Availability
2004 Engines & Components
Oil Pan, Low Profile Design, Engine Swap, Aluminum, Natural, 4.000 in. Stroke, 5.9 Quarts, Chevy, 4.8, 5.3, 6.0, 6.2L, Each
Part Number: HLY-302-3
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Connecting Rods, FSI I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.125 in. Long, GM LS, Set of 8
Part Number: ESP-FSI6125O
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LY6 LY5
Part Number: SUM-8709R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Lifters, Hydraulic Roller, Chevy, Set of 16
Part Number: CCA-850-16
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 1 Pro LS Truck Swap Cam, High-Lift version, 209/217 112 + 1 .550/.550 Lift, 3-bolt, 4.8-6.2L, LQ4 LQ9 LY6 LS1 LS2 LY6 LS6 LS7 LS9 LH6, Each
Part Number: SUM-8719R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cylinder Head Studs, Extreme Duty, 12-Point Head, Black Oxide, Chevy, 4.8, 5.3, 5.7, 6.0L, 2004-up, Kit
Part Number: SUM-910501
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, LS1 LS2 LS6 LS7 LS9 LS3 LH6 LQ4 LQ9, Each
Part Number: SUM-8712R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Harmonic Balancer, Serpentine, Internal Balance, Aluminum/Steel, Black, SFI 18.1, Chevy, Pontiac, Each
Part Number: ATI-917303
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft, Stage 2, Pro LS Turbo Cam. 226/230 Dur., .600/.575 Lift, 113+4 Lobe Sep. , 5.3, 5.7, 6.0, 6.2, 7.0, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9 LS9, Each
Part Number: SUM-8706R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Rocker Arms, Roller Fulcrum, Shaft Mounting Style, 1.7 Ratio, Steel, Chevrolet, 5.7L, 6.0L, Kit
Part Number: BTC-S0410
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Rocker Arms, Stud Mount, Full Roller, Aluminum, 1.7 Ratio, 7/16 in. Stud, Chevy, Big Block, Set of 16
Part Number: SCC-SCP1014
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Lifters/Trays/Bolts, Hydraulic Roller, Chevy, LS Gen. 3 and 4, Gen. 5 LT, Kit
Part Number: SUM-HTLSKIT3
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 4 Pro LS Cam, Extra Valve Clearance Version, 234/248 113.5 +3.5 .625/.605 Lift, Great Power, 3-bolt, 4.8-7.0L , Vortec LS1 LS2 LS6 LS7 LQ9 LS9
Part Number: SUM-8711R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft, BTR, Stage 2 Truck V2, No Springs Required, 212 int./218 exh. Duration, 0.480 in./0.480 in. Lift, 111 LSA, 3-Bolt, 4.8L, 5.3L, 6.0L, Each
Part Number: BTC-31218110NSR
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Cylinder Head Studs, Pro Series, 12-Point Heads, Ford, 6.0L Diesel, Kit
Part Number: ARP-250-4202
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Stage 3 Pro LS Turbo Cam. 232/234 115.5 + 5.5, .600/.575 Lift, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LS9 LQ4 LQ9 LM7, Each
Part Number: SUM-8716R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Pro LS Big Truck Torkinator High Lift. 212/218 Dur., 110+3, .600/.585 Lift, 3-bolt, 4.8 5.3 5.7 6.0 6.2, Vortec LM7 L33 LS2 L92 L96 LY6 LQ4 LQ9 , Each
Part Number: SUM-8728R1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Replica Block, Steel, Natural, Includes Hardware, Chevy, LS, Each
Part Number: SUM-774001
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, 222/232 Dur.@ .050 112 LSA +5 Adv. Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8713-1
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Piston Wrist Pins, H-13 Tool Steel, 0.927 in. Diameter, 2.250 in. Length, 0.215 in. Wall Thickness, 135 grams, Set of 8
Part Number: SUM-S719-8
Not Yet Reviewed
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Rocker Arms, Pedestal Mount, 1.7 Ratio, Aluminum, Roller Rockers, Chevy, LS, Set
Part Number: CSP-SLS17
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Harmonic Balancer, Race Performance, Cadillac, Chevy, Pontiac, 5.7, 6.0, 6.2L, Each
Part Number: PBB-PB1117SS
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Harmonic Balancer, Internal Balance, Steel, Black, Toyota, 2JZ, 1JZ, Each
Part Number: FLU-840801
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Crankshaft, Remanufactured, Nodular Iron, 3.622 in. Stroke, 0.010 Undersize Bearing Required, 24-Tooth Reluctor, Chevy, LS, Each
Part Number: SUM-180362
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Camshaft, BTR, 400+ Street Strip, 236 int., 0.636 in./0.636 in. Lift, 114 LSA, 3-Bolt, Gen III/IV LS, Each
Part Number: BTC-S0400
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Estimated Ship Date: Monday 3/30/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster