Availability
Valve Spring Kit, Dual Valve Springs, Chromoly Retainers, Locks, Seals, Chevy, LS, Kit
Part Number: TFS-2500286P
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Lifters, Hydraulic Roller, Chevy, Set of 16
Part Number: NAL-12499225
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Gen. 3/4 Chevy LS Rocker Arm Trunnion Upgrade Kit, Bronze Bushing, Retrofit, Rectangle and Cathedral Port Rockers, Set of 16
Part Number: SUM-141560
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Valve Covers, Aluminum LS, Center and Perimeter Bolt, Tall, Chevy Logo, Cast Aluminum, Black Satin, Two-Piece, Chevy, LS, 4.8-7.0L, Pair
Part Number: HLY-241-177
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Lifters, Hydraulic Roller, Lifter Trays, Chevy, LS, Kit
Part Number: SUM-HTLSKIT1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Chevy LS Cylinder head, 210cc Cathedral port Intake Runner, 64cc Chamber, 2.02 Intake Valve 1.6 Exhaust Valve, 3.898+ bore sizes, Max .660 Lift, Each
Part Number: SUM-162LS210CATH
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Main Bolts, 6-bolt Mains, Flanged Hex, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-910229
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Harmonic Balancer Bolt, 1.062 in. 12-Point Head, 4.325 in. UHL, Chromoly, Black Oxide, LS Gen. III/IV, Chevrolet, 4.8L, 5.3L, 5.7L, 6.0L, 6.2L, Each
Part Number: ARP-234-2503
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Summit Chevy LS 4340 Forged Steel Crankshaft, 4.000 stroke, 58X Reluctor, Gun-drilled and Lightened, Nitride Hardened, Narrowed Rod Bearings Req.
Part Number: SUM-180LS400058
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Camshaft, Hydraulic Roller, OE Roller, Street/Strip Use, 212 Intake Duration, 0.498 in./0.498 in. Lift, Chevrolet, Small Block LS, Each
Part Number: BTC-S0393
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Main Bearings, H Series, 1/2 Groove, Standard Size, Tri Metal, Chevy, 4.8, 5.3, 5.7L, Set of 5
Part Number: CLE-MS2199H
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 0.060 in. Thick, 377 lbs./in., Factory Valve Guides, Kit
Part Number: BTC-SK001T0560BB
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Stage 3 Pro LS Truck Swap Cam, 222/232 112+5, .550/.550 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2L LS1 LS2 LS6 LS3 LS7 LS9 LSA LQ4 LQ9 LH6 LM7, Each
Part Number: SUM-8713R1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Timing Chain and Gear Set, True Double Roller, Billet Steel, 3 Bolt, No Cam Sensor, Chevy, LS Series, Set
Part Number: SUM-G6602R-B
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Crate Engine, Long Block, LSX454, Hydraulic Roller Tappet, 1-Piece Rear Main, Orange Valve Covers, Gen III/IV LS, Chevy, Each
Part Number: NAL-19417357
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Oil Pan, Engine Swap, Low Profile, Aluminum, Natural, 3.620 in. Stroke, 5.7 Quarts, Chevy, 4.8, 5.3, 6.0L, Each
Part Number: HLY-302-2
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Oil Pan, Steel, Spin-On Filter, Black Powdercoated, 7 Qt. Capacity, Chevy, LS, Kit
Part Number: SUM-G3612B-K
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Connecting Rod, Compstar Extreme, Forged 4340 Steel, H-Beam, Cap Screw, ARP 2000, Bushed, 6.125 in. Length, Chevy, Small Block, LS, Set of 8
Part Number: CPI-C6125DS2A2AX
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Rocker Arm Trunnion Upgrade Kit, Needle Bearing, Chevy, LS, Kit
Part Number: BTC-TK002NB
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Rod Bearings, P Series, TM-77, Chevy, Small Block, Set of 8
Part Number: CLE-CB663P8
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, Maximum Torque for Towing, 205/217 112+2, .500 /.500 Lift, 3-bolt, 4.8, 5.3, 6.0, 6.2
Part Number: SUM-K8718R1
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Crankshaft, Compstar 4340 Forged LS, 4.000 Stroke, Internal Balance, 8 counterweight, 6-bolt Flange, Standard Snout. 58-tooth GM Reluctor, Ea.
Part Number: CPI-APO31Q-CS58
Not Yet Reviewed
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Oil Pan, Low Profile Design, Engine Swap, Aluminum, Natural, 4.000 in. Stroke, 5.9 Quarts, Chevy, 4.8, 5.3, 6.0, 6.2L, Each
Part Number: HLY-302-3
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Pro LS 4340 Forged Steel Crank, 4.000 Stroke, 58X Reluctor, Lightened Rod Journals and Gun-drilled Mains, Std. 6-bolt Flange, Internal balanced, LS3
Part Number: SUM-180LS400058X
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Oil Pump, Standard-Volume, Standard Pressure, Chevy LS, 4.8/5.3/5.7/6.0/6.2L, Each
Part Number: SUM-121170
Estimated Ship Date: Monday 12/8/2025
Estimated Ship Date: Monday 12/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.