Filters
Rocker Arms, Stud Mount, OEM-Style, Stamped Steel, 1.5 Ratio, Fits 3/8 in. Stud, Chevy, Small Block, Set of 16
Part Number: SUM-G6800
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Replica Block, Steel, Natural, Includes Hardware, Chevy, LS, Each
Part Number: SUM-774001
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Pushrods, Chromoly, Heat-Treated, 5/16 in. Diameter, 7.500 in. Length, Universal, Set of 16
Part Number: SUM-1457500
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Summit Chevy LS 4340 Forged Steel Crankshaft, 3.622 stroke, 58X Reluctor, Gun-drilled and Lightened, Nitride Hardened, Narrowed Rod Bearings Req.
Part Number: SUM-180LS362258
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Crankshaft, Cast Steel, 3.750 in. Stroke, Chevy, 400, OEM Balance, 2-Piece Seal, Each
Part Number: SUM-180369
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Oil Pickup, High Volume, Press Fit, Street/Strip Pan Style, 8 in. Pan Depth, 0.75 in. Tube Dia., Chevy, Big Block, Ea.
Part Number: SUM-G3623
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Vacuum Pump, Black, 23 in/hg Maximum Vacuum, 12 V DC, Internal Vacuum Control, 7.75 in. Height, 6.5 in. Length, 6 in. Width, Each
Part Number: SUM-760140-B
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 277/287, Lift .502/.501, Chevy, Big Block, Kit
Part Number: SUM-K1301
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Cam Bearings, Steel Backed Babbitt, Chevy, Small Block, Kit
Part Number: SUM-173000
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Housing, Rear Main Seal, Aluminum, Chevy, LS, Each
Part Number: SUM-G2621
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 303/303, Lift .488/.488, Chevy, Small Block, Each
Part Number: SUM-1106
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Pro LS 2618 Forged Piston, 4.030 bore, 1.326 C.H., 2cc Flat, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8
Part Number: SUM-3269434030-2
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Cam and Lifter kit, Pro SBC Retrofit Stage 5 Hyd. Roller LS Firing Order, 242/251 Dur., 110 LSA + 4 Adv, .550/.550 1.5 Ratio, 2600-6600 RPM Range
Part Number: SUM-K1225
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Pistons, Forged Aluminum, Flat, 4.000 in. Bore, 1.304 in. Compression Height, 0.927 in. Pin, Chevy, LS, Set of 8
Part Number: SUM-17407C
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Oil Pan, Steel, Natural, 5 qt., 1-Piece Rear Main Seal, Chevrolet, Small Block, Each
Part Number: SUM-G3503X
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Engine Block, Pro LS, Bare, Cast Iron, 6-bolt Main Bolt Style, 9.240 in. Standard Deck, Chevrolet, Each
Part Number: SUM-150216
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Pro SBC Retrofit Stage 5 Hyd. Roller LS Firing Order Cam, 242/252 Dur., 110 LSA + 4 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 2600-6600 RPM Range
Part Number: SUM-1225
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 274/274, Lift .485/.485, Ford, Small Block, Each
Part Number: SUM-1790
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Cam and Lifters, Mechanical Flat Tappet, Advertised Duration 287/297, Lift .504/.504, Chevy, Small Block, Kit
Part Number: SUM-CT101K
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Timing Chain and Gear Set, Double Roller, Billet Steel, 3-Bolt, Four Position Cam Sensor, Chevy 6.0L, Set
Part Number: SUM-G6616R-B
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, NSR Camshaft, Kit
Part Number: CMB-09-0038
Not Yet Reviewed
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Pro LS 2618 Forged Pistons. 3.810 bore, 1.326 C.H., 2cc dome, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Coated, 4.8L 5.3L Vortec Truck
Part Number: SUM-326945810-2P
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Stage 1 Pro LS Ghost Cam. 222/234 115+3, .600/.575 Lift, Ultimate Stealth Cam, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS3 LS7 LS9 LQ4 LQ9 LM7
Part Number: SUM-8715R1
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Oil Pan, Aluminum, Polished, 5 qt., Chevy, Small Block, 2-Piece Rear Seal, Driver Side Dipstick, Each
Part Number: SUM-121010
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Pistons, Hypereutectic, Flat, 4.040 in. Bore, Chevy, Set of 8
Part Number: SUM-17351C-40
Estimated Ship Date: Monday 5/5/2025
Estimated Ship Date: Monday 5/5/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.