Filters
GPS Speed Sensor and Interface Module, Each
Part Number: DAK-GPS-50-2
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
BUILD IT WITH SUMMIT!
GPS Speed Sensor, Universal, Each
Part Number: SUM-800107
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Gauge Sending Unit, Universal Speed and Tachometer, Electrical, Each
Part Number: DAK-SGI-100BT
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Fuel Tank Sending Unit, 0-90 ohms, Each
Part Number: TNK-TAN-GML
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
GPS Speedometer Interface, 10 hz Sampling Rate, Plug-n-Play, Each
Part Number: ATM-5289
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Sending Unit, Oil Pressure, 0-100 psi, 1/8 in.-27 NPT, Each
Part Number: SWW-279B-F
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Fuel Tank Sending Unit, 0-90 ohms, 6 in. Long, Each
Part Number: TNK-T-GML-06
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Sending Unit, Oil Pressure, 0-80 psi, 1/8 in.-27 NPT, Each
Part Number: SWW-279A
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
MeterMatch Fuel Gauge Interface Module, Fuel Level, Each
Part Number: TNK-TAN-MM
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Gauge Sending Unit, OIl Pressure, 0-100 psi, Electrical, Each
Part Number: DAK-SEN-03-8
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
GPS Speed Sensor, Speedometer, Universal, Each
Part Number: IZL-S9020
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Gauge Sending Unit, Digital, 0-300 degrees F, 0-150 degrees C, Water Temperature, Electric, 1/8 NPT, Each
Part Number: DAK-SEN-04-5
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Sending Unit, Temperature Sending Unit 1/8 in. NPT, Each
Part Number: ATM-2258
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Fuel Tank Sending Unit, 0-90 ohms, 9 in. Long, Each
Part Number: TNK-T-GML-09
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Nitrous Pressure Sensor, 150 psi, Stainless Steel, 1/8 in. NPT Male, Kit
Part Number: AVM-30-2130-150
Not Yet Reviewed
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Fuel Tank Sending Unit, 0-90 ohms, 7 in. Long, Each
Part Number: TNK-T-GML-07
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Fuel Tank Sending Unit, 0-30 ohms, 6 in.-24 in. Depth, Each
Part Number: TNK-TAN-GME
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Pressure Sender 0-150 Psi 1/8"-27 Thread 11.4 Psi Warning Contact
Part Number: VDO-360025
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Sending Unit, Water Temperature, 240 Degree F, 1/8 in. x 27 NPT, with Adapters, Electrical, Each
Part Number: SWW-280EA
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Sending Unit, Oil/Water Temperature, 100-280 degrees F, 1/8 in.-27 NPT, Each
Part Number: SWW-280ED-F
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Fuel Tank Sending Unit, 73-10 ohms, 5-Bolt, Each
Part Number: TNK-TAN-ORG
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Fuel Tank Sending Unit, 0-90 ohms, 10 in. Long, Each
Part Number: TNK-T-GML-10
Estimated Ship Date: Monday 4/28/2025
Estimated Ship Date: Monday 4/28/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.