Availability
Engine Assembly, Stage 1 Crate Engine, Truck, Long Block, 1-Piece Main Seal, Chevy, Small Block, 350, Each
Part Number: HPE-HP32
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifter kit, Stage 2, LS Truck Swap Cam, 218/227 112+2, .522/.524 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, Each
Part Number: SUM-K8701R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, SFI, External Balance, Steel, Clearcoated, Chevy, Big Block, Each
Part Number: SUM-C4264
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crate Engines, GM 396 C.I.D. 491 HP Stroker Base Fully Dressed F.I. Long Block, 6.5L/396, Assembled, Aluminum Heads, Chevrolet, Small Block, Each
Part Number: MLL-BP3961CTF
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Covers, Cast Aluminum, Black Powdercoat, Tall, Chevrolet, Bowtie Emblem, Chevy, Small Block, Pair
Part Number: PRO-141-921
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crate Engine, Long Block, LSX454, Hydraulic Roller Tappet, 1-Piece Rear Main, Orange Valve Covers, Gen III/IV LS, Chevy, Each
Part Number: NAL-19417357
Estimated Ship Date: Dec 1, 2025 if ordered today
Estimated Ship Date: Dec 1, 2025 if ordered today
Oil Pans, Engine Swap, Low Profile, Aluminum, 4.250 in. Stroke, 5.5 Quarts, Chevy, LS, 4.8L, 5.3L, 5.7L, .0L, 6.2L, Kit
Part Number: TSN-81074
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crate Engine, Pro Series 530 HP EFI Base Dressed Long Block, Assembled, Internal Balance, Aluminum Cylinder Heads, Chevrolet, 6.2L LS, Each
Part Number: MLL-PSLS37650CTF
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Head, LS3, Aluminum, Assembled, 68.4cc, 260cc Intake Runner, Each
Part Number: NAL-12675871
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Valve Springs, Retainers, Single Springs, Steel Retainers, Locks, Single Groove, Seals, Chevy Small Block, Kit
Part Number: SUM-174001
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Freeze Plugs, Brass, Chevy, Small Block, Kit
Part Number: SUM-G1581
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifter kit, Pro SBC Hyd. Roller Hot Cam Plus, 218/227 Dur., 112 LSA + 1, .525/.520 1.5 Ratio,1800-6300 RPM Range, '87-02 Gen 1 Roller Block
Part Number: SUM-K8802
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LY6 LY5
Part Number: SUM-8709R1
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Lifters, Maximum Effort Retro Fit, Hydraulic Roller, Vertical Bar, Chevy, Small Block, Set of 16
Part Number: HRS-91160
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Chevy LS 408 Boosted/NOS Short Block 58 Tooth +10cc Dish
Part Number: HPE-SP26-B
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Harmonic Balancer, SFI, Internal Balance, Steel, Clearcoated, Chevy, Big Block, Each
Part Number: SUM-C4263
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Engine and Transmission Combo, Builder Series, LS427/625HP, Standard Edition, EFI, 4L65/70E , Aluminum Heads, 7.0L/427, Chevy LS, Kit
Part Number: MLL-BLS427K4L7
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Crate Engine, GM 383 C.I.D. 436 HP Dressed Stroker Long Block, 4-bolt Mains, 10.0:1 Compression, Throttle Body Style EFI, Chevrolet, 5.7L, 6.3L, Each
Part Number: MLL-BP38318CTFD
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Head, DHC™ 175, Fast As Cast®, Assembled, 1.470 in. Springs, Accessory Bolt Holes, Small Chevy, Each
Part Number: TFS-30210006
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Head, GenX® 260, CNC Competition Ported, Assembled, 70cc CNC Chambers, 450 Lb. Springs, GM LSX, Each
Part Number: TFS-32710002-C01
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Head Fasteners, 12-point Head Style, Stud, ARP2000, Black Oxide, Kit
Part Number: ARP-234-4342
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Pulley Kit, Serpentine, Aluminum, AC, Power Steering, Polished, Chevy, Big Block, Kit
Part Number: EMS-MS107-50BP
Estimated Ship Date: Oct 6, 2025 if ordered today
Estimated Ship Date: Oct 6, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Not Yet Reviewed
Estimated Ship Date: Monday 9/8/2025
Timing Chain and Gear Set, Billet, Double Roller, Billet Steel Sprockets, Chevy, V6/V8, Set
Part Number: CLO-9-3500TX9
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cam and Lifters, Hydraulic Roller Tappet, Advertised Duration 283/303, Lift .511/.498, Chevy, Small Block, Kit
Part Number: CCA-CL12-600-8
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Cylinder Head, Performer RPM, Aluminum, Assembled, 64cc Chamber, 195cc Intake Runner, Chevy 302, 327, 350, 400
Part Number: EDL-60999
Estimated Ship Date: Monday 9/8/2025
Estimated Ship Date: Monday 9/8/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.