Availability
2014 Summit Racing Parts and Accessories
Motor Mount, Fabricated, GMT-900, LS Truck, Heavy Duty,Performance, Safety Upgrade, Urethane/Steel, Black powdercoat, Pair
Part Number: SUM-7731112-R1
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Intake Manifold, Fuel Injected, Low Profile, 102mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226125S-G2
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pro LS Truck Torkinator. 200/205 Dur., 113+4, .550/.550 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, 7.0 Vortec, L59 LR4 LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8727R1
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Turbocharger, Stock Replacement 3.5 Ecoboost 2013-16 Ford Left Hand, Each
Part Number: SUM-OETF131635LH
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Piston Wrist Pins, H-13 Tool Steel, 0.927 in. Diameter, 2.250 in. Length, 0.215 in. Wall Thickness, 135 grams, Set of 8
Part Number: SUM-S719-8
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Stage 4 Pro LS Cam, Extra Valve Clearance Version, 234/248 113.5 +3.5 .625/.605 Lift, Great Power, 3-bolt, 4.8-7.0L , Vortec LS1 LS2 LS6 LS7 LQ9 LS9
Part Number: SUM-8711R1
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, Excellent power and torque, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-8710R1
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Summit Factory Performance Stage 1 LS Circle Track Cam, 225/236 110+1, .525/.525 Lift, Vortec LS1 LS2 LS6 LS3 LQ4, Summit's version of the ASA Cam
Part Number: SUM-8700
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Exhaust Manifolds, Iron, Black Ceramic, Chevy, LS Series Engines, 2.250 in. Outlet, Pair
Part Number: SUM-G9080B
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8722R1
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Turbocharger, Stock Replacement 3.5 Ecoboost 2013-2016 Ford Right Hand, Each
Part Number: SUM-OETF131635RH
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Intake Manifold, Fuel Injected, Low Profile, 102mm Bore Size, Aluminum, Black, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226125B-G2
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Intake Manifold, Fuel Injected, Tall Profile, 92mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226122S-G2
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Summit Factory Performance Stage 3 LS Single Plane Cam, 236/246 110 +0 .612/.612 Lift, LS1 LS2 LS6 LS3 LQ9, Summit's version of Factory LSX 454 cam
Part Number: SUM-8702
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Transmission Adapter Kit, Bellhousing Adapter, Throwout bearing spacer, Pilot bearing, Chevy LS, Aisin AR5, Kit
Part Number: SUM-LSTOAR5
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Exhaust Manifolds, High Silicon Ductile Iron, Silver Ceramic Coated, Chevy, LS Series Engines, Pair
Part Number: SUM-G9084S
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, With Coil Mounts, Black Powdercoat, Pair
Part Number: SUM-440821
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Intake Manifold, Fuel Injected, Tall Profile, 102mm Bore Size, Aluminum, Black, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226120B-G2
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Flexplate, 152-Tooth, Billet Steel, Internal Balance, SFI 29.3, Dodge, 6.7L Cummins, Each
Part Number: SUM-G142SFI
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Flexplate, 168-Tooth, Billet Steel, Internal Balance, GM LS Series, 6 Bolt Crank, SFI 29.2, Each
Part Number: SUM-G127SFI
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Summit Factory Performance Stage 2 LS Cam, 227/239 108 L/S, .551/.551 Lift, Vortec LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Summit's version of Factory Stage 2
Part Number: SUM-8704
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Intake Manifold, Fuel Injected, Tall Profile, 102mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226120S-G2
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8723R1
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Combo, LS Fuel Filter and Pump Kits, Fuel Filter/Regulator, -6 AN, Black Nylon Braided Hose, Kit
Part Number: CMB-03-0261
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Exhaust Manifolds, Iron, Black Ceramic, Chevy, LS Series Engines, 2.250 in. Outlet with 3.00 in. V-Band Clamps, Pair
Part Number: SUM-G9080V-B
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster