Availability
Pro LS 4340 Forged Steel H-Beam Connecting Rod, 6.125 in. Length, .927 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Stroker Clearanced, LS1, Set of 8
Part Number: SUM-LS6125927
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Pro LS 4340 Forged Steel H-Beam connecting rod, 6.098 in. length, .945 pin, ARP 2000 7/16 12 pt. rod bolts, full floating, stroker clearanced, LS1
Part Number: SUM-LS6098945
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, Maximum Torque for Towing, 205/217 112+2, .500 /.500 Lift, 3-bolt, 4.8, 5.3, 6.0, 6.2
Part Number: SUM-K8718R1
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Chevy LS Cylinder head, 210cc Cathedral port Intake Runner, 64cc Chamber, 2.02 Intake Valve 1.6 Exhaust Valve, 3.898+ bore sizes, Max .660 Lift, Each
Part Number: SUM-162LS210CATH
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifter kit, Stage 2, LS Truck Swap Cam, 218/227 112+2, .522/.524 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, Each
Part Number: SUM-K8701R1
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
LS Cylinder Head, 5.3L Specific, 60cc Chamber, 2.000 Int. Valve, Permanent Mold A-356, Manganese Guides, Ductile Seats, PAC Springs, 21 4N Stainless
Part Number: SUM-LS210CATH60
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Connecting Rods, Performance, I-beam Style, Forged 4340 Steel, 6.098 in. Length Center To Center, Chevrolet, 5.3L, 5.7L, 6.0L, 6.2L LS, Set of 8
Part Number: SUM-LS6098945I
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Exhaust Manifold, Stainless Steel, Natural, Turbo Manifold, T-4 Flange, Gen III/IV LS Series Engines, Passenger Side, Chevy, Each
Part Number: SUM-G9300
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Throttle Body, Drive-By-Wire, Billet Aluminum, Black Anodized, 103mm, Chevy, LS, Each
Part Number: SUM-227110B
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/287, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8720-1
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 288/296, Lift .625/.605, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8709-1DS
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifter kit, Stage 2 Pro LS Cam. 226/238 113+3, .600/.600 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, LS1,2,3,6,7, LSA LQ4 LQ9 LS9 LS4 LY6
Part Number: SUM-K8707R1
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cylinder Deactivation Delete Combo, 6.0/6.2L AFM DOD Delete, Head Bolts, Lifters/Trays, Non PCV Valley Cover, Head Gaskets, Chevy LS, Kit
Part Number: CMB-09-0032
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 275/283, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8706-1DS
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Battery, Red Top, Starting, 800 Cold Cranking Amps, Top and Side Post, BCI Group 12V, Hold Down and Cable Included, Kit
Part Number: CMB-06-0122
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Cam and Lifter kit, Stage 3 Pro LS Cam 232/242 113+3, .600/.600 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Each
Part Number: SUM-K8708R1
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 275/288, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8707-1DS
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Connecting Rods, 4340, H-Beam, 12-Point, 6.275 in. Length, 0.945 in. Pin, ARP2000 Bolts, Chevy GM, LS/LSX, Gen III/IV, Set of 8
Part Number: SUM-LS6275945
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Bellhousing, Steel, Black, SFI 6.1, Chevy, V6-V8, to Muncie/T-10/TKX Manual Transmission, Kit
Part Number: SUM-7001101
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Pro LS 2618 Forged Piston, 4.005 bore, 1.299 C.H., 12cc Dish, Std. Stroke, 6.125 .927 Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9,Set of 8
Part Number: SUM-299927400512
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifter kit, Stage 3 Pro LS Truck Swap Cam, 222/232 112+5, .550/.550 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2L Each
Part Number: SUM-K8713R1
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Differential Carrier, Positraction, Nodular Iron, Dana 44, 3 Series, 30 Spline, Each
Part Number: SUM-730972
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.785 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273785-7
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
SUM-8728 Pro LS Big Truck Torkinator Level 1 Cam Kit, Beehive Springs, 212/218 Dur., 110 + 3, .600/.585 Lift, 3 Bolt, 4.8, 5.3, 6.0, 6.2 Vortec
Part Number: SUM-8728-1-BHV
Not Yet Reviewed
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Cam and Lifter kit, Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Each
Part Number: SUM-K8716R1
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Estimated Ship Date: Monday 4/20/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster