Availability
Headlight/Turn Signal Assemblies, 02-05 Ram 1500, 03-05 2500/3500, Black, LED HL Bulbs Installed, Turn Sig Bulbs Included, UV Coated, Kit
Part Number: SUM-RP24710
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Automatic Transmission Rebuild Kit, Heavy-Duty, Dodge, 46RE, 47RE, 48RE, Kit
Part Number: SUM-705048
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Flexplate, 164-Tooth, Internal Engine Balance, SFI 29.1, Ford, Modular, Each
Part Number: SUM-G114SFI
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Bellhousing Spacer, Chevrolet, Gen 3/4 LS Engines, Automatic Trans., .375 in. Thick, Aluminum, Each
Part Number: SUM-704008
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Transmission Filter, Direct Fit, Black Fiber, Includes Spin On Filter, Dodge, Jeep, Kit
Part Number: SUM-G19012F
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Pro LS 2618 Forged Piston, 4.000 bore, 1.326 C.H., 12cc Dish, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-326943400012
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Headlight Assembly RH 03-07 Accord 05-07 Accord Hybrid HO2503120 Each
Part Number: SUM-HD393-B001R
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Ignition Coil, Coil Pack, Epoxy, Black, 28,000 V, Chrysler, Dodge, Jeep, Each
Part Number: SUM-850587
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Carpet, Passenger Area, 1999-2003, Ford F-150, Super Cab, 4 Door, Ext Cab, Blk, Cutpile, Each
Part Number: SUM-461160-BLK
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Heat Protection, Spark Plug Boot Heat Shields, Heat Resistant Polyimide Film Insert, Straight, Aluminum, Red, 2 3/8 in. Long, LS/LT, Set of 8
Part Number: SUM-889505R
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Wheel, Venom, Aluminum, Gloss Black, Machined, 17 in. x 8 in., 5 x 4.75 in./120.65mm Bolt Circle, 5.50 in. Backspace, Each
Part Number: SUM-149B-786125
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Summit Precision Cam Bearings, Chevy LS first design 1997-03
Part Number: SUM-1000S00
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Cam and Lifter kit, Stage 1 Pro LS Truck Swap Cam, High-Lift version, 209/217 112 + 1 .550/.550 Lift, 3-bolt, 4.8-6.2L, LQ4 LQ9 LY6 LS1 LS2 LS6 , Each
Part Number: SUM-K8719R1
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Pistons, Forged, Flat, 4.030 in. Bore, Chevy, Set of 8
Part Number: SUM-17365FC-30
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 288/296, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8710-1DS
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
SUM-8728 Pro LS Big Truck Torkinator Level 2 Cam Kit, Beehive Springs, Seals, 212/218 Dur., 110 + 3, .600/.585 Lift, 3 Bolt, 4.8, 5.3, 6.0, 6.2 Vortec
Part Number: SUM-8728-2-BHV
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Pro LS Rotating Assembly, 330 Cid., 3.810 bore, Standard 3.622 stroke, 24X, 6.125 rod, 7cc dish, 9.8:1 @ 61cc, 9.4:1 @ 65cc, File-Fit Rings, H Bearing
Part Number: SUM-R2436L8107
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Wheel, Venom, Aluminum, Gloss Black, Machined, 17 in. x 10 in., 5 x 4.75 in./120.65mm Bolt Circle, 7.50 in. Backspace, Each
Part Number: SUM-149B-716151
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Header Flanges, Steel, 3/8 in. Thick, 2.000 in. Diameter D-Port, Mopar Hemi Gen III, Pair
Part Number: SUM-270209
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Pro LS 4340 Piston and Rod Kit, 365 Cid., 4.005 bore, 3.622 stroke, 6.125 rod, 12cc Dish, 9.6:1 @ 65cc, 9.2:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR36L00512
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Differential Carrier, Positraction, Nodular Iron, GM 7.5/7.6 in., 28 Spline, 3.23 Up Ratio, Each
Part Number: SUM-730960
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Seat Foam , Replacement 03-06 Chevy / GMC Suv/Truck , Bucket Seat , Lower Seat Bun , RH Side, Each
Part Number: SUM-RP20046-RH
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Duramax Crank And Cam Key, Set
Part Number: SUM-161002
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, G3 Hemi .010 undersize (thicker), set
Part Number: SUM-1808H25
Not Yet Reviewed
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Wheel, Venom, Aluminum, Gloss Black, Polished Lip, Machined Accents, 15 in. x 8 in., 5 x 4.50 in./114.3mm Bolt Circle, 5.50 in. Backspace, Each
Part Number: SUM-149P-586527
Estimated Ship Date: Friday 1/2/2026
Estimated Ship Date: Friday 1/2/2026
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.