Availability
Camshaft, BTR Stage 4 Turbo V2, 227 int./240 exh. Duration, 0.618 in./0.618 in. Lift, 115 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, 6.2L, Each
Part Number: BTC-BTRTURBOSTG4
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS 4340 Rotating Assembly, 367 Cid., 3.820 bore, 4.000 stroke, 24X, 6.125 rod, 12cc dish, 10:2 @ 61cc, 9.8:1 @ 65cc, File-Fit Rings, H Bearings
Part Number: SUM-R244082012
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Main Bearings, HP Series, 1/2 Groove, Standard Size, Bi Metal, Chevrolet, 5.7L, Set of 5
Part Number: KGB-MB5013HPSTDX
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Cylinder Head, Assembled, 68cc Combustion Chamber, 276cc Intake Runner, 92cc Exhaust Runner, Aluminum, Chevy, LS, Each
Part Number: FLK-LS3-505
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Timing Gears, Cam Gear, 4-Pole, 3-Bolt, 58X, Iron, Chevy, LS, Each
Part Number: BTC-BTR86481
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS Piston and Rod Kit, 365 Cid., 4.005 bore, 3.622 stroke, 6.098 rod, 2cc Flat Top, 10.8:1 @ 65cc, 10.2:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR360052
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Twisted Wedge® Track Heat® Valve Spring Upgrade, Steel Retainers, Steel Locks, 3-Groove, Ford, 4.6L/5.4L 2V, Kit
Part Number: TFS-2500525
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Camshaft, BTR, Stage 3 Truck V2, 218 int./224 exh. Duration, 0.553 in./0.553 in. Lift, 110 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR31824100
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Piston Rings, Plasma-moly, 4.065 in. Bore, 1.5mm, 1.5mm, 2.5mm Thickness, 8-Cylinder, Set
Part Number: HSN-2M5292
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 283/297, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8711-1DS
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Camshaft Retainer Plates, Solid Type, Steel, Chevy GM, LS/LSX, Gen III/IV. Each
Part Number: SUM-150107
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Oil Pickup, Press Fit, 8 in. Pan Depth, 0.750 in. Tube Diameter, Chevy, GMC, Big Block, Each
Part Number: MEL-305S
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 275/283, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8706-1DS
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Accessory Drive Systems, LS Mid-mount, Serpentine, Alternator, Water Pump, Counterclockwise, Power Steering, GM 2, Black Finish, Chevy, 4.8-7.0L, Kit
Part Number: HLY-20-186BK
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Camshaft Kits, HRT Stage 1, Hydraulic Roller, Advertised Duration 269/279, Lift 0.520/0.515, Valve Springs, Chrysler, Dodge, Jeep, Ram, 5.7L, Kit
Part Number: CCA-CK201-300-17
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Lifter Valley Plate, Aluminum, Natural, GM, LS3, Each
Part Number: NAL-12599296
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Crate Engine, Remanufactured, Long Block, Assembled, GM, 6.0L, Each
Part Number: VRE-DCTF
Not Yet Reviewed
Estimated Ship Date: Feb 6, 2026 if ordered today
Estimated Ship Date: Feb 6, 2026 if ordered today
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, Standard Clearance, Racing 270 Deg. Oil groove, set
Part Number: SUM-7298HS
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Valve Covers, Stock Height, Cast Aluminum, Natural, Plain, Chevy, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0L, Pair
Part Number: SUM-440365
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Camshaft, BTR, Stage 4 Truck V2, 224 int./230 exh. Duration, 0.553 in./0.553 in. Lift, 109 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR32430090
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Pro LS 4340 Forged Steel Crank, 3.622 Stroke, 58X Reluctor, Lightened Rod Journals and Gun-drilled Mains, Std. 6-bolt Flange, Internal balanced, LS3
Part Number: SUM-180LS362258X
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Connecting Rods, 4340, H-Beam, 12-Point, 6.275 in. Length, 0.945 in. Pin, ARP2000 Bolts, Chevy GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-LS6275945
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Lifters, Evolution Series Hydraulic Roller, 0.842 in. O.D., 2.660 in. Lifter Seat Height, LSX and Warhawk Blocks, Chevrolet, Small Block LS, Set of 16
Part Number: CCA-89571-16
Not Yet Reviewed
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Lifters, Short Travel XD Hydraulic Roller, Horizontal Link Bar, 0.842 in. O.D., Chevy, GMC, Small Block LS, Set of 16
Part Number: CCA-15956XD-16
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Connecting Rods, I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.125 in. Long, GM LS, Set of 8
Part Number: OLV-L6125-STSW8
Estimated Ship Date: Monday 12/29/2025
Estimated Ship Date: Monday 12/29/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.