Availability
Main Bearings, XP-Series, Standard, Tri Metal, Buick, Cadillac, Chevy, GMC, Hummer, Pontiac, Saab, V8, Set
Part Number: KGB-MB5013XP
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Cylinder Head Studs, ARP2000, 12-Point Nuts, Fastener Lube, Chevy, LS, 2004 and Later, Kit
Part Number: ARP-234-4345
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Pro LS 4340 Forged Steel Crank, 3.622 Stroke, 24X Reluctor, Lightened Rod Journals and Gun-drilled Mains, Std. 6-bolt Flange, Internal balanced, LS1
Part Number: SUM-180LS362224X
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Harmonic Balancer/Crank Pulley, 25 Percent Underdrive, SFI, Internal Balance, Medium Spacing, Chevy, Pontiac, 5.7, 6.0L, Each
Part Number: SUM-C2502
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Pistons, Pro LS 2618 Forged, 4.030 bore, Flat top, 3.622 in. Stroke, 6.098 Rod, Set of 8
Part Number: SUM-3269454030-2
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Performance Roller Lifter Set for LS & Gen 5 LT Engines. (8 pair / Set of 16) Link Bar Style Lifters with .842" body .700" wheel)
Part Number: CXM-M-5290
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Valve Spring Upgrade Kit, 1.300 OD Dual Springs, Retainers/Locks, Seals, All GM LS LS1, LS2, LS3, LS7, LSA, LS9, LQ4, LQ9, L92, L76, LY6
Part Number: SME-174003
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Crate Engine, LSX376-B15, Long Block, 6.2L, 376cid, 473 HP, 9.0:1 Compression, Cast Iron Block, Aluminum Heads, Hydraulic Roller Cam, Chevy, GMC, Each
Part Number: NAL-19434412
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 0.060 in. Thick, 377 lbs./in., Factory Valve Guides, Kit
Part Number: BTC-SK001T0560BB
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Cam Bearings, Direct Replacement, Bi-metal, Lead-Based Micro Babbitt, Chevy, Small Block LS Fits Second and Third Design, Kit
Part Number: DUR-CH-25
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Timing Chain, Single Roller, Chevy, LS2, Fits All Gen. 3/4 LS with Wet Sump oiling, Each
Part Number: SME-143012
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Harmonic Balancer, Serpentine, Aluminum, Black Anodized, Internal Balance, 7.48 in. Diameter, Chevy, 4.8, 5.3, 6.0L, Each
Part Number: ATI-918644
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Harmonic Balancer, Race Performance, Cadillac, Chevy, Pontiac, 5.7, 6.0, 6.2L, Each
Part Number: PBB-PB1117SS
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Rocker Arm Trunnion Upgrade Kit, Needle Bearing Style, Chevy, Small Block LS, Kit
Part Number: BTC-BTRTK001
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Pro LS 2618 Forged Piston, 4.030 bore, 1.110 C.H., 20cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.0 LY6 LQ4 LQ9, Set of 8
Part Number: SUM-110927403020
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Pulleys, Chevy LS Series, Serpentine, Performance Ratio, Billet Aluminum, Black, Water Pump, Alternator, With Power Steering and Air Conditioning, Kit
Part Number: MCH-20095-08
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Lifter, Hydraulic Roller, Chevy, Each
Part Number: TFS-21400002
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rod, Compstar Extreme, Forged 4340 Steel, H-Beam, Cap Screw, ARP 2000, Bushed, 6.125 in. Length, Chevy, Small Block, LS, Set of 8
Part Number: CPI-C6125DS2A2AX
Not Yet Reviewed
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Cam Gear, 3-Bolt, 58/4X, Chevy, V8, LS, Each
Part Number: NAL-12586481
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Cylinder Head Studs, Pro Series, Hex Head, Chevy, 4.8, 5.3, 5.7, 6.0L, Kit
Part Number: ARP-234-4110
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Camshaft, BTR, Red Hot, 221 int. Duration, 0.619 in./0.617 in. Lift, 113 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Gen III/IV LS, Each
Part Number: BTC-BTR-REDHOT
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Crate Engines, Pro Series Chevy LS 427 C.I.D. 625 HP EFI, Long Block, 7.0L/427, Assembled, No Intake/ECU, Chevrolet, Small Block LS, 58X Reluctor,Each
Part Number: MLL-PSLS4272CTF
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Connecting Rods, FSI I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.125 in. Long, GM LS, Set of 8
Part Number: ESP-FSI6125O
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Stage 1 Pro LS Truck Swap Cam, High-Lift version, 209/217 112 + 1 .550/.550 Lift, 3-bolt, 4.8-6.2L, LQ4 LQ9 LY6 LS1 LS2 LY6 LS6 LS7 LS9 LH6, Each
Part Number: SUM-8719R1
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Harmonic Balancer, Serpentine, Internal Balance, Aluminum/Steel, Black, SFI 18.1, Chevy, Pontiac, Each
Part Number: ATI-917303
Estimated Ship Date: Monday 8/25/2025
Estimated Ship Date: Monday 8/25/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.