Selected Filters


Loading...

Availability


Eagle H-Beam Connecting Rods

4.68 out of 5 stars 85 Customer Reviews

Free your engine's horsepower on the wings of Eagle H-beam connecting rods. Their 2-piece, forged, vacuum-degassed, 4340-certified steel construction provides outst
Free your engine's horsepower on the wings of Eagle H-beam connecting rods. Their 2-piece, forged, vacuum-degassed, 4340-certified steel construction provides outstanding strength, while still weighing much less than stock rods. Each rod is multi-stage heat-treated, X-rayed, sonic-tested, magnafluxed, 100 percent machined, and then shot-peened to stress-relieve the metal.

The rods have precision cap alignment sleeves to positively locate each rod cap, silicon bronze bushings for floating pin models—and are available in stroker models that allow additional cam-to-rod clearance for large stroke combinations. They c
Free your engine's horsepower on the wings of Eagle H-beam connecting rods. Their 2-piece, forged, vacuum-degassed, 4340-certified steel construction provides outstanding strength, while still weighing much less than stock rods. Each rod is multi-stage heat-treated, X-rayed, sonic-tested, magnafluxed, 100 percent machined, and then shot-peened to stress-relieve the metal.

The rods have precision cap alignment sleeves to positively locate each rod cap, silicon bronze bushings for floating pin models—and are available in stroker models that allow additional cam-to-rod clearance for large stroke combinations. They come standard with 190,000 psi rated ARP 8740 and 230,000 psi rated ARP 2000 rod bolts, or 265,000 psi rated ARP L-19 bolts as upgrades. Instructions and rod bolt lubrication are included. Order the model designed for your vehicle year/make and engine application.

Results 1 - 12 of 12

4340 ROD NISSAN SR20DE(T) 4

Part Number: ESP-CRS5365N3D

Not Yet Reviewed

Estimated Ship Date: Apr 20, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 20, 2026 if ordered today

4340 ROD NISSAN VG 30 6

Part Number: ESP-CRS6071N3D

Not Yet Reviewed

Estimated Ship Date: Apr 20, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 20, 2026 if ordered today

4340 ROD NISSAN SR20DE(T)

Part Number: ESP-CRS5365N3D-1

Not Yet Reviewed

Estimated Ship Date: Apr 20, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 20, 2026 if ordered today

4340 ROD NISSAN KA24 H-BEAM ROD

Part Number: ESP-CRS6496N3D-1

Not Yet Reviewed

Estimated Ship Date: Apr 20, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 20, 2026 if ordered today

4340 ROD NISSAN RB26

Part Number: ESP-CRS4783N3D-1

Not Yet Reviewed

Estimated Ship Date: Apr 20, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 20, 2026 if ordered today

NISSAN CA18 4

Part Number: ESP-CRS5236N3D

Not Yet Reviewed

Estimated Ship Date: Apr 17, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 17, 2026 if ordered today

4340 ROD KA24 H-BEAM ROD 4

Part Number: ESP-CRS6496N3D

Not Yet Reviewed

Estimated Ship Date: Apr 17, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 17, 2026 if ordered today

4340 ROD NISSAN VQ37 CON. ROD 6

Part Number: ESP-CRS5886N3D

Not Yet Reviewed

Estimated Ship Date: Apr 20, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 20, 2026 if ordered today

4340 ROD NISSAN VG-30

Part Number: ESP-CRS6071N3D-1

Not Yet Reviewed

Estimated Ship Date: Apr 20, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 20, 2026 if ordered today

4340 ROD NISSAN RB26 6

Part Number: ESP-CRS4783N3D

Not Yet Reviewed

Estimated Ship Date: Apr 20, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 20, 2026 if ordered today

NISSAN CA18 SINGLE ROD

Part Number: ESP-CRS5236N3D-1

Not Yet Reviewed

Estimated Ship Date: Apr 20, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 20, 2026 if ordered today

4340 H-BEAM ROD NISSAN VQ35 CONN ROD 6

Part Number: ESP-CRS5680N3D

Not Yet Reviewed

Estimated Ship Date: Apr 17, 2026 if ordered today

...Loading

Estimated Ship Date: Apr 17, 2026 if ordered today

  • 1
  • Page 1 of 1