Availability
CHEVROLET Summit Racing Parts and Accessories
Coolant Crossover, Billet Aluminum, -4AN Braided Stainless Hose, LS Throttle Body Bypass Hose Kit, NO Vent, Rear balance Crossover, Kit
Part Number: SUM-220961
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Transmission Pan, Stock Depth, Aluminum, Black Powdercoated, Finned, GM, TH400, Each
Part Number: SUM-G3892B
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Distributor, Ready-to-Run, Billet Aluminum, Magnetic Pickup, Adjustable Collar, Vacuum/Mechanical Advance, Chevrolet V8, Each
Part Number: SUM-850210
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Balancer, Flexplate Combo, 6 3/4 in., Internal Balance, Dampener, Flexplate, Bolts, Chevy, Small Block, Kit
Part Number: SUM-S01482
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Combo, Scat Rally 1000 Seats, Black, Vinyl, Brackets, Sliders, Chevy, Kit
Part Number: CMB-27-0007
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Rocker Arm Stud Girdle, Aluminum, 3/8 in.-24 Thread, Chevy, Small Block, Kit
Part Number: SUM-141001
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Header Adapter Plates, Billet Aluminum, .625 in. Thick, Chevy, Small Block to Stahl flange, Kit
Part Number: SUM-695100
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Carpet, Passenger Area, Loop, Black, Chevy, 68-72, El Camino, W/Automatic Transmission, Each
Part Number: SUM-461021
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
1967-71 Chevy / GMC Truck , V8 , 3/8 in. line , Includes Gaskets and Filter Sock , GM#6428361 , GM , Each
Part Number: SUM-RP20022
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Radiator and Fan Shroud Combo, Aluminum, 3-Row, Pro LS, LS Swap, Chevy, GMC, Each
Part Number: SUM-384084-KIT1
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, Each
Part Number: SUM-K8712R1
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Radiator and Fan Shroud Combo, Performance Fit, 3-Row, Aluminum, Polished, Chevy, Each
Part Number: SUM-384006-KIT1
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Timing Chain and Gear Set, True Roller, Double Roller, Billet Steel Sprockets, Adjustable, Chevy, V6/V8 Small Block, Set
Part Number: SUM-G6600R-BA
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Oil Filter, Canister, 13/16-16 in. Thread, 5.120 in. High, Each
Part Number: SUM-127004
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Water Pump, Mechanical, Long, High-volume, Clockwise, Aluminum, Black Powdercoated, Chevy, Small Block, Each
Part Number: SUM-310116B
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Connecting Rods, 4340, H-Beam, 12-Point, 6.275 in. Length, 0.945 in. Pin, ARP2000 Bolts, Chevy GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-LS6275945
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 370 Cid., 4.030 bore, 3.622 stroke, 24X, 6.125 rod, 12cc Dish, 9.7:1 @ 65cc, 9.3:1 @ 70cc, File-Fit rings, H Bearings
Part Number: SUM-R2436L03012
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Pro LS Rotating Assembly, 365 Cid., 4.005 bore, 3.622 stroke, 24X, 6.125 rod, 2cc Flat Top, 10.8:1 @ 65cc, 10.2:1 @ 70cc, File-Fit rings, H Bearings
Part Number: SUM-R2436L0052
Not Yet Reviewed
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Carpet, Passenger Area, Cut Pile, Black, 85-92 F-body, Chevy, Pontiac, Each
Part Number: SUM-461026
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Valve Covers, 3.5 in. Tall, Die-cast, Aluminum, Black Wrinkle, Bowtie, Chevy, Small Block, Pair
Part Number: SUM-440400
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Carpet, Passenger Area, Loop, Black, 68-72 Chevelle, Buick, Chevy, Oldsmobile, Pontiac, W/Manual Transmission, Kit
Part Number: SUM-461018
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 303/303, Lift .488/.488, Chevy, Small Block, Kit
Part Number: SUM-K1106
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Differential Carrier, Positraction, Nodular Iron, GM 8.875 in., 30 Spline, 3.08 to 3.90 Ratio, Each
Part Number: SUM-730946
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
1978-87 El Camino , Sending Unit, Fuel Tank, 3/8 in. Line, 0 ohms Empty, 90 ohms Full, Chevrolet, 17.5 Gallon Tank , GM#19180450 , Each
Part Number: SUM-RP22014
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Clutch Kit, Street-Strip Performance, 1-1/8 in. Shaft, 26-Spline, 11 in. Organic/Ceramic Disc, GM, Kit
Part Number: SUM-700930
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Estimated Ship Date: Monday 4/13/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster