Availability
2013 CHEVROLET Engines & Components
Engine block coolant and oil plug kit, Threaded Engine Block Oil/Coolant passage Plugs, Brass/Steel, Oil Plug and barbell, Chevy, GM LS GenIII/IV, Kit
Part Number: SUM-G1584
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Filter, Performance Gold, Canister, 5.88 in. Tall, 3.69 in. Diameter, 13/16 in.-16 Thread, Bypass Relief, 11-17 psi, Anti-Drainback, Spin-On, Each
Part Number: KNN-HP-3003
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Lifters, Hydraulic Roller, 0.842 in. O.D., Chevy, LS7, Set of 16
Part Number: XPF-ZZ-Z7LFT-16
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS Piston and Rod Kit, 365 Cid., 4.005 bore, 3.622 stroke, 6.125 rod, 2cc Flat Top, 10.8:1 @ 65cc, 10.2:1 @ 70cc, File-Fit Rings
Part Number: SUM-PR36L0052
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.810 bore, 1.299 C.H., 2cc dome, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273810-2
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Stage 3 Pro LS Truck Swap Cam, 222/232 112+5, .550/.550 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2L Each
Part Number: SUM-K8713R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cylinder Head, Bare, 68cc Combustion Chamber, 276cc Intake Runner, 92cc Exhaust Runner, Aluminum, Chevy, LS, Each
Part Number: FLK-LS3-500
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rod Bearings, Tri-metal, Copper Lead Nickel, .001 in. Extra Oil Clearance, Large Journal, Chevy, Small Block, Set of 8
Part Number: KGB-CR807XPNSTDX
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS Piston and Rod Kit, 325 Cid., 3.780 bore, Standard 3.622 stroke, 6.125 rod, 7cc dish, 9.7:1 @ 61cc, 9.3:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR36L7807
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Alternator Bracket, Upper/Lower Bracket, Billet Aluminum, Natural, Cylinder Head Mount, Driver Side High Mount, Chevy, LS, Kit
Part Number: ICB-551777
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Piston Rings, Plasma-moly, 4.000 in. Bore, 1.2mm, 1.5mm, 2.5mm Thickness, 8-Cylinder, Set
Part Number: HSN-2M5170
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.810 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273810-7
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Pump, Standard Volume, Chevrolet, 4.8/5.3/5.7/6.0/6.2L, Each
Part Number: NAL-12710303
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Balancer Bolt, Chromoly, Black Oxide, Chevrolet, Each
Part Number: ARP-234-2504
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Cover, Cast Aluminum, 1-Piece, With Seal, Cover Gasket and Cam Sensor Cover Plate, Natural, Chevy LS1, LS2, LS3, LS6, Each
Part Number: SUM-G6319
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rod Bearings, Race Series, CT-1 Coated, Tri-Metal, Chevrolet, Small Block, LS, Set of 8
Part Number: PEB-8B663HC-STD
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, Excellent power and torque, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-8710R1
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, BTR, 400+ Street Strip, 236 int., 0.636 in./0.636 in. Lift, 114 LSA, 3-Bolt, Gen III/IV LS, Each
Part Number: BTC-S0400
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Harmonic Balancer, Internal Balance, Steel, Gold Zinc Chromate, Chevy, LS3/L99, Each
Part Number: FLU-760111
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Hydraulic Roller Tappet, Rattler, Advertised Duration 275/282, Lift .525/.525, Chevy, Small Block LS, Each
Part Number: HRS-198035-09
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pulleys, Chevy LS Series, Serpentine, Performance Ratio, Billet Aluminum, Black, Water Pump, Alternator, With Power Steering and Air Conditioning, Kit
Part Number: MCH-20095-08
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arm Trunnion Upgrade Kit, Upgrade, GM, Gen. 3/4 LS Cathedral or Rectangle Port Rockers, Set of 16
Part Number: CCA-13702-KIT
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft, Hydraulic Roller, OE Roller, Supercharged Use, 226 Intake Duration, 0.636 in./0.636 in. Lift, Chevrolet, 6.2L LS, Each
Part Number: BTC-S0402
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Rocker Arm Mounting Stand, Pedestal, Billet Aluminum, Chevy, LS3, Pair
Part Number: SUM-01-7005
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 261/269, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8719-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster