Availability
Camshaft, Hydraulic Flat Tappet, Advertised Duration 274/274, Lift .485/.485, Ford, Small Block, Each
Part Number: SUM-1790
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Crankshaft, 1-Piece Seal, External Balance, Cast Steel, 3.750 in. Stroke, Chevy, 350 main, 383 stroker, Each
Part Number: SUM-180368
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 2618 Forged Piston, 4.030 bore, 1.326 C.H., 2cc Flat, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8
Part Number: SUM-3269434030-2
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Engine block coolant and oil plug kit, Threaded Engine Block Oil/Coolant passage Plugs, Brass/Steel, Oil Plug and barbell, Chevy, GM LS GenIII/IV, Kit
Part Number: SUM-G1584
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Stage 4 Pro LS Truck Swap Cam, 226/230 112+4, .550 /.550 Lift, 3-bolt, Chevy, LS, Each
Part Number: SUM-8714R1
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Oil Pan, Steel, Black Painted, 5 qt., Front Sump, Ford, Small Block, Each
Part Number: SUM-G3520B
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 2cc dome, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943780-2F
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8720-1
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 2618 Forged Piston, 4.000 bore, 1.110 C.H., 8cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Cathedral/Rect., 6.0 LY6 LQ4 LQ9, Set of 8
Part Number: SUM-1109274000-8
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Harmonic Balancer, Damper, Internal Balance, Medium Spacing, Steel, Clearcoated, Chevy, Pontiac, 5.7, 6.0L, Each
Part Number: SUM-C2500
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS Piston and Rod Kit, 325 Cid., 3.780 bore, Standard 3.622 stroke, 6.125 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR36L7807
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, With Coil Mounts, Black Powdercoat, Pair
Part Number: SUM-440821
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Stage 1 Pro LS Ghost Cam. 222/234 115+3, .600/.575 Lift, Ultimate Stealth Cam, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS3 LS7 LS9 LQ4 LQ9 LM7
Part Number: SUM-8715R1
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Summit Factory Performance Stage 2 LS Cam, 227/239 108 L/S, .551/.551 Lift, Vortec LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Summit's version of Factory Stage 2
Part Number: SUM-8704
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Adapter, Oil Filter, Non-Bypass, Billet Aluminum, Black, 13/16-16 in. Thread, Each
Part Number: SUM-G4982
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS Rotating Assembly, 325 Cid., 3.780 bore, Standard 3.622 stroke, 24X, 6.125 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings, H Bearing
Part Number: SUM-R2436L7807
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 4340 Forged Steel Crank, 3.622 Stroke, 58X Reluctor, Lightened Rod Journals and Gun-drilled Mains, Std. 6-bolt Flange, Internal balanced, LS3
Part Number: SUM-180LS362258X
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 2cc dome, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Coated, 4.8L 5.3L Vortec Truck
Part Number: SUM-326945780-2P
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Timing Cover, Cast Aluminum, 1-Piece, With Seal, Cover Gasket and Cam Sensor Cover Plate, Natural, Chevy LS1, LS2, LS3, LS6, Each
Part Number: SUM-G6319
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8722R1
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Engine Oil Dipstick, LS Cast Retro Pan, Billet Aluminum Handle, Black, Steel Tube with Braided Dipstick, Chevy GM, LS/LSX, Gen III/IV., Each
Part Number: SUM-122240
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Chevy SB, 195 cc Intake Runner, 65cc Straight-Plug Chamber, 2.02 Intake Valve, 1.6 Exhaust Valve, Hydraulic Roller Cam Max .600 Lift, Ea.
Part Number: SUM-162SBCSTRHR
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Summit Factory Performance Stage 3 LS Single Plane Cam, 236/246 110 +0 .612/.612 Lift, LS1 LS2 LS6 LS3 LQ9, Summit's version of Factory LSX 454 cam
Part Number: SUM-8702
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Cam and Lifter kit, Pro SBC Retrofit Stage 3 Hyd. Roller LS Firing Order, 224/232 Dur., 110 LSA + 2 Adv, .550/.540 1.5 Ratio, 2000-6300 RPM Range
Part Number: SUM-K1223
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Forged Pro Mopar SB 4340 Forged Steel I-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-MOP61238I
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.