Availability
Rocker Arm Nut, Stud Girdle Adjusting Nut, Full Roller, 7/16-20 in. Thread, Each
Part Number: SUM-141005
Not Yet Reviewed
Estimated Ship Date: Sep 5, 2025 if ordered today
Estimated Ship Date: Sep 5, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Combo, Cloyes, Timing Chain and Gear Set, Timing Cover, Cam Button, Lock Plate, RTV, Chevy, Big Block, Kit
Part Number: CMB-08-0020
Cannot be shipped Internationally
Cannot be shipped Internationally
Pulley, Power steering, Steel, Chrome, 1-Groove, V-Belt, 5.75 in. Diameter, .625 in. Bore, Keyway, Chevy
Part Number: SUM-G3973
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Camshaft, Mechanical Flat Tappet, Advertised Duration 287/295, Lift .537/.555, Chevy, Small Block, Each
Part Number: SUM-CT102
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Cam and Lifter KIt Muscle Car Replacement SBC Flat tappet Mechanical, LT-1 370 hp 350 Cam with Lifters
Part Number: SUM-K1124
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Piston Rings, Plasma Moly Steel Top, Martensitic Ductile Napier Second, Std. Tension Oil, File Fit for 3.820 in. Bore, 1.5mm, 1.5mm, 3.0mm, Set
Part Number: SUM-136SM8531045
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main Standard Clearance, Half-Upper groove, set
Part Number: SUM-909HS
Not Yet Reviewed
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Pistons, Forged Aluminum, Flat, 4.020 in. Bore, 1.115 in. Compression Height, 0.927 in. Pin, Chevy, LS, Set of 8
Part Number: SUM-17406C-20
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Water Pump Pulley, V-Belt, 1-Groove, 2-13/16 in. Height, Steel, Black, Chevy, Small Block, Short Pump, Each
Part Number: SUM-G3950B
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Oil Pan, Steel, Chrome Plated, 4 qt., Chevy, Big Block, Each
Part Number: SUM-G3510
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Muscle Car Camshaft, L88 427, Mechanical Flat Tappet, 3,200-6,500 RPM Range, Adv.Duration 342 int./333 exh., Lift 559 int./580 exh., Chevy, Each
Part Number: SUM-1322
Not Yet Reviewed
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Oil Pump and Pickup Assembly, High-Volume, Oldsmobile, 260-455, Kit
Part Number: SES-7-60-08-017
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 260/260, Lift .427/.427, Chevy, Small Block, Kit
Part Number: SUM-K00032
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Muscle Car Camshaft, 375HP396, Mechanical Flat Tappet, 2,200-5,500 RPM Range, Adv.Duration 310 int./297 exh., Lift 520 int./520 exh., Chevy, Each
Part Number: SUM-1321
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Valve Cover Bolts, Replacement, Hex, Steel, Chrome, 1/4-20 in. Thread Size, Chevy, 5.0L, 5.7L, Set of 8
Part Number: SUM-910218
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Piston Rings, Pro GPX Gas Ported, 4.310 in. Bore, File Fit, Gas Nitrided, 1/16 in., 1/16 in., 3/16 in. Thickness, V8, Set
Part Number: SUM-GP431016
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Main Bearings, 1/2 Groove, Standard Size, Bi Metal, Silicon Aluminum, Ford, 221-302, Set of 5
Part Number: SUM-172100
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Timing Cover, 1-Piece, Steel, Chrome Plated, Chevy, Small Block, Each
Part Number: SUM-G3200
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Pistons, Hypereutectic, Flat, 4.040 in. Bore, Ford, SBF, Set of 8
Part Number: SUM-17302C-40
Not Yet Reviewed
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 278/290, Lift .471/.471, Ford, Big Block, Each
Part Number: SUM-3501
Not Yet Reviewed
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Forged Pro pistons for SB Chevy 350, 4.060 bore, 1.560 C.H., 3.48 in. stroke, 5.7 in. rod, 5cc flat top 11:1@58cc, 10.2@64cc, 9.9@67cc, 9.4@72cc.
Part Number: SUM-SBC350060
Not Yet Reviewed
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Bellhousing Dowel Pins, .625 in. Diameter, .014 in. Offset, Buick, Chevy, Oldsmobile, Pontiac, Pair
Part Number: SUM-192006
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Summit HDR LS1 LS2 LS3 LQ9 Pushrods 5/16 7.375 Length, Premium One-Piece .105 Wall 4130 Seamless Chromoly 210 degree ends, Heat-Treated, Set of 16
Part Number: SUM-14957375
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Engine Rotating Kits, Pro LS Crank and Rod Kits, Forged 4340 Steel, 6.098 in. Connecting Rod Length, 3.622 in. Stroke, Chevy, 5.3L, 6.0L, 6.2L, Kit
Part Number: SUM-CR3658098
Not Yet Reviewed
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Stage 5.5 Pro LS Twin-Turbo Cam. 251/255 Dur., 117 + 6, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LQ4 LQ9, Each
Part Number: SUM-8726R1
Not Yet Reviewed
Estimated Ship Date: Monday 7/14/2025
Estimated Ship Date: Monday 7/14/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.