Availability
2013 CHEVROLET Summit Racing Parts and Accessories
Air Conditioner Brackets, A/C Compressor Brackets, R4, Aluminum, Black, GM, LS, Kit
Part Number: SUM-340820-AC1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
SUM-8722 Level 1 Cam Kit with Dual Springs Steel Retainers Locks and Seals, Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt
Part Number: SUM-8722-1-DLSTL
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Cooler Block-Off Plate, Billet Aluminum, Clear Anodized, 1/8 in. NPT Port, Chevy, LS, Each
Part Number: SUM-121026
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.780 bore, 1.110 C.H., 5cc dish, 4.000in. Stroke, 6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-1109273780-5
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Camshaft Installation Handle, Hex Design, Super Deluxe Model, Chevy, Fits All LS/LT Gen 3/4/5 and V8/90 Degree V6, Each
Part Number: SUM-900133
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Lifter, Hydraulic Roller, Chevy, Set of 16
Part Number: SUM-HT21616
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Cover, 2-Piece, Cast Aluminum, Black Powdercoated, Without Cam Sensor, Chevy, LS, V8, Each
Part Number: SUM-G6322
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Chain and Gear Set, Adjustable, Billet Steel, Single Roller, 3-Bolt, 4X, -0.010 in. Line Hone, LS, Kit
Part Number: SUM-G6647-4X-010
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Wiring Harness, LS Coil Harness Extension. 24.00 in. In Length, for Remote Mounted Coils, LS1, LS2, LS3, LS6, LS7, LS9, LSA, Each
Part Number: SUM-890128
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Harmonic Balancer Bolt, Gen. 3 and 4 LS engines only. Hex Head, Chevy, 4.8, 5.3, 5.7, 6.0, 6.2L Each
Part Number: SUM-910262
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pushrod Checker, Stainless Steel, 8.1. Max Length, 7.250 in, Min, Length, Ball Tip, Chevy LS Raised Runner Heads Only, 7/64 sets screw, Each
Part Number: SUM-PLCLSRR
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Standard Clearance, set
Part Number: SUM-663HCS
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Pro LS Timing Cover Installation Tool, Crankshaft Seal Position, Simulates Oil Pan Flange, Chevy, Gen III-IV LS, Each
Part Number: SUM-900334
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Tonneau Cover, Soft Folding, Vinyl, Black, Above the Bed Rails, 8 Ft, Bed, Chevy, GMC, Each
Part Number: SUM-484918
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Fill Cap, Twist-In, Billet Aluminum, Black Anodized, -10 AN, LS, Gen-V, Coyote, Each
Part Number: SUM-380193
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Pro LS Big Truck Torkinator High Lift. 212/218 Dur., 110+3, .600/.585 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, Each
Part Number: SUM-K8728R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Car Covers, 5 Layer, Polypropylene/Spunlace, Gray, Chevy, Each
Part Number: SUM-111304
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Intake Manifold, Fuel Injected, Tall Profile, 92mm Bore Size, Aluminum, Satin, Chevy, LS3, L92, Each
Part Number: SUM-226123S-G2
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Valve Covers, Tall Height, Cast Aluminum, Red Powdercoated, Plain, Chevy, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0L, Pair
Part Number: SUM-440363
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Intake Manifold, Fuel Injected, Tall Profile, 92mm Bore Size, Aluminum, Satin, Chevy, LS1, LS2, LS6, Each
Part Number: SUM-226122L
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Intake Manifold, Fuel Injected, Tall Profile, 102mm Bore Size, Aluminum, Black, Chevy, LS3, L92, Each
Part Number: SUM-226124BL
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Oil Cooler Bypass Block-Off Plate, Billet Aluminum, Clear Anodized, With Dual 90* 16mmx1.5 Ports, Chevy, LS, Each
Part Number: SUM-121030
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Cam and Lifter kit, Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Each
Part Number: SUM-K8722R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Timing Cover, 2-Piece, Cast Aluminum, Polished, With Cam Sensor Provision, Chevy, LS, V8, Each
Part Number: SUM-G6323P
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Crankshaft Holding Tool, Crank Holder, Steel, LS Series Engines, Chevy, GMC, Each
Part Number: SUM-900179
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Estimated Ship Date: Monday 3/2/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster