Selected Filters


Loading...

Availability


1985 Summit Racing Engines & Components

Individual Parts

Results 651 - 675 of 996

Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 280/280, Lift .467/.467, Chevy, Small Block, Kit

Part Number: SUM-K00132

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Rocker Arms, Gold Series, Full Roller, 1.5 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16

Part Number: SUM-G6811G

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Cam and Lifters, Mechanical Flat Tappet, Advertised Duration 298/304, Lift .562/.584, Chevy, Small Block, Kit

Part Number: SUM-CT109K

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Pro BBF Big Block 385 Ser. Best Hydraulic Roller Cam 3, 224/236 Duration, 111 LSA + 4 Adv. .582/.582 lift 1.75 ratio, 3,000 to 6,000 basic rpm,429 460

Part Number: SUM-8932

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Engine Re-Ring, 4.040 in. Bore, .010 in. Rod, .010 in. Main, Chevy, Kit

Part Number: SUM-RRKIT1-411

2.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Oil Pan, Double Sump, Steel, Chrome Plated, 5 qt., Ford, Mercury, 5.0L, Each

Part Number: SUM-123457

3.64 out of 5 stars ( 11 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Valve, Intake, Stainless Steel, 2.020 in. Diameter, .341 in. Stem, 4.911 in. Length, Chevy, Each

Part Number: SUM-V8002-1

5.0 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Timing Chain and Gear Set, Standard, Link Belt, Steel Sprockets, Chevy, Big Block, Set

Part Number: SUM-G6511

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Valve Covers, Stock Height, Steel, Chrome, Summit Logo, Baffled, Ford, Small Block, Pair

Part Number: SUM-G3321

4.29 out of 5 stars ( 7 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Oil Pump and Pickup Assembly, High-Volume, Chevy, Big Block, Kit

Part Number: SES-3-90-08-005

5.0 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Camshaft, Hydraulic Flat Tappet, Advertised Duration 260/260, Lift .427/.427, Chevy, Small Block, Each

Part Number: SUM-1787

4.83 out of 5 stars ( 6 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, SBC 350 Main .001 Extra Clearance, Half-Upper groove, set

Part Number: SUM-909HXS

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Engine Kit, Crank, Flat-Top Piston/Moly Ring, Rod, Main, Gaskets, Oil Pump, Timing Set, Chevy, 355, Kit

Part Number: SES-3483006050

Not Yet Reviewed

Cannot be shipped Internationally if shipped by air

...Loading

Cannot be shipped Internationally if shipped by air

Timing Chain and Gear Set, Standard, Link Belt, Steel Sprockets, Mopar, Small Block, Set

Part Number: SUM-G6502

5.0 out of 5 stars ( 4 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Counterweight, Harmonic Balancer, Bolt-On, 50 oz. External Balance, Ford, Small Block, Each

Part Number: SUM-25270

4.57 out of 5 stars ( 7 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Chrysler LA Long Snout Hydraulic Roller Cam 1, 212/218 Duration, 111 LSA + 2 Adv. .525/.520 lift 1.5 ratio, .560/.554 1.6 ratio, 1,800-5,800 rpm

Part Number: SUM-5770

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .001 Extra Clearance for .010 undersize, Half-Upper groove, set

Part Number: SUM-909H009

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Chrysler LA Long Snout Best Hydraulic Roller Cam 4, 232/248 Duration, 112 LSA + 5 Adv. .550/.550 lift 1.5 ratio, .587/.587 1.6 ratio, 3,400-6,900 rpm

Part Number: SUM-5773

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Crankshaft Pulley, V-Belt, 1-Groove, 6.875 in., Steel, Chrome, Chevy, Small Block, Long Pump, Each

Part Number: SUM-G3956

3.67 out of 5 stars ( 3 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Rocker Arm, Stud Mount, Full Roller, Aluminum, 1.7 Ratio, Fits 7/16 in. Stud, Chevy, Big Block, Each

Part Number: SUM-G6930B-1

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Engine Dress-Up Kit, Steel, Chrome, Chevy, Big Block, Kit

Part Number: SUM-7002SMT

4.5 out of 5 stars ( 2 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Connecting Rods, 4340, I-Beam, Thru-Bolt, 5.700 in. Length, 475 HP, Chevy, Small Block, Set of 8

Part Number: SUM-180370P

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .001 undersize (thicker), Half-Upper groove, set

Part Number: SUM-909H001

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Rod Bearings, Direct Replacement, 0.020 in. Crankshaft Undersize, Bi Metal, Ford, Small Block, Set of 8

Part Number: SUM-171120

4.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air

Cam and Lifter kit, Pro SBC Retrofit Stage 6 Hyd. Roller LS Firing Order, 248/256 Dur., 110 LSA + 2 Adv, .550/.550 1.5 Ratio, 3000-7000 RPM Range

Part Number: SUM-K1226

Not Yet Reviewed

Estimated Ship Date: Monday 3/30/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/30/2026 if shipped by air