Availability
2014 Summit Racing Parts and Accessories
Fuel Rails. Billet Aluminum, Black Anodized, Chevy GM, LS/LSX, Gen III/IV, Pair
Part Number: SUM-227148
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Headlight Assembly RH 08-14 SEQUOIA 07-8 TUNDRA 09-13 WO/AUTO LVL TO2503171 Each
Part Number: SUM-TY973-B001R
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Headlight Assembly LH 08-14 SEQUOIA 07-8 TUNDRA 09-13 WO/AUTO LVL TO2502171 Each
Part Number: SUM-TY973-B001L
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Headlight/Turn Signal Assemblies, 07-14, Chr, LED HL Bulbs Installed, Includes Turn Signal/Day Tm Bulbs and Connectors, Deluxe Coated UV lenses, Kit
Part Number: SUM-RP24707
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Step Bars, Oval, Stainless Steel, Polished, 4 in. Diameter, Crew Cab, Dodge, Pair
Part Number: SUM-710252-SS
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Fuel Injection, MAX EFI LS 750 KIT (LS1), Tall Profile, 92mm Throttle Body, Black, Kit
Part Number: SUM-240511-T92B
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Headlight Assembly RH 07-14 Yukon/Xl W/Denali Platinum, Each GM2503318
Part Number: SUM-GM455-B001R
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Pro LS S.P.3 Cam, 238/255 Duration, 110 LSA + 5 Adv,.625/.605 lift, 3-Bolt, compatible with SUM-174005 springs. Gen. 3/4 5.3 5.7 6.0 6.2 7.0
Part Number: SUM-8742R1
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .001 undersize (thicker), Standard 120 Deg. Oil groove, set
Part Number: SUM-7299H001
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft Kit, Pro LS Single Plane, Hydraulic Roller Tappet, Advertised Duration 289/300, Lift .525/.525, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8700-2-BHV
Cannot be shipped Internationally if ordered today
Cannot be shipped Internationally if ordered today
Intake Manifold, Fuel Injected, 92mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226127
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Motor Mount, Lower, Complete Mount Style, Billet Aluminum Bracket, 75A Durometer Polyurethane Bushing, Ford, Mazda, Each
Part Number: SUM-773120
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Oil Cooler Block-Off Plate, Billet Aluminum, Clear Anodized, Chevy, LS, Each
Part Number: SUM-121025
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Exhaust Manifold Gasket, MLS 4 layer 316 Stainless Steel, Left Hand, Gen 1 3.5L EcoBoost Engines, Each
Part Number: SUM-110446
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, Doweled, .837 width, .001 undersize (thicker), set
Part Number: SUM-663HD001
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 280/292, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8708-2-DLTI
Not Yet Reviewed
Cannot be shipped Internationally
Cannot be shipped Internationally
Cylinder Deactivation Delete Combo, Gen III Hemi, MDS Delete Kit With VVT, NSR Camshaft, Stage 1, Kit
Part Number: CMB-09-0040
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Tail Lamp Assembly LH 14-15 TUNDRA TO2800193 Each
Part Number: SUM-TY1242-B000L
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Differential Carrier, Positraction, Nodular Iron, Chrysler 9.25 in. ZF, 31 Spline, Rear, Each
Part Number: SUM-730971
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Tail Lamp Assembly LH 02-15 Titan NI2800161 Each
Part Number: SUM-DS576-B000L
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Gen. 3 Hemi Cylinder head, 5.7 or 6.1L, 185cc as-cast intake runner,69cc CNC combustion chamber, 2.050 Int./1.590 exh.,600 Lift, 2.42 CSA Pass.side,
Part Number: SUM-HEMI1855761P
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 283/297, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8711-1DT
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Headlight Assembly LH 07-14 Yukon/Xl W/Denali Platinum, Each GM2502318
Part Number: SUM-GM455-B001L
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-326S434005-2
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Engine Rotating Kits, Pro LS Crank and Rod Kits, Forged 4340 Steel, 6.098 in. Connecting Rod Length, 3.622 in. Stroke, Chevy, 5.3L, 6.0L, 6.2L, Kit
Part Number: SUM-CR3658098
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster