Summit Racing SpeedCard - learn how to get 10% back up to $100

Summit Racing SpeedCard - learn how to get 10% back up to $100

Save Now on Select Lighting Products!

2012 RAM 2500 Summit Racing Parts and Accessories

Individual Parts

Results 1 - 6 of 6

Camshaft, 09-21 5.7 Dodge RAM, replaces 53022314AD, VVT but no MDS, 252/271 Advertised Duration, 0.539/0.493 Lift, Dodge, Ram, Each

Part Number: SUM-5701

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 10/27/2025

...Loading

Estimated Ship Date: Monday 10/27/2025

Ignition Coil Packs, Coil-On-Plug, Epoxy Coil, Black, Chrysler, Dodge, Ram, Hemi, Modular, Set of 8

Part Number: SUM-850588

4.17 out of 5 stars ( 6 )

Estimated Ship Date: Monday 10/27/2025

...Loading

Estimated Ship Date: Monday 10/27/2025

Flexplate, 152-Tooth, Steel, Internal Balance, SFI 29.3, Dodge, 6.7L Cummins, Each

Part Number: SUM-G142SFI

2.5 out of 5 stars ( 4 )

Estimated Ship Date: Monday 10/27/2025

...Loading

Estimated Ship Date: Monday 10/27/2025

Tonneau Cover, Soft Folding, Vinyl, Black, Above the Bed Rails, 6 1/4 Ft. Bed, Dodge, Ram, Each

Part Number: SUM-484904

3.67 out of 5 stars ( 3 )

Estimated Ship Date: Monday 10/27/2025

...Loading

Estimated Ship Date: Monday 10/27/2025

Fuel Injector, Diesel, Dodge, 6.7L, Cummins, ETJ, Each

Part Number: SUM-240077

Not Yet Reviewed

Estimated Ship Date: Monday 10/27/2025

...Loading

Estimated Ship Date: Monday 10/27/2025

Radiator, Aluminum/Plastic, Crossflow, Black, Dodge, 6.7L, Diesel, Each

Part Number: SUM-380404

Not Yet Reviewed

Estimated Ship Date: Monday 10/27/2025

...Loading

Estimated Ship Date: Monday 10/27/2025

  • 1
  • Page 1 of 1

Modal Header

Call To Order

This is a custom order part. You can order this part by Contacting Us.