Availability
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 0.060 in. Thick, 409 lbs./in. Spring Rate, Factory Valve Guides, Kit
Part Number: BTC-SK702-0560BB
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Intake Manifold, Fuel Injected, Stock/OEM Standard Deck, Multi-Port, 6,000-8,000 RPM Range, 102mm Bore, Square Port, Chevy, Small Block LS, Each
Part Number: BTC-IMA-03-BLK
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Rocker Arm Hold-Down Bolt, 12-point Head, M8 x 1.25 Thread, 1.771 in. Underhead Length, Chevrolet, Small Block LS, Set of 16
Part Number: BTC-TKBOLTS0216
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, Hydraulic Roller, Street/Strip/Towing Use, L83 Stage 3, 215/233 Duration, 0.540 in./0.540 in. Lift, Chevrolet, 5.3L/6.2L Gen V, Each
Part Number: BTC-2241533104R0
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.275 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7275312-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshafts, BTR, PDS Stage 4 V2, 229 int. Duration, 0.636 int./0.636 exh. Lift, 116.5 LSA, 3-Bolt, Chevy, LSA, LS9, 6.2L, Each
Part Number: BTC-BTRPDSSTAGE4
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Camshaft, BTR, Centrifugal Supercharged Stage 2, 217 int. Duration, 0.619 in./0.617 in. Lift, 113, 3-Bolt, 4.8L, 5.3L, 6.0L, 6.2L, Gen III/IV LS, Each
Part Number: BTC-S0397
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.625 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7625312-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
BTR DIE CAST VALVE COVER SET BLACK NO LOGO WITH COIL MOUNTS
Part Number: BTC-VCA03BLKCM
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Head Gaskets, Multi-Layer, Steel, 4.10 in. Bore, 0.051 in. Compressed Thickness, Chevy, Gen V, LT Engines, Pair
Part Number: BTC-BTR-88943-2
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 3/8 in. Diameter, 8.100 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR8100375-16
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 11/32 in. Diameter, 7.400 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7400343-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, BTR, L83 Stage 1, 203 int., 210 exh Duration, 0.540 in./0.540 in. Lift, 112 Lobe Sep, 1-Bolt, 5.3L, 6.2L, Gen V LS, 14% Fuel Lobe, Each
Part Number: BTC-2240310125R0
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Camshaft, V2, Stage 4, Hydraulic Roller, 233/24X Duration at 0.050 in., 0.636 in. Lift, 111 LSA, 3-Bolt, Chevy, LS, Each
Part Number: BTC-BTRLS1STAGE4
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Variable Cam Timing Solenoids, Gen V LT, VVT Cam Timing Bolt/Solenoid, Steel, Natural Finish, Chevy, 6.2L, Each
Part Number: BTC-BTR-81018
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 11/32 in. Diameter, 7.850 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7850343-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Intake Manifold, Trinity. Aluminum, Natural, Fuel Injection, GM, Fits LS3/L76/L92/L99 Heads, Each
Part Number: BTC-TRA3P105V2
Not Yet Reviewed
Estimated Ship Date: Oct 27, 2025 if ordered today
Estimated Ship Date: Oct 27, 2025 if ordered today
BTR GEN V STAGE 2 SUPERCHARGED CAMSHAFT
Part Number: BTC-S0413
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Pushrods, Assembled, One-Piece, 5/16 in. Diameter, 7.875 in. Length, 0.080 in. Wall Thickness, Chromoly, Heat Treated, Ball Tip, Set of 16
Part Number: BTC-PR7875312-16
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
BTR LS 400+ MEDIUM TURBO CAMSHAFT
Part Number: BTC-BTR-LSMT400
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Rocker Arm. Intake, Offset, Chevy LS3, L99, Steel, Each
Part Number: BTC-RKRLS17IR1
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
LIFTERS
Part Number: BTC-X17120735-16
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Exhaust Gaskets, Header, Multilayer Steel, Round Port, Chevrolet, LS, Each
Part Number: BTC-BTR17944
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, LS Truck Hoss Stroker, 219 int. Duration, 0.620 in./0.636 in. Lift, 112 LSA, 3-Bolt. Chevy, Gen III/IV LS, Each
Part Number: BTC-LSTRUCKHOSS
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Camshaft, BTR, PDS Stage 2, 221 int. Duration, 0.619 in./0.617 in. Lift, 113, 3-Bolt, 4.8L, 5.3L, 6.0L, 6.2L, Gen III/IV LS, Each
Part Number: BTC-S0395
Not Yet Reviewed
Estimated Ship Date: Monday 10/20/2025
Estimated Ship Date: Monday 10/20/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.