Availability
Lifters, Delphi LS7 Hydraulic Roller, 0.842 in. O.D., Chevrolet, Set of 16
Part Number: BTC-X12499225-16
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Camshaft, BTR, Truck Norris Cam, 212 int. Duration, 0.553 in./0.553 in. Lift, 107 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Gen III/IV LS, Each
Part Number: BTC-TRUCKNORRIS
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.400 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7400312-16
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Camshaft, Hydraulic Roller, OE Roller, Street/Strip Use, 212 Intake Duration, 0.498 in./0.498 in. Lift, Chevrolet, Small Block LS, Each
Part Number: BTC-S0393
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Valve Spring Kit, Platinum, Dual, Standard, Steel Retainer, 0.060 in. Thick, 377 lbs./in., Factory Valve Guides, Kit
Part Number: BTC-SK001S0560BB
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Rocker Arm Trunnion Upgrade Kit, Needle Bearing, Chevy, LS, Kit
Part Number: BTC-TK002NB
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 0.060 in. Thick, 377 lbs./in., Factory Valve Guides, Kit
Part Number: BTC-SK001T0560BB
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.350 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7350312-16
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Camshaft, BTR, Red Hot, 221 int. Duration, 0.619 in./0.617 in. Lift, 113 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Gen III/IV LS, Each
Part Number: BTC-BTR-REDHOT
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Rocker Arm Trunnion Upgrade Kit, Needle Bearing Style, Chevy, Small Block LS, Kit
Part Number: BTC-BTRTK001
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Lifter Guide, Hydraulic Roller Style, Plastic, Chevrolet, LS/LT, Non AFM/DOD Engines, Set of 4
Part Number: BTC-BTR95365-4
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.300 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7300312-16
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Valve Springs, Beehive Valve Spring Kits, Single, 0.625 in. Maximum Valve Lift, 1.285 in./1.020 in. Outer Spring O.D., Chevy, Small Block LS, Kit
Part Number: BTC-BTR-SK018
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.375 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7375312-16
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Rocker Arms, Full Roller, Shaft Mounting Style, 1.7 Ratio, Steel, Chevrolet, 5.7L, 6.0L, Kit
Part Number: BTC-S0410
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Camshaft, BTR, Stage 2 Truck V2, No Springs Required, 212 int./218 exh. Duration, 0.480 in./0.480 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-31218110NSR
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Valve Springs, Single, Beehive, 1.260 in. O.D., 285 lbs./in. Spring Rate, 1.150 in. Coil Bind Height, Set of 16
Part Number: BTC-SP011-16
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Camshaft, Hydraulic Roller, Street/Towing Use, L86 DOD Delete, 200/206 Duration, 0.549 in./0.522 in. Lift, Chevrolet, 5.3L/6.2L Gen V, Each
Part Number: BTC-2240006175
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Camshafts, BTR, LS3 Stage 3 V2, 227 int. Duration, 0.636 int./0.636 exh. Lift, 111.5 LSA, 3-Bolt, Chevy, LS3, 6.2L, Each
Part Number: BTC-BTRLS3STAGE3
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Camshaft, V2 Series, Hydraulic Roller, Turbocharged Use, Stage 3 Turbo, 224 Intake Duration, 0.618 in./0.618 in. Lift, Chevy, 4.8/5.3/6.0/6.2L, Each
Part Number: BTC-BTRTURBOSTG3
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.425 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7425312-16
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.325 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7325312-16
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Camshaft, BTR, L83 Stage 2, 212 int., 223 exh Duration, 0.540 in./0.540 in. Lift, 111 Lobe Sep, 1-Bolt, 5.3L, 6.2L, Gen V LS, 14% Fuel Lobe, Each
Part Number: BTC-2241023116R1
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Rocker Arms, Shaft, Roller, 1.7 Ratio, for LS3 Heads, Chevy, 6.2L, Kit
Part Number: BTC-S0432
Not Yet Reviewed
Estimated Ship Date: Jun 16, 2025 if ordered today
Estimated Ship Date: Jun 16, 2025 if ordered today
Camshaft, BTR, Stage 2 Truck V2, 212 int./218 exh. Duration, 0.553 in./0.553 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR31218110
Not Yet Reviewed
Estimated Ship Date: Monday 6/9/2025
Estimated Ship Date: Monday 6/9/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.