Availability
1989 Engines & Components
Oil Pan, Steel, Black, 7 qt., Chevy, Big Block, Each
Part Number: MOR-20451
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Rocker Arms, Roller Tip, Self-Aligning, Cast Steel, 3/8 in. Stud Mount 1.6 Ratio, Polylocks, Ford, 289, 302, 351W, Set of 16
Part Number: SUM-141702PL
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Harmonic Balancer, Powerforce Series, 50 oz. External Balance, Nodular Iron, Black, Ford, Small Block, Each
Part Number: PFS-80007
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Timing Chain and Gear Set, Billet, Double Roller, Billet Steel Sprockets, Ford, 429/460, Set
Part Number: CLO-9-3522X9
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Forged Pro Mopar SB 4340 Forged Steel I-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-MOP61238I
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Oil Pump and Pickup Assembly, High-Volume, Chevy, Small Block, Kit
Part Number: MOR-22134
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Crankshaft, 2-Piece Seal, Internal Balance, Forged 4340 Steel, 4.250 in. Stroke, Chevy, 454, Each
Part Number: ESP-445442526385
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Crankshaft, Internal Balance, Forged 4340 Steel, 3.00 in. Stroke, Ford, 302, Each
Part Number: ESP-430230015090
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Cylinder Head Bolts, High Performance, 12-Point, Ford, 289-302, with Stock, Edelbrock Performer, RPM Heads
Part Number: ARP-154-3701
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Timing Chain and Gear Set, Double Roller, Billet Steel Sprockets, Chevy, Big Block V8, Set
Part Number: HRS-94305
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Oil Pump, Standard-Volume, Standard-Pressure, Chevy, Small Block, Each
Part Number: MEL-M55A
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Rocker Arm System, Sportsman, Shaft, Full-Roller, 1.6 Ratio, Aluminum, Chevy, Small Block, Kit
Part Number: JES-KSS-416060
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Timing Chain and Gear Set, Magnum Double Roller, Steel Sprockets, Chevy, 262/305/350, Set
Part Number: CCA-2136
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Crankshaft, 28 oz. External Balance, Forged 4340 Steel, 3.400 in. Stroke, Ford, 302, Each
Part Number: SCA-43023
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pulley Kit, Serpentine, Aluminum, Clear Powdercoated, Chevy, Small Block, Kit
Part Number: MCH-22072
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Power Steering Brackets, Driver Side, Upper and Lower, Steel, Chrome, Kit
Part Number: SUM-341211
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Oil Pan, Aluminum, Natural, 6 qt., Stroker Clearanced, Chevy, Big Block, Each
Part Number: MOR-20385
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
SB Chevy Forged Steel Crank, 3.750 Stroke, 1967-86 Blocks with 2-pc. RMS, Lightened, Nitride, Lightened and Bullnosed, Designed for 6.000 in. Rod
Part Number: SUM-SBC35037502P
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Oil Filter, Replacement, 21 Micron, 5.197 in. Tall, 3.661 in. OD, 3/4-16 in. Thread, Each
Part Number: WIX-51515
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Pistons, Forged, Flat, 4.030 in. Bore, Ford, Set of 8
Part Number: SUM-17370FC-30
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Engine and Accessory Fasteners, Black Oxide, Hex, Chevy, Big Block, Kit
Part Number: ARP-535-9801
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Lifter, Hydraulic Roller, Chrysler, Dodge, Plymouth, Each
Part Number: SLP-HT2269
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Valve Covers, Slant Edge, Tall, Perimeter Bolt, Cast Aluminum, Natural, Chevrolet Logo Top Style, Chevrolet, Big Block, Pair
Part Number: PRO-141-869
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Rod Bearings, Direct Replacement,Tri-Metal, TM-77, Set of 8
Part Number: CLE-CB743P108
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Timing Cover, One-piece, Steel, Natural, Oil Pump Kit, Oil Pump Cover, Jeep, 5.0L, 5.9L, Kit
Part Number: CWA-8129373K
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Estimated Ship Date: Monday 2/16/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster