Availability
Engines & Components
Cylinder Head, Performer RPM, Aluminum, Assembled, 63cc Chamber, 171cc Intake Runner, Mopar, 318, 340, 360, Each
Part Number: EDL-60779
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 5.700 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-25700716
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Engine Oil Accumulator, Marine, 2 Quarts, 12 in. x 4.25 in., Aluminum, Blue, Gauge, Hardware, Valve, Kit
Part Number: CTR-24-126
Not Yet Reviewed
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Pro LS 2618 Forged Piston, 4.065 bore, 1.110 C.H., 6cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-1109274065-6
Not Yet Reviewed
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Lifters, Mechanical Roller, Vertical Link Bar, Chevy, Set of 16
Part Number: CRO-66291H-16
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Pro LS 4340 Rotating Assembly, 416 Cid., 4.070 bore, 4.000 stroke, 58x, 6.125 rod, 21cc dish, 9.9:1 @ 65cc, 9.5:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R584007021
Not Yet Reviewed
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8720-1
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cylinder Heads, Magnum Competition, Aluminum, Assembled, 121cc Chamber, 385cc Intake, Chevy, Pair
Part Number: AFR-2020-TI
Not Yet Reviewed
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cylinder Heads, Aluminum, Assembled, 64cc Chamber, 200cc Intake Runner, Chevy, Small Block, .525 in. Lift Max, for Flat Tappet Cam, Pair
Part Number: SUM-162112
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Crankshafts, Magnum, 4340 Steel, 4.00 in. Stroke, Internal Balance, 58X Reluctor, 1-Piece Main, 2.10 in. Diameter Journal, Lightened, Chevy, LS, Each
Part Number: CPI-APO31V-MG
Not Yet Reviewed
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cylinder Head, Performer RPM, Aluminum, Assembled, 84cc Chamber, 210cc Intake Runner, Mopar, Big Block, Each
Part Number: EDL-60929
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cylinder Head, BB-2 Plus, Aluminum, Assembled, 119cc Chamber, 312cc Intake Runner, Chevy, Big Block, Each
Part Number: BRO-2021012
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Pro LS 4340 Rotating Assembly, 415 Cid., 4.065 bore, 4.000 stroke, 24X, 6.125 rod, 6cc dish, 11.5:1 @ 65cc, 10.9:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R24400656
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Pro LS 4340 Rotating Assembly, 416 Cid., 4.070 bore, 4.000 stroke, 58x, 6.125 rod, 6cc dish, 11.5:1 @ 65cc, 10.9:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R58400706
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.5 Ratio, Fits 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-G6910B
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cylinder Heads, E-210, Aluminum, Assembled, 64cc Chamber, 210cc Intake Runner, Chevy, Small Block, Pair
Part Number: EDL-5087
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Pro LS 4340 Forged Steel Crank, 3.622 Stroke, 58X Reluctor, Lightened Rod Journals and Gun-drilled Mains, Std. 6-bolt Flange, Internal balanced, LS3
Part Number: SUM-180LS362258X
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Connecting Rods, Performance, I-beam Style, Forged 4340 Steel, 6.125 in. Length Center To Center, Chevy GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-LS6125927I
Not Yet Reviewed
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Oil Pan, Circle Track, Wet Sump, Steel, Clear Zinc, 7 qt., Chevy, Small Block, Each
Part Number: CHP-CP106LTRB
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Pro LS 4340 Rotating Assembly, 415 Cid., 4.065 bore, 4.000 stroke, 58x, 6.125 rod, 6cc dish, 11.5:1 @ 65cc, 10.9:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R58400656
Not Yet Reviewed
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Cylinder Heads, E-Street, Aluminum, Assembled, 70cc Chamber, 185cc Intake Runner, Chevy, Small Block, Pair
Part Number: EDL-5073
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 288/296, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8709-1DS
Not Yet Reviewed
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Pro LS Truck Torkinator. 200/205 Dur., 113+4, .550/.550 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, 7.0 Vortec, L59 LR4 LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8727R1
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Harmonic Balancer, SFI, Internal or External Balance, Steel, Clearcoated, Ford, Big Block 385, Each
Part Number: SUM-C4272
Estimated Ship Date: Monday 1/26/2026
Estimated Ship Date: Monday 1/26/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster