Availability
2014 Parts and Accessories
Rocker Arm Trunnion Upgrade Kit, Trunnion Upgrade, Chevy, LS, Set of 16
Part Number: SME-143002
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Covers, Aluminum LS, Centerbolt, Tall, Plain, Cast Aluminum, Black Powdercoat, Textured, Chevy, LS, 4.8-7.0L, Pair
Part Number: HLY-241-112
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Lug Nuts, Conical Seat, Bulge, Steel, Black Chrome, 14mm x 1.50 RH, Set of 4
Part Number: MCG-64074
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Starter, High Torque, Mini, 4.41:1 Gear Reduction, Chevy, LS, V8, Each
Part Number: PRO-67054
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Radiator, Performance, Aluminum, Polished, Crossflow, XD Extruded Core, 2 Row, Jeep. Each
Part Number: RAD-MOJ995XD
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Intake Manifolds, EFI, LS Mid-Rise, Cathedral Port Head, Multi-port, 92mm Bore, Standard Deck, Aluminum, Satin Finish, Chevy, 4.8-6.0L, Each
Part Number: HLY-300-126
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Torque Converter, Holeshot, 2,300-2,500 rpm Stall Range, Chevy, 4L60E, 4L65E, with LS Engine, Each
Part Number: BMM-70441
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, BTR, L83 Stage 2, 212 int., 223 exh Duration, 0.540 in./0.540 in. Lift, 111 Lobe Sep, 1-Bolt, 5.3L, 6.2L, Gen V LS, 14% Fuel Lobe, Each
Part Number: BTC-2241023116R1
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock/Strut, 4600 Series, Monotube, Gas Charged, Chevy, GMC, Front, Each
Part Number: BSN-24-196437
Estimated Ship Date: Feb 23, 2026 if ordered today
Estimated Ship Date: Feb 23, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Lug Nuts, Conical Seat, 1/2 in. x 20 RH, Closed End, Chrome Plated Steel, Set of 4
Part Number: MCG-64000
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Catalytic Converter, Direct-Fit, Stock Flange, Two Inlets, One Outlet, Stainless Steel, Ceramic Honeycomb, Ford, Superduty, 6.2L, Each
Part Number: MPE-52297
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Muffler, Delta Flow 50 Series, 2 1/2 in. Inlet/2 1/2 in. Outlet, Stainless Steel, Black, Each
Part Number: FLO-842553
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock, Nitro Drop 2, Twin Tube, Front, Chevy, GMC, RWD, Each
Part Number: BEL-8000
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Exhaust Manifold, Passenger Side, High Silicon Ductile Iron, Natural, Dodge, Ram, 6.7L Diesel, Each
Part Number: BDD-1045965
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Dipstick Tube, Engine, Steel, Black, Chevy, Small Block, LS3, Each
Part Number: NAL-12625031
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .523/.524, Chevy GM, LS/LSX, Gen III/IV, LS, Kit
Part Number: SUM-8701-1
Estimated Ship Date: Mar 25, 2026 if ordered today
Estimated Ship Date: Mar 25, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Summit Racing™ Pro LS Vortec Truck Swap Camshafts SUM-8701R1
Estimated Ship Date: Monday 2/2/2026
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 2cc dome, Std. Stroke, .945 pin Press or Float, NA/Boost/Nitrous, Coated, 4.8L 5.3L Vortec Truck
Part Number: SUM-326945780-2P
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Axle Shaft, Semi-Floating, Dana 44, Rear, Steel. 31.890 in. Length, Jeep, Each
Part Number: SDH-2004449-1
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Timing Chain, Replacement, Single Roller, Steel, Chevy, Small Block LS, Each
Part Number: NAL-12646387
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, Hydraulic Roller Tappet, Duration at .050 in. 204/211, Lift .551/.522, Chevy, Each
Part Number: NAL-12623063
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shock, 5100 Series, Monotube, Chevy, GMC, Rear, Each
Part Number: BSN-33-238319
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Front Runner Engine Drive System, Pulley kit, Serpentine, Standard ratio, Aluminum, Black, 6-groove, kit
Part Number: VTA-174020
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Step Bars, Stainless Steel, Polished, Round, 3 in. Diameter, Extended Cab, Chevy, GMC, Pair
Part Number: SUM-710102-SS
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, Hydraulic Roller, Street/Towing Use, L86 DOD Delete, 200/206 Duration, 0.549 in./0.522 in. Lift, Chevrolet, 5.3L/6.2L Gen V, Each
Part Number: BTC-2240006175
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Headers, Long Tube, Steel, Titanium Ceramic, Chrysler, Dodge, Pair
Part Number: BBK-4046
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster