Availability
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SCC-SCP1036
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 298/298, Lift .466/.466, Chevy, Small Block, Kit
Part Number: SUM-K1104
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam/Lifters/Timing, Hydraulic Flat Tappet, Advertised Duration 268/268, Lift .454/.454, Chevy, Small Block, Kit
Part Number: CCA-SK12-210-2
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
PRO BBC H.R. 5 Hydraulic Roller Cam, 4/7 Swap, 232/242 Duration @ .050, 111 LSA + 6 Adv. , .620/.620 with 1.7 ratio, .656/.656 with 1.8, 3000-6500
Part Number: SUM-1255
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, Each
Part Number: SUM-K8712R1
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Timing Chain and Gear Set, Single Roller, 1-bolt, Steel Cam and Crank Gear, Tensioner, Oil Control Valve, Cadillac, Chevrolet, GMC, Hummer, Kit
Part Number: MEL-33SRH60HVVT1
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft, BTR, Stage 4 Truck V2, 224 int./230 exh. Duration, 0.553 in./0.553 in. Lift, 109 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR32430090
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft, Hydraulic Roller, Advertised Duration 291/295, Lift .595/.595, Lobe Sep. 112, GM LS, Each
Part Number: TFS-30602004
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rocker Arms, Stud Mount, Full Roller, Stainless Steel, 1.5 Ratio, Fits 7/16 in. Stud, Chevy, Small Block, Set of 16
Part Number: PQX-0235009
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 289/297, Lift .610/.627, Chevy, 525 Marine, Each
Part Number: CCA-01-446-11
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.5 Ratio, 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SCC-SCP1035
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rocker Arm; Ultra Pro Magnum; Rocker Arm; Stud 3/8 in. Ratio 1.52 in.; Chevy Small Block 265-400 cid; 16 pc.
Part Number: CCA-1601-16
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 288/294, Lift .521/.540, Chevy, Big Block, Each
Part Number: CCA-11-433-8
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pro SBC Retrofit Stage 5 Hyd. Roller LS Firing Order Cam, 242/252 Dur., 110 LSA + 4 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 2600-6600 RPM Range
Part Number: SUM-1225
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, Excellent power and torque, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-8710R1
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft, V2 Series, Hydraulic Roller, Retro-fit, Street/Strip Use, LS1 Stage 3 V2, 227 Intake Duration, 0.636 in./0.636 in. Lift, Chevrolet, LS, Each
Part Number: BTC-BTRLS1STAGE3
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 377 lbs./in. Spring Rate, Factory Valve Guides, Kit
Part Number: BTC-SK007-0560BB
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rocker Arms, Aluminum, Pedestal-Mount Roller Rockers, 1.7 Ratio, M8 Bolts, LS Engines, Set of 16
Part Number: PRO-69467
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 244/264, Lift .398/.442, Chevy, 5.0, 5.7L, Kit
Part Number: EDL-3702
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pro SBC Retrofit Stage 6 Hyd. Roller LS Firing Order Cam, 248/256 Dur., 110 LSA + 2 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 3000-7000 RPM Range
Part Number: SUM-1226
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 288/294, Lift .520/.540, Chevy, Small Block, Each
Part Number: CCA-12-433-8
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft, Mechanical Roller Tappet, Advertised Duration 292/297, Lift .582/.588, Chevy, Small Block, Each
Part Number: CCA-12-773-8
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 274/286, Lift .490/.490, Chevy, Small Block, Each
Part Number: CCA-12-246-3
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Rocker Arm Stud Girdle, Aluminum, Natural, 7/16 in.-20 Thread, Chevy, 396-454, Kit
Part Number: BRO-BR1230
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Camshaft, Thumpr, Hydraulic Flat Tappet, Advertised Duration 279/297, Lift .498/.483, Chevy, Big Block, Each
Part Number: CCA-11-600-4
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.