Availability
Brian Tooley Racing Camshafts, Intake Manifolds, Pushrods & More
Camshaft, Truck Norris, 21X int./22X exh. Duration, 0.540 in./0.540 in. Lift, 111 LSA, 1-Bolt, 5.3L, Gen V LT, Each
Part Number: BTC-BTR-GENV53TN
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR GEN V STAGE 3 SUPERCHARGED CAMSHAFT
Part Number: BTC-S0414
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.900 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7900312-16
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 8.125 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR8125375-16
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, BTR, LS7 Stage 4 V2, 246 int./260 exh. Duration, 0.662 in./0.662 in. Lift, 111 LSA, 3-Bolt, 7.0L, Each
Part Number: BTC-BTRLS7STAGE4
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Ring Compressor, Solid, Aluminum, Black Anodized, 4.080 in. Diameter, Each
Part Number: BTC-BTRRC4080
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Rear Main Cover Gasket, Chevrolet, Small Block LS, Each
Part Number: BTC-BTR39249
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Cover Gaskets, Rubber, Avanti, Buick, Cadillac, Chevy, GMC, Hummer, Isuzu, Pontiac, Saab, Workhorse, Workhorse Custom Chassis, Pair
Part Number: BTC-BTR-37683-2
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.225 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7225312-16
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 7.875 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7875375-16
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 7.575 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7575375-16
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, LS Truck Hoss Stroker, 219 int. Duration, 0.620 in./0.636 in. Lift, 112 LSA, 3-Bolt. Chevy, Gen III/IV LS, Each
Part Number: BTC-LSTRUCKHOSS
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.775 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7775312-16
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Ring Compressor, Solid, Aluminum, Black Anodized, 4.075 in. Diameter, Each
Part Number: BTC-BTRRC4075
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR GEN V L83 HEAD GASKETS SOLD IN PAIRS
Part Number: BTC-BTR-22325-2
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.725 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7725312-16
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft
Part Number: BTC-BTR-HOTROD
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, BTR, Truck Norris Cam, 212 int. Duration, 0.587 in./0.586 in. Lift, 109.5 LSA, 1-Bolt, 5.7L, Hemi Gen III, Each
Part Number: BTC-S0425
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Throttle Body Gasket, Paper, 102mm Size, Chevrolet, Small Block LS, Small Block Gen V, Each
Part Number: BTC-102TBGSKT
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, V2, Stage 4, Hydraulic Roller, 233/24X Duration at 0.050 in., 0.636 in. Lift, 111 LSA, 3-Bolt, Chevy, LS, Each
Part Number: BTC-BTRLS1STAGE4
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 7.725 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7725375-16
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR LS 400+ BIG TURBO CAMSHAFT
Part Number: BTC-BTR-LSBT400
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR LS 400+ MEDIUM TURBO CAMSHAFT
Part Number: BTC-BTR-LSMT400
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Spring Kit, Platinum, Dual, Standard, Steel Retainer, 0.045 in. Thick, 377 lbs./in., Factory Valve Guides, Kit
Part Number: BTC-SK001S0545BB
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
BTR 6.4 HEMI VALVE SPRING KIT
Part Number: BTC-SK024
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster