Availability
Front Axle Actuator, Posi-Lok, Dodge, Pickup, Kit
Part Number: POS-400
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
BUILD IT WITH SUMMIT!
Flexplate, 152-tooth, Internal Balance, SFI 29.1, Dodge, Cummins, 6.7L, Each
Part Number: SUM-G136SFI
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Solenoid, for 48RE, Chrysler Automatic Transmission, Governor Pressure Conversion, Each
Part Number: APF-3031002188
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Clutch Kit, StreetPro, Organic, 1 in.- 23-Spline, 11 in. Disc, Chrysler, 360, 383, Kit
Part Number: MCL-75108
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Differential Cover, Nodular Iron, Dana 60, Gray, Kit
Part Number: SDH-10024090
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Wheel Bearing and Hub Assembly, Front, Dodge, Each
Part Number: TMK-HA590166
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Wheel Hub/Bearing Assembly, Replacement, Each
Part Number: TMK-HA590032
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Gear, Ring and Pinion, 3.55:1 Ratio, Chrysler, 9.25 in., Set
Part Number: MGR-C9-25-355
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Flywheels, OE Replacement, Ductile Iron, 143-tooth, 6-bolt, External Engine Balance, Dodge, 5.9L, Each
Part Number: PFT-50-2754
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Axle Bearings, Seals, Rear Left or Right, 1.705 in. Bore, 2.990 in. O.D., Chevy, Chrysler, Dodge, GMC, Ford, Kit
Part Number: MGR-KITR1561TVFO
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Wheel Hub and Bearing Assembly, Front, Steel, Natural, Dodge, Each
Part Number: SKF-BR930502
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pressure Transducer, Valve Body Component, Upgrade, Kit
Part Number: BDD-1060602
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Flexplate, Heavy-Duty, SFI 29.1, 0.105 in., Grade 80 Steel, Use with 7/16 in. Bolts, Mopar, Gen III Hemi to 727, 904, A500, A518, Each
Part Number: HAY-40-518
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Differential Cover, Dana 80 Axle, Nodular Iron, Gray Powedercoated, Each
Part Number: SDH-10023537
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Wheel Hub and Bearing Assembly, Front, Dodge, Each
Part Number: MOG-515101
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Wheel Hub and Bearing Assembly, Front, Dodge, Each
Part Number: MOG-515061
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Flywheel To Crank Spacer, Billet Steel, Designed for Use with A NV5600 Flywheel In A G56 Application, Dodge, Ram, Each
Part Number: VAI-580SPACER
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Ring and Pinion Installation Kit, AAM, 11.5 in., 14-Bolt, Kit
Part Number: MGR-R11-5R
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
U-Joint, Spicer 1350 To GM 3RL/S44/Mechanics 3/American Axle 1344 Combination, Greasable, Steel, Each
Part Number: YGA-42001
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Torque Converter, Remanufactured, Stock Use, 23-spline Input, 10.000 in. Bolt Circle, 11.000 in. Diameter, Dodge, Jeep, Each
Part Number: CCV-TQC94
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Ring and Pinion Installation Kit, Master Kit, Dana 70-U, Kit
Part Number: MGR-R70URMK
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Axles, Direct Fit, Front Left/Right Outer, Steel, 33-Spline, 7.050 in. Length, Dana 60, Dodge, Each
Part Number: SDH-46901
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Manual Transmission Input Shaft, 1.250 in. -10-spline, Hardened Steel, Dodge, New Venture 4500/5600, Kit
Part Number: SBB-S1398
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Driveshaft, Balanced, Assembled, Front, Steel, Length 30.280 in., Diameter 2.500 in., Dodge, Each
Part Number: RNB-938-156
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Torque Converter, Chry 545RFE 03-11 LS Convtr
Part Number: CCV-TQC27LS
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.