Availability
Pro LS Truck Torkinator. 200/205 Dur., 113+4, .550/.550 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, 7.0 Vortec, L59 LR4 LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8727R1
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Summit Factory Performance Stage 2 LS Cam, 227/239 108 L/S, .551/.551 Lift, Vortec LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Summit's version of Factory Stage 2
Part Number: SUM-8704
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Super Damper, Internal Balance, Aluminum, Black, Chevy, LS with 1.483 in. Snout, Each
Part Number: ATI-917776
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Alternator Bracket, Upper/Lower Bracket, Billet Aluminum, Natural, Cylinder Head Mount, Passenger Side Top Mount, Chevy, LS, Kit
Part Number: ICB-551750-1
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, V2 Series, Hydraulic Roller, Retro-fit, Street/Strip Use, LS1 Stage 3 V2, 227 Intake Duration, 0.636 in./0.636 in. Lift, Chevrolet, LS, Each
Part Number: BTC-BTRLS1STAGE3
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Internal Balance, Steel, Black, Chevy, Small Block, Each
Part Number: FLU-740121
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
LS3 Rocker Arm Shafts, Chevy, LS, Kit
Part Number: BTC-BTRSRKR3KIT
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Crankshaft, GM Genuine Part, 3.622 in. Stroke, Nodular Iron, Internal Balance, One-piece Rear Main Seal, Buick, Chevy, GMC, Hummer, 5.3L LS, Each
Part Number: ADO-12588614
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Super Damper, Internal Balance, Aluminum/Steel, Chevy, GMC, LS, Each
Part Number: ATI-918629
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, BTR, Stage 2 Truck V2, 212 int./218 exh. Duration, 0.553 in./0.553 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR31218110
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, V2 Series, Hydraulic Roller, Turbocharged Use, Stage 3 Turbo, 224 Intake Duration, 0.618 in./0.618 in. Lift, Chevy, 4.8/5.3/6.0/6.2L, Each
Part Number: BTC-BTRTURBOSTG3
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Alternator Bracket, Upper/Lower Bracket, Billet Aluminum, Natural, Cylinder Head Mount, Passenger Side Mount, Chevy, LS, Kit
Part Number: ICB-551780-3
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, BTR, Stage 3 Truck V2, 218 int./224 exh. Duration, 0.553 in./0.553 in. Lift, 110 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-BTR31824100
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancer, Underdrive, Internal Balance, Aluminum/Steel, Black, Chevy, 5.7L, Each
Part Number: ATI-917278
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, BTR Stage 2 Turbo V2, Hydraulic Roller, 220 int./223 exh. Duration, 0.618 in./0.618 in. Lift, 113 LSA, 3-Bolt, Chevy, GMC, Each
Part Number: BTC-BTRTURBOSTG2
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, With Coil Mounts, Black Powdercoat, Pair
Part Number: SUM-440821
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Valve Springs, RPM Series, Dual, 1.324 in. O.D., 500 lbs./in. Rate, 1.000 in. Coil Bind Height, Set of 16
Part Number: RSC-PAC-1209X-16
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Harmonic Balancers, LS Engine, Internal Balance, Steel, Black, 7.50 in. OD, 1.48 in. ID, with Mid-Mount Accessory Drive Only, GM, 5.7-6.2L, Each
Part Number: HLY-97-205
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Rocker Arms, Pedestal Mount, Full Roller, Aluminum, 1.7 Ratio, Chevy, LS, Set of 16
Part Number: SUM-G6980
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Pistons, Hypereutectic, Dish, 3.780 in. Bore, Chevy, GMC, Set of 8
Part Number: SLP-H856CP
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Camshaft, Hydraulic Roller Tappet, Advertised Duration 281/297, Lift .617/.624, Chevy, Small Block, LS, Each
Part Number: CCA-54-469-11
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8723R1
Not Yet Reviewed
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Summit Factory Performance Stage 1 LS Circle Track Cam, 225/236 110+1, .525/.525 Lift, Vortec LS1 LS2 LS6 LS3 LQ4, Summit's version of the ASA Cam
Part Number: SUM-8700
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Timing Chain and Gear Set, Single Roller, 1-bolt, Steel Cam and Crank Gear, Tensioner, Oil Control Valve, Cadillac, Chevrolet, GMC, Hummer, Kit
Part Number: MEL-33SRH60HVVT1
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Oil Pan, Steel, Black Powdercoated, Dart LS Next Gen 3 Skirted Block, Early/Swap F-Body Race Baffled, Spin-On Oil Filter Adapter, Kit
Part Number: MOR-20152
Estimated Ship Date: Monday 9/29/2025
Estimated Ship Date: Monday 9/29/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.