- Your search has been changed to "12.990"
Availability
219 Results Found For "12.990"
Showing In Stock Items. Show All 239 Items.
Nuts and Fittings, Weld-In Bungs, Universal Bung Type, Flanged, M12 x 1.5 Female Threads, Aluminum, Each
Part Number: SFL-SF990M12D
Not Yet Reviewed
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Fuel Pumps, Drop-In Fuel Module, Electric, In-Tank, 255 lph, 12V, Sending Unit, Wire Harness, for 36 Gallon Tank, Ford, Trucks, 3.7-6.2L, Each
Part Number: HLY-12-990
Not Yet Reviewed
Estimated Ship Date: Apr 20, 2026 if ordered today
Estimated Ship Date: Apr 20, 2026 if ordered today
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Front, Kit
Part Number: PWR-K2069
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K2046
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Truck and Tow, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 13.780 in./12.990 in. Diameter, Z36 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7136-36
Not Yet Reviewed
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in./12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7413
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7412
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 13.780 in./12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7136
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Autospecialty, Solid Surface, Iron, Natural, 12.800 in./12.990 in. Diameter, Z17 Ceramic Pads, Kit
Part Number: PWR-KOE2073
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Truck and Tow, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.800 in./12.990 in. Diameter, Z36 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K2072-36
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in./12.600 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7415
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Truck and Tow, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z36 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7412-36
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K2041
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.600 in./12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7576
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K2047
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7414
Not Yet Reviewed
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7727
Not Yet Reviewed
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Truck and Tow, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z36 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K5519-36
Not Yet Reviewed
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K5979
Not Yet Reviewed
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 13.780 in./12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K6537
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Truck and Tow, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z36 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K7414-36
Not Yet Reviewed
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Evolution Sport, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z23 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K5678
Not Yet Reviewed
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Street Warrior, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 13.580 in./12.990 in. Diameter, Z26 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K6143-26
Not Yet Reviewed
Estimated Ship Date: Apr 6, 2026 if ordered today
Estimated Ship Date: Apr 6, 2026 if ordered today
Pads and Rotors, Street Warrior, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z26 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K5312-26
Not Yet Reviewed
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Estimated Ship Date: Monday 4/6/2026 if shipped by air
Pads and Rotors, Street Warrior, Cross-Drilled/Slotted Surface, Iron, Zinc Plated, 12.990 in. Diameter, Z26 Carbon Fiber Ceramic Pads, Kit
Part Number: PWR-K3022-26
Not Yet Reviewed
Estimated Ship Date: Apr 21, 2026 if ordered today
Estimated Ship Date: Apr 21, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster