Availability
Pulley Set, Serpentine, 25 Percent Underdrive, Only Fits April 2000-04, Earlier Models use SUM-C2510, Set of 3
Part Number: SUM-C2511
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Camshaft, Hydraulic Flat Tappet, Advertised Duration 278/290, Lift .471/.471, Ford, Big Block, Each
Part Number: SUM-3501
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Combo, Oil Pan, Black Zinc, Pickup, Std-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, 7.4L/454, Kit
Part Number: SUM-PANKIT13
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Power Steering Pulley, Serpentine, 6-Groove, Aluminum, Polished, .664 in. Bore, Chevy, GM Type 2, Each
Part Number: SUM-340203
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Valve Covers, Tall, Fabricated Aluminum, Clear Anodized, Chevy, Big Block, Pair
Part Number: SUM-440610
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Rocker Arms, Gold Series, Full Roller, 1.5 Ratio, Aluminum, Gold Anodized, Chevy, Small Block, Set of 16
Part Number: SUM-G6811G
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Piston Rings, Pro GPX Gas Ported, 4.065 in. Bore, File Fit, Gas Nitrided, 1.2mm, 1.2mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP406512
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Cylinder Head Stud, Chromoly, Extreme Duty, 12-Point Nuts, Chevy, 6.6L/400, Diesel, LB-7, LLY, Kit
Part Number: SUM-910521
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Timing Cover, 1-Piece, Steel, Chrome Plated, Chevy, Small Block, Each
Part Number: SUM-G3200
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Valve Covers, Stock Height, Steel, Chrome, Plain, Chrysler Pre-Magnum, Small Block, Pair
Part Number: SUM-G3330
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Piston Rings, Pro GPX Gas Ported, 4.040 in. Bore, File Fit, Gas Nitrided, 1.5mm, 1.5mm, 3.0mm Thickness, V8, Set
Part Number: SUM-GP404015
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 400 Standard Clearance, 3/4 Upper and Lower groove, set
Part Number: SUM-1038HS
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Cam and Lifter kit, Pro SBC Stage 6 Hyd. Flat-Tappet 4/7 Firing Order Swap, 242/248 Dur., 108 LSA + 2 Adv, .510/.518 1.5 Ratio, 2600-6600 Range
Part Number: SUM-K1205
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 272/272, Lift .454/.454, Chrysler, Small Block
Part Number: SUM-K50052
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Piston Rings, Ductile Plasma Iron Top, Ductile second, Std. Tension oil, File Fit for 4.280 in. bore 1.5mm, 1.5mm, 3.0mm, Set
Part Number: SUM-1362M851035
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Pro SBF Best Hydraulic Roller Cam 2, 212/220 Duration, 112.5 LSA + 0 Adv. .550/.550 lift 1.6 ratio, .587/.587 1.7 ratio, 2,300-6,000 basic rpm, 85-96
Part Number: SUM-8905
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Oil Pump, Standard-Volume, Standard Pressure, Chevy, Small Block, Each
Part Number: SUM-121155SV
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Muscle Car Camshaft, 300HP350, Hydraulic Flat Tappet, 1,500-4,000 RPM Range, Adv.Duration 258 int./269 exh., Lift 194 int./202 exh., Chevy, Each
Part Number: SUM-1120
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Pro LS 2618 Forged Piston, 4.070 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.2 LS3 L92 LS9, Set of 8
Part Number: SUM-326943407012
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Engine Block, Ford 302 Cast Iron , 4-Bolt Mains, 4.000 in. Bore, 1-Piece Rear Main Seal, Small Block, Each
Part Number: SUM-150206
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Pulley Spacer, Crankshaft, 4-bolt, Aluminum, Natural, 0.950 in. Thickness, Ford, Each
Part Number: SUM-329707
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Piston Rings, Cast Iron, 4.060 in. Bore, 5/64 in., 5/64 in., 3/16 in. Thickness, 8-Cylinder, Set
Part Number: SUM-133-139-60
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Pro LS 2618 Forged Piston, 3.780 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-1109273780-5
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Timing Chain and Gear Set, Double Roller, Billet, 3 Bolt, 4 Cam Sensors, Adjustable, Chevrolet, LS, Set
Part Number: SUM-G6648-BA
Not Yet Reviewed
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Piston Rings, Plasma Moly Steel Top, Martensitic Ductile Napier Second, Std. Tension Oil, File Fit for 3.820 in. Bore, 1.5mm, 1.5mm, 3.0mm, Set
Part Number: SUM-136SM8531045
Estimated Ship Date: Monday 12/22/2025
Estimated Ship Date: Monday 12/22/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.