Availability
Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, NSR Camshaft, Stage 1, Kit
Part Number: CMB-09-0039
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, Stage 2, Kit
Part Number: CMB-09-0037
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, 09-21 5.7 Dodge RAM, replaces 53022314AD, VVT but no MDS, 252/271 Advertised Duration, 0.539/0.493 Lift, Dodge, Ram, Each
Part Number: SUM-5701
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Deactivation Delete Combo, Gen III Hemi MDS Delete kit With VVT, Stage 1, Kit
Part Number: CMB-09-0036
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, NSR Camshaft, Kit
Part Number: CMB-09-0038
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Gen. 3 Hemi Cylinder head, 5.7 or 6.1L, 185cc as-cast intake runner,69cc CNC combustion chamber, 2.050 Int./1.590 exh.,600 Lift, 2.42 CSA Dr. Side,
Part Number: SUM-HEMI1855761D
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, NSR Camshaft, Stage 1, Kit
Part Number: CMB-09-0040
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Gen. 3 Hemi Cylinder head, 5.7 or 6.1L, 185cc as-cast intake runner,69cc CNC combustion chamber, 2.050 Int./1.590 exh.,600 Lift, 2.42 CSA Pass.side,
Part Number: SUM-HEMI1855761P
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
5.7 Pro Hemi Truck 2 Hydraulic Roller Cam, 212/218 Duration @.050, 111.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 1800-6200 Range, Each
Part Number: SUM-5722
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro Hemi 224 Long-runner Cam, MDS Delete, Phaser Limited or Delete, 224/228 Duration @.050, 115 LSA + 1 adv, .600/.585 Lift, 3100-6,600 Range, Each
Part Number: SUM-5714
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Filter, Canister, 22mm x 1.5 Thread, 3.350 in. High, common on 2007+ LS, Each
Part Number: SUM-127001
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
5.7 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5723
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
5.7 Pro Hemi Truck 1 Hydraulic Roller Cam, 206/212 Duration @.050, 110.5 LSA + 3.5 adv, .539/.539 Lift No Springs Required, 1600-6000 Range, Each
Part Number: SUM-5721
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Head Studs, Extreme Duty, 12-Point, Chromoly, Black Oxide, 5.9 Cummins 24 valve, Kit
Part Number: SUM-910512
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro Hemi Turbo 4 Cam, MDS Delete, Phaser Limited or Delete, 232/238 Duration @.050, 117.5 LSA + 1.5 adv, .625/.625 Lift, 3600-7500 Range, Each
Part Number: SUM-5734
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro Hemi 218 Short-runner Cam, MDS and VVT Delete, 218/238 Duration, 112 LSA + 4 Adv. .625/.625 lift, 3,300-6,500 basic rpm range, 2009+ 5.7 6.2 6.4
Part Number: SUM-5750
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
6.4 Pro Hemi Truck 3 Hydraulic Roller Cam, 218/224 Duration @.050, 112.5 LSA + 3.5 adv, .585/.540 Lift No Springs Required, 2200-6400 Range, Each
Part Number: SUM-5727
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro Hemi 206 Cam, MDS Delete, Phaser Limited or Delete, 206/212 Duration @.050, 112.5 LSA + 1.5 adv, .600/.585 Lift, 1800-6000 Range, Each
Part Number: SUM-5711
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, G3 Hemi Standard Clearance, set
Part Number: SUM-1808HS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi .001 Extra Clearance, 1/2 Upper groove, set
Part Number: SUM-2221HXS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Combo, Engine Oil Change Kit, 5W30 6 Qts., Kit
Part Number: CMB-08-0098
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Oil Filter, Canister, 22mm x 1.5 Thread, 3.740 in. High, Each
Part Number: SUM-127005
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Gen. 3 Hemi CNC Cylinder head, 6.2/6.4L, 212cc Int. runner, 73cc CNC combustion chamber, 2.125 Int./1.650 exh..600 Lift, 2.88 CSA,Pass..side,
Part Number: SUM-HEMI2126264P
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro Hemi 218 Long-runner Cam, MDS Delete, Phaser Limited or Delete, 218/224 Duration @.050, 114.5 LSA + 1.5 adv, 600/.585 Lift, 2900-6400 Range, Each
Part Number: SUM-5713
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, 2009+ 5.7, 6.2 and 6.4 G3 Hemi .001 undersize (thicker) 1/2 Upper groove, set
Part Number: SUM-2221H025
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster