Availability
523 Results Found For "1488cc"
Brake Hose, Individual, Assembled, Stock, Each
Part Number: SUG-2202099
Not Yet Reviewed
Estimated Ship Date: May 4, 2026 if ordered today
Estimated Ship Date: May 4, 2026 if ordered today
O-Ring Seal, Fuel Injector, Rubber, Kit
Part Number: BCK-158-0022
Estimated Ship Date: May 4, 2026 if ordered today
Estimated Ship Date: May 4, 2026 if ordered today
Fuel Pump Strainer, Each
Part Number: DFP-FS0063
Not Yet Reviewed
Estimated Ship Date: May 6, 2026 if ordered today
Estimated Ship Date: May 6, 2026 if ordered today
WHEEL NUT M12-1.25, Set of 10
Part Number: RNB-611-241
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Battery, Mega-Tron Plus, 12 V, Starting, 800 Cold Cranking Amps, Top and Side Posts, Each
Part Number: ISB-MTP-78DT
In Store Purchase Only
Battery, Mega-Tron II, 12 V, Starting, 550 Cold Cranking Amps, Top Posts, Each
Part Number: ISB-MT-35
In Store Purchase Only
Belt, Elite, V-Belt, 17/32 in. Width, 31.50 in. Length, Each
Part Number: CEL-17315
Not Yet Reviewed
Estimated Ship Date: May 8, 2026 if ordered today
Estimated Ship Date: May 8, 2026 if ordered today
Spark Plug Wire Sets, Assembled, Solid Core, Black Boots, Blue Wires, 8.00mm Diameter, for Nissan, Mazda, L4, Set
Part Number: GRN-24-1107S
Not Yet Reviewed
Estimated Ship Date: May 14, 2026 if ordered today
Estimated Ship Date: May 14, 2026 if ordered today
Catalytic Converter, Stainless Steel, 2 in. Inlet/Outlet, 17.5 in. Length, Each
Part Number: CTO-4377
Not Yet Reviewed
Estimated Ship Date: May 8, 2026 if ordered today
Estimated Ship Date: May 8, 2026 if ordered today
Spark Plug Wire Sets, MPG Plus, Assembled, Solid Core, Black Boots, Green Wires, 8.00mm Diameter, for Nissan, L4, Set
Part Number: GRN-34-1098MPG
Not Yet Reviewed
Estimated Ship Date: May 14, 2026 if ordered today
Estimated Ship Date: May 14, 2026 if ordered today
EGR Valve, Replacement, for Nissan, Each
Part Number: SMP-EGV484
Not Yet Reviewed
Estimated Ship Date: May 6, 2026 if ordered today
Estimated Ship Date: May 6, 2026 if ordered today
Shock Absorber / Strut, Excel-G, Twin-Tube, Gas Charged, Each
Part Number: KYB-232004
Not Yet Reviewed
Estimated Ship Date: May 6, 2026 if ordered today
Estimated Ship Date: May 6, 2026 if ordered today
MOLDED RADIATOR HOSE (SAE 20R4)
Part Number: CEL-66804
Not Yet Reviewed
Estimated Ship Date: May 8, 2026 if ordered today
Estimated Ship Date: May 8, 2026 if ordered today
Belt, Elite, V-Belt, 17/32 in. Width, 38.50 in. Length, Each
Part Number: CEL-17386
Not Yet Reviewed
Estimated Ship Date: May 7, 2026 if ordered today
Estimated Ship Date: May 7, 2026 if ordered today
Gasket, EGR Valve, Steel Core Laminate, Each
Part Number: BCK-039-1012
Not Yet Reviewed
Estimated Ship Date: May 4, 2026 if ordered today
Estimated Ship Date: May 4, 2026 if ordered today
Spark Plug Wire Sets, Ignition Wire Sets, Assembled, Spiral Core, Male/HEI, 7.00mm Diameter, for Nissan, Austin, Austin Healey, Chevy, Volvo, L4, Set
Part Number: DNP-671-4001
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Wheel Bearing, Tapered, Universal, Each
Part Number: NTL-30206
Not Yet Reviewed
Estimated Ship Date: May 11, 2026 if ordered today
Estimated Ship Date: May 11, 2026 if ordered today
Timing Belt, Positive Drive, 0.750 in. Wide, 39.75 in. Long, 106 Teeth, for Nissan, Each
Part Number: CEL-40077
Not Yet Reviewed
Estimated Ship Date: May 8, 2026 if ordered today
Estimated Ship Date: May 8, 2026 if ordered today
Fuel Pump, Electric, 4 psi, Alfa Romeo, AMC, BMW, Buick, Chevy, Dodge, Ferrari, Ford, Toyota, Volkswagen, Kit
Part Number: ADO-EP42S
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Oil Pump, Standard Volume, Standard Replacement, Includes Gasket, Nissan, 1.2/1.3/1.4/1.5L, L4, Each
Part Number: MEL-M-90A
Not Yet Reviewed
Estimated Ship Date: May 18, 2026 if ordered today
Estimated Ship Date: May 18, 2026 if ordered today
Expansion Plugs, Steel, Diameter 1.199 in., Various, Each
Part Number: RNB-555-100
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Sending Unit, Oil Pressure, for use on Acura®, Honda®, Chevy, Geo, Isuzu, Mazda, Nissan, Each
Part Number: BCK-201-0262
Not Yet Reviewed
Estimated Ship Date: May 4, 2026 if ordered today
Estimated Ship Date: May 4, 2026 if ordered today
Brake Master Cylinder, 0.813 in. Bore, Dual Bowl Design, Aluminum, Natural, Nissan, Each
Part Number: DHB-M96889
Estimated Ship Date: May 5, 2026 if ordered today
Estimated Ship Date: May 5, 2026 if ordered today
Rack and Pinion Bellows, Neoprene, Black, for Nissan, MG, Renault, Rover, Pair
Part Number: BCK-103-2232
Estimated Ship Date: May 4, 2026 if ordered today
Estimated Ship Date: May 4, 2026 if ordered today
Wheel Bearings, Steel, 1.574 in. Bore Diameter, for Nissan, Chevrolet, Dodge, Ford, Isuzu, Mazda, Mitsubishi, Each
Part Number: BCK-051-3079
Not Yet Reviewed
Estimated Ship Date: Tomorrow
Estimated Ship Date: Tomorrow
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster