAK-SEN-04-5
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Tank Sending Unit, 73-10 ohms, 5-Bolt, Each
Part Number: TNK-TAN-ORG
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Tank Sending Unit, 0-90 ohms, 10 in. Long, Each
Part Number: TNK-T-GML-10
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Sending Unit, Temperature Sending Unit 1/8 in. NPT, Each
Part Number: ATM-2258
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Tank Sending Unit, 0-90 ohms, 9 in. Long, Each
Part Number: TNK-T-GML-09
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Tank Sending Unit, 0-90 ohms, 7 in. Long, Each
Part Number: TNK-T-GML-07
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Data Acquisition, Racepak, V-Net Module with Sensor, Oil Pressure, 0-150 PSI, Each
Part Number: RPK-220VPPTOP150
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Fuel Tank Sending Unit, 0-90 ohms, 8 in. Long, Each
Part Number: TNK-T-GML-08
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Pressure Sender 0-150 Psi 1/8"-27 Thread 11.4 Psi Warning Contact
Part Number: VDO-360025
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Sending Unit, Floating Ground, Pressure, 0-400 psi, Each
Part Number: VDO-360406
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Sender, Oil Pressure, 1/8 in. NPT, Universal, Each
Part Number: CIN-SN52
Estimated Ship Date: Monday 9/15/2025
Estimated Ship Date: Monday 9/15/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.