Availability
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 275/283, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8706-1DS
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Rocker Arm, 1.7 Ratio, Roller Fulcrum, Ductile Iron, Chevy GM, LS/LSX, Gen III/IV, No Offset Each
Part Number: SUM-141550
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Rocker Arms, Pedestal Mount, Full Roller, Aluminum, 1.7 Ratio, Chevy, LS, Set of 16
Part Number: SUM-G6980
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 2618 Forged Pistons. 3.810 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273810-7
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Chevy LS 4340 Forged Steel Crankshaft, 4.000 stroke, 24X Reluctor, Lightened, Nitride Hardened, Narrowed Rod Bearings Req.
Part Number: SUM-180LS400024
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Oil Pump and Pickup Assembly, Standard-Volume, High Pressure, Chevy, Small Block, Kit
Part Number: SES-3-60-08-005
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Forged Pro SBC 4340 Forged Steel H-Beam Connecting Rods, 6.000 in. Length, .927 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-SBC60008H
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, Excellent power and torque, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-8710R1
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 2618 Forged Pistons. 3.780 bore, 1.326 C.H., 7cc dish, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943780-7F
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Cam and Lifters, Hydraulic Flat Tappet, Advertised Duration 303/303, Lift .488/.488, Chevy, Small Block, Kit
Part Number: SUM-K1106
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Oil Pump, Nodular Iron, High-Volume, Standard Pressure, Chevy, Small Block, Each
Part Number: SUM-121155N
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Cam and Lifter kit, Pro SBC Stage 3 Hyd. Flat-Tappet 4/7 Firing Order Swap, 218/228 Dur., 109 LSA + 2 Adv, .465/.473 1.5 Ratio, 1500-5800 Range
Part Number: SUM-K1202
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 2618 Forged Pistons. 3.810 bore, 1.326 C.H., 2cc dome, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943810-2F
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Lifters, Hydraulic Roller, Link Bar, 0.903 in. Outside Diameter, 2.685 in. Seat Height, Dodge, Plymouth, Chrysler, Set of 16
Part Number: SUM-HT224-16
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Alternator Bracket, Aluminum, Chrome, Cylinder Head Mount, Short Water Pump, Chevy, Small Block, Kit
Part Number: SUM-420101
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Oil Pan, Aluminum, Polished, 5 qt., 1-Piece Rear Seal, Passenger Dipstick, Thick Front Seal, Chevy, SBC, Each
Part Number: SUM-121012
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Engine Dipstick, Braided Stainless Steel, Tumble Polished, Chevy, Pontiac, LS, Each
Part Number: SUM-122208
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Engine Rebuild, Hypereutectic Dish Top, Plasmamoly Rings, Stock Bore, Bearings, Chevy, LS, Kit
Part Number: CMB-08-0072
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Engine Rebuild Kit, Hypereutectic Flat Top, Plasmamoly Rings, Stock Bore, Bearings, Chevy, LS, Kit
Part Number: CMB-08-0068
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Oil Cooler Bypass Block-Off Plate, Billet Aluminum, Clear Anodized, With Single 90* 1/8 in. NPT Ports, Chevy, LS, Each
Part Number: SUM-121028
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 2618 Forged Piston, 4.005 bore, 1.326 C.H., 2cc Flat, Std. Stroke, Full Float Rod, NA/Boost/Nitrous, Cathedral/Rect. 6.0L LY6 LQ4 LQ9, Set of 8
Part Number: SUM-3269434005-2
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS Rotating Assembly, 370 Cid., 4.030 bore, 3.622 stroke, 58x, 6.125 rod, 2cc Flat Top, 10.9:1 @ 65cc, 10.3:1 @ 70cc, File-Fit Rings, H Bearings
Part Number: SUM-R5836L0302
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Cam and Lifter kit, Stage 4 Pro LS Cam 238/246 113+3, .625/.605 Lift, Maximum power version, 3-bolt 5.3, 5.7, 6.0, 6.2, 7.0, LS1,2,3,6,7,9 LSA LSX
Part Number: SUM-K8709R1
Not Yet Reviewed
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Timing Chain and Gear Set, Double Roller, Billet, 3 Bolt, 1 Cam Sensor, Adjustable, Chevrolet, LS, Set
Part Number: SUM-G6646-BA
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Pro LS 2618 Forged Pistons. 3.810 bore, 1.326 C.H., 7cc dish, Std. Stroke, .Gen.4 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-326943810-7F
Estimated Ship Date: Monday 1/5/2026
Estimated Ship Date: Monday 1/5/2026
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.