Selected Filters


Loading...

Availability


Stainless Works Performance Headers

4.52 out of 5 stars 31 Customer Reviews

Gain powerful sound, better performance, and improved mileage with a set of Stainless Works performance headers. Constructed from high-quality 304L stainless steel, the headers are CNC mandrel-bent and have durable 3/8 in. thick flanges. They're available to fit the factory connection point, or attach to a custom Stainless Works cat-back exhaust. Order the style you prefer and the model designed for your year/make and engine application.

Results 1 - 7 of 7

Headers, Stainless Power Series, Long Tube, Catalytic Converter, 304 Stainless Steel, Natural, 1 7/8 in. Primary, 3/8 in. Flange, Mopar, Gen III, Pair

Part Number: STW-SHM64HDRCAT

5.0 out of 5 stars ( 8 )

Estimated Ship Date: Monday 3/23/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 3/23/2026 if shipped by air

2007-14 CHEVY TAHOE AND YUKON LT HEADERS WITH 1 3/4" PRIMARY TUBES WITH 2.5 " COLLECTORS INCLUDING CLAMPS, O2

Part Number: STW-CTTHCAT

Not Yet Reviewed

Estimated Ship Date: May 21, 2026 if ordered today

...Loading

Estimated Ship Date: May 21, 2026 if ordered today

Chevy Silverado / GMC Sierra 2007-13 Headers 304SS Performance Connect

Part Number: STW-CT07HCAT

Not Yet Reviewed

Estimated Ship Date: May 27, 2026 if ordered today

...Loading

Estimated Ship Date: May 27, 2026 if ordered today

2011-14 Ford F-150 5.0L 2WD/ 4WD Screw/ Scab Truck Headers. Constructed entirely of 304L stainless steel

Part Number: STW-FT11HCATY

Not Yet Reviewed

Estimated Ship Date: May 21, 2026 if ordered today

...Loading

Estimated Ship Date: May 21, 2026 if ordered today

Header, Long Tube, Stainless Steel, 2 in. Tubes, 3 in. Collectors, Chevy, 6.2L, Each

Part Number: STW-CA11H3CAT

Not Yet Reviewed

Estimated Ship Date: May 21, 2026 if ordered today

...Loading

Estimated Ship Date: May 21, 2026 if ordered today

Chevy Silverado / GMC Sierra 2007-13 Headers 304SS Factory Connect

Part Number: STW-CT07HCATY

Not Yet Reviewed

Estimated Ship Date: May 22, 2026 if ordered today

...Loading

Estimated Ship Date: May 22, 2026 if ordered today

2007-14 Shelby GT500 1 7/8" headers and lead pipes. Tig welded 304 s/s headers with 3/8" thick flanges and smo

Part Number: STW-GT145HCATHP

Not Yet Reviewed

Estimated Ship Date: May 22, 2026 if ordered today

...Loading

Estimated Ship Date: May 22, 2026 if ordered today

  • 1
  • Page 1 of 1