Availability
2013 Summit Racing Parts and Accessories
Summit Racing™ LED Light Bar Mounting Brackets for 2007-2017 WRANGLER, 2018 WRANGLER JK - SUM-890290
Summit Racing™ LED Light Bar Mounting Brackets for 2007-2017 WRANGLER, 2018 WRANGLER JK - SUM-890290
Mounting Brackets, Steel, Black Powdercoated, Jeep, JK, Pair
Part Number: SUM-890290
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Header Flanges, Steel, 3/8 in. Thick, 1.875 in. Diameter D-Port, Mopar Hemi Gen III, Pair
Part Number: SUM-270205
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Lift Support, Tailgate, Gas Charged, Dodge, Ram, Each
Part Number: SUM-484977
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Shocks and Struts, Loaded Strut Assemblies, Stock Ride Height, Twin-tube, Gas-charged, Black Boot, Front, Chrysler, Dodge, Volkswagen, Each
Part Number: SUM-SA11970
Estimated Ship Date: Mar 25, 2026 if ordered today
Estimated Ship Date: Mar 25, 2026 if ordered today
Rocker Arm Replacement Parts, Snap Ring, Retainer, Chevy, Pair
Part Number: SUM-141560-3
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Replacement Engine Valley Cover O-Ring Gaskets, Viton, Orange, Use with SUM-240059B, Each
Part Number: SUM-240059B-OG
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Strut, Loaded, Twin Tube, Front, Driver Side, Mini Cooper, Each
Part Number: SUM-SA11957
Not Yet Reviewed
Estimated Ship Date: Mar 24, 2026 if ordered today
Estimated Ship Date: Mar 24, 2026 if ordered today
Strut, Loaded, Twin Tube, Front, Passenger Side, Mini Cooper, Each
Part Number: SUM-SA11958
Not Yet Reviewed
Estimated Ship Date: Mar 24, 2026 if ordered today
Estimated Ship Date: Mar 24, 2026 if ordered today
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .010 undersize (thicker), Standard 120 Deg. Oil groove, set
Part Number: SUM-7299H010
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Valvetrain Upgrade, Chevy, 4.8, 5.3, 5.7, 6.0L, Kit
Part Number: SME-K-14300
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Camshaft, Duramax Pro 2 Cam, 187/189 Duration @.050 in., 106.5 LSA, +2 advanced, Intake .389/Exhaust .392 Lift, Revised Firing Order, Each
Part Number: SUM-9002R1
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Strut, Loaded, Twin-tube, Black Boot, Each
Part Number: SUM-SA15560
Not Yet Reviewed
Estimated Ship Date: Mar 25, 2026 if ordered today
Estimated Ship Date: Mar 25, 2026 if ordered today
Intake Manifold, Fuel Injected, 102mm Bore Size, Aluminum, Black, Chevy, LS3, L92, Each
Part Number: SUM-226124B
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Intake Manifold, Fuel Injected, 102mm Bore Size, Aluminum, Black, Chevy, LS3, L92, Each
Part Number: SUM-226129B
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Rocker Arm, Moly Coated, Ductile Iron, Roller Fulcrum Type, 1.7 Ratio, Narrow Style, Chevy, LS, Each
Part Number: SME-14301M
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Side Window Visors, Shatterproof Polycarbonate, Dark Smoke, Chevy, GMC, Pickup, Set of 4
Part Number: SUM-470516
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Alternator, External Regulator, 235 Amp, Natural Finish, Jeep Wrangler JK, Each
Part Number: SUM-810323
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Doweled, .001 Extra Clearance, set
Part Number: SUM-663HXDS
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Fuel Tank Cap, Plastic, Black, Ford, Lincoln, Mazda, Mercury, Each
Part Number: SUM-290416
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Headlight Assembly LH 05-15 XTEREARA EXC 09-15 S AND X MODELS NI2502161 Each
Part Number: SUM-DS596-B001L
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Phaser Unlocker LS, Pressurizes and floats Phaser for piston to valve clearance checks
Part Number: SUM-PHASULLS
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Headlight Assembly RH 12-14 Cruze 2Nd Dsgn W/Clear Ring Corn Lamp, Each GM2503361
Part Number: SUM-GM584-B111R
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-110S273780-5
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-110S27407021
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-326S45400012
Not Yet Reviewed
Estimated Ship Date: Monday 2/2/2026
Estimated Ship Date: Monday 2/2/2026
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster