Availability
Driveshaft RPM Sensor Kit, 55.5mm / 2.187"
Part Number: SGG-ST269512
Not Yet Reviewed
Estimated Ship Date: Sep 19, 2025 if ordered today
Estimated Ship Date: Sep 19, 2025 if ordered today
Data Acquisition Components MSD Mag Tach Adapter
Part Number: CPK-8060
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
DataMaxx Flow Meter Interface Box will condition and divide the flow meter signal. Does not include flow meter
Part Number: CPK-8056
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
DataMaxx Turbo RPM Kit allows you to read the high RPM that turbos output. Comes with everything needed.
Part Number: CPK-8058
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
DataMaxx Diesel RPM Kit allows you to measure Engine RPM from the teeth of a flywheel instead of a magnet.
Part Number: CPK-8059
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Autometer Diesel RPM Pickup only. Does not include the required Diesel Tach Interface Box.
Part Number: CPK-8063
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
Dakota Digital Diesel Tach Interface Box allows the Autometer Diesel pickup to read to your DataMaxx.
Part Number: CPK-8064
Not Yet Reviewed
Estimated Ship Date: Sep 23, 2025 if ordered today
Estimated Ship Date: Sep 23, 2025 if ordered today
IQ3 LOGGER DASH
Part Number: RPK-25DSIQ3LD
Not Yet Reviewed
Estimated Ship Date: Sep 19, 2025 if ordered today
Estimated Ship Date: Sep 19, 2025 if ordered today
Data Acquisition, Racepak, V-Net Connector Module, Analog, 0-5 Volt Input, 12 Volt Ouput, Each
Part Number: RPK-230VMAN12V
Not Yet Reviewed
Estimated Ship Date: Sep 19, 2025 if ordered today
Estimated Ship Date: Sep 19, 2025 if ordered today
SHAFT SENSOR HE METAL
Part Number: RPK-80SSMSC3
Not Yet Reviewed
Estimated Ship Date: Sep 19, 2025 if ordered today
Estimated Ship Date: Sep 19, 2025 if ordered today
Data Logging Unit Cable
Part Number: RPK-280CAVMT009T
Not Yet Reviewed
Estimated Ship Date: Sep 19, 2025 if ordered today
Estimated Ship Date: Sep 19, 2025 if ordered today
Data Acquisition, Racepak, Module PT2, 15 PSI, Each
Part Number: RPK-810MDPT215
Not Yet Reviewed
Estimated Ship Date: Sep 19, 2025 if ordered today
Estimated Ship Date: Sep 19, 2025 if ordered today
Power DistributionModule, USB-A MALE TO USB-A FML 6'
Part Number: RPK-890CAUSBAA6
Not Yet Reviewed
Estimated Ship Date: Sep 19, 2025 if ordered today
Estimated Ship Date: Sep 19, 2025 if ordered today
Data Acquisition Components, CD Dash Button Kit, Compatible with CD Carbon Digital Dashes, 1 Blue and 1 Yellow Button with 20 in. Leads, Pair
Part Number: AVM-30-3610
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Digital Dashboard Displays, CD-5 Carbon, LED, Carbon Fiber Composite Housing, Wiring Harness, OBD II Compatible, Each
Part Number: AVM-30-5600F
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Data Acquisition Kits and Displays, CD-7 Digital Racing Dash Displays, LED, Carbon Fiber Composite Housing, Wiring Harness, Each
Part Number: AVM-30-5701F
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
PNO ADAPTER
Part Number: AVM-30-2220
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
CD Carbon Adapter Cable
Part Number: AVM-30-2227
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Power DistributionModule, MODULE 60 PSI
Part Number: RPK-810-MD-PT-60
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
MODULE TD2 STRAIN GAUGE AMP
Part Number: RPK-810-MD-SG2
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Power DistributionModule, MODULE VACUUM
Part Number: RPK-810-MD-VAC
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Power DistributionModule, CONNECTOR KIT AMP LAMBDA 6
Part Number: RPK-810CNLAMBDA
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Data Acquisition Components, Plug-In Old-Style Transducer Modules, Pressure Transducer Sensor, 0-200 psi Range, Street Performance, Each
Part Number: RPK-810MDPT200
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Data Acquisition, Racepak, Module PT2, 100 PSI, Each
Part Number: RPK-810MDPT2100
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Data Acquisition, Racepak, Module PT2, 150 PSI, Each
Part Number: RPK-810MDPT2150
Not Yet Reviewed
Estimated Ship Date: Sep 22, 2025 if ordered today
Estimated Ship Date: Sep 22, 2025 if ordered today
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.