Availability
1985 Summit Racing Engines & Components
PRO BBC H.R. 12 Hydraulic Roller Cam, 4/7 Swap, 276/285 Duration @ .050, 114 LSA + 8 Adv. , .700/.700 with 1.7 ratio, .741/.741 with 1.8, 4300-7200
Part Number: SUM-1262
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Pointer, Billet Aluminum, Black Anodized, Chevy, 8 in. Balancer, For SUM-G6316, Big Block, Each
Part Number: SUM-G6316-8
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Forged Pro pistons for Chrysler 360, 4.030 bore, 1.670 C.H., 3.580 in. stroke, 6.123 in. rod, 7cc flat top 10.8@60cc, 10.4@63cc, 10.2@65cc, 9.4@73cc.
Part Number: SUM-SBM360030
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arms, Gold Series, Full Roller, 1.7 Ratio, Aluminum, Gold Anodized, Chevy, Big Block, Set of 16
Part Number: SUM-G6830G
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pump Fasteners, Studs, Steel, Black Oxide, Chevy, Small Block, Each
Part Number: SES-3-60-08-000
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Connecting Rods, Performance, H-beam Style, Forged 4340 Steel, 6.200 in. Length, 2.123 rod journal, .927 pin, Ford, 5.8L Windsor, Set of 8
Part Number: SUM-SBF620028H
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arm, Stud Mount, Full Roller, Aluminum, 1.6 Ratio, Fits 3/8 in. Stud, Chevy, Small Block, Each
Part Number: SUM-G6920B-1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Forged Pro pistons for 383 Stroker Chevy Long Rod, 4.040 bore, 1.125 C.H., 3.75 in. stroke, 6 in. rod, 9cc reverse dome 10.5@64cc, 10.1@67cc, 9.7@72cc
Part Number: SUM-SBC383040L
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Forged Pro pistons for 383 Stroker Chevy, 4.040 bore, 1.425 C.H., 3.75 in. stroke, 5.7 in. rod, 9cc reverse dome 10.5@64cc, 10.1@67cc, 9.7@72cc.
Part Number: SUM-SBC383040
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, Mopar SB, .010 undersize (thicker), set
Part Number: SUM-481H010
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Piston, Hypereutectic, Flat, 4.030 in. Bore, Chevy, Each
Part Number: SUM-17350C-30-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Counterweight, Harmonic Balancer, Bolt-On, External Balance, Mopar, Small Block, Each
Part Number: SUM-65278
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Stage 7 Hyd. Flat-Tappet 4/7 Firing Order Swap, 248/256 Dur., 108 LSA + 2 Adv, .518/.525 1.5 Ratio, 3000-7000 Range
Part Number: SUM-K1206
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro SBC CT1 Hydraulic Roller Cam 1, LS Firing Order, 232/248 Dur., 110 LSA, +4 Adv., .530I/.530E Lift with 1.5, .565I/.565E Lift with 1.6, Retrofit
Part Number: SUM-8815
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Main Bearings, Race Series Main Bearing Sets, Stock Crankshaft Size, Tri-metal Copper-lead Alloy, Chevrolet, Big Block, Set of 5
Part Number: SUM-829HNS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Engine Dress-Up Kit, Steel, Chrome, Valve Covers, Air Cleaner, Breathers, Ford, Small Block, SBF, Kit
Part Number: SUM-CSUMG300
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 7 Hyd. Roller LS Firing Order, 252/258 Dur., 110 LSA + 2 Adv, .550/.550 1.5 Ratio, 3200-7200 RPM Range
Part Number: SUM-K1227
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Forged Pro pistons BB Chevy 540, 4.500 bore, 1.270 C.H., 4.25 in. stroke, 6.385 in. rod, 8cc open/closed ch. Dome 10.6@110cc, 10.2@114cc, 10:1@119cc.
Part Number: SUM-BBC540STD
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 351 Windsor Standard Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1432HS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Alternator Bracket, Aluminum, Satin, Cylinder Head Mount, Long Water Pump, Chevy, Big Block, Kit
Part Number: SME-2025
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Engine Re-Ring, 4.040 in. Bore, .020 in. Rod, .020 in. Main, Chevy, Kit
Part Number: SUM-RRKIT1-422
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Engine Re-Ring, 4.030 in. Bore, .020 in. Rod, .010 in. Main, Chevy, Kit
Part Number: SUM-RRKIT1-321
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Engine Re-Ring, 4.030 in. Bore, .030 in. Rod, .030 in. Main, Chevy, Kit
Part Number: SUM-RRKIT1-333
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Engine Dress-Up Kit, Steel, Chrome, Chevy, Big Block, Kit
Part Number: SUM-7002SMT
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rod Bearings, Direct Replacement, 0.030 in. Crankshaft Undersize, Bi Metal, Chevy, Big Block, Set of 8
Part Number: SUM-171230
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster