Availability
2001 CHEVROLET Summit Racing Parts and Accessories
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, Chevy LS, .010 undersize (thicker), Racing 270 Deg. Oil groove, set
Part Number: SUM-7298HC10
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Main Bolts, 6-Bolt Main, Outer Bolts, With Windage Tray, Chevy, 4.8, 5.3, 5.7, 6.0L, Set of 10
Part Number: SUM-910229-2
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Replacement Piston and Components: If not in stock, order MUST be placed to trigger singles. Average ETA of 3 business days if kits are in stock
Part Number: SUM-326S454000-2
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Turbocharger Oil Lines, Turbo Oil Feed Lines, 16mm to Dual -4AN, Fits SUM-G9302 Twin Turbo LS Manifolds, Kit
Part Number: SUM-G9302-OLK
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Combo, LS Fuel Filter and Pump Kits, In-line Fuel Filter, -6 AN, Braided Stainless Hose, Kit
Part Number: CMB-03-0260
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cam and Lifter kit, Summit Factory Performance Stage 2 LS Cam, 227/239 108 L/S, .551/.551 Lift, LS1 LSX, Summit's version of Factory Stage 2
Part Number: SUM-K8704
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Engine Accessory Brackets, Serpentine, Alternator Bracket, Power Steering Bracket, Idler Bracket, Billet Aluminum, Silver Anodized, LS, Kit
Part Number: SUM-340820-S
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Main Bearings, SBC 350 Main Standard Clearance, Half-Upper groove, set
Part Number: SUM-909HCS
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, Chevy LS, .001 Extra Clearance, Standard 120 Deg. Oil groove, set
Part Number: SUM-7299HXS
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Oil Pan Fasteners, LS Stainless Steel Oil Pan Bolt Sets, Flanged Hex Head, Stainless Steel, Natural, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-910266
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Radiator, Exact Fit, Aluminum, Plastic, Engine Oil Cooler, Chevy, GMC, Olds, Each
Part Number: SUM-380539
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Alternator Bracket, For SUM-G3977, Chrome, Steel, Chevy, Each
Part Number: SUM-G3979
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Combo, Intake Manifold, 750 CFM Carburetor, Air Cleaner, Fuel Line, Gaskets, Bolts, Small Chevy, Vortec, Kit
Part Number: CMB-03-0223
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Oil Cooler Bypass Block-Off Plate, Billet Aluminum, Clear Anodized, With Dual 90* 1/8 in. NPT Ports, Chevy, LS, Each
Part Number: SUM-121027
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Exhaust Manifolds, Iron, Silver Ceramic, Chevy, LS Series Engines, 2.250 in. Outlet with 3.00 in. V-Band Clamps, Pair
Part Number: SUM-G9082V-S
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, .001 Extra Clearance for .010 undersize, set
Part Number: SUM-663H009
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro SBC CT3 Hydraulic Roller Cam 1, LS Firing Order, 244/258 Dur., 109 LSA, +4.5 Adv., .530I/.530E Lift with 1.5, .565I/.565E Lift with 1.6, Retrofit
Part Number: SUM-8817
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
HEAD SWAP KIT 6.0 6.2 04-UP
Part Number: CMB-08-0062
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Heat Protection, Spark Plug Boot Heat Shields, Heat Resistant Polyimide Film Insert, Straight, Aluminum, Black, 2 3/8 in. Long, LS/LT, Set of 8
Part Number: SUM-889505BK
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Valve Covers, Circle Track, Tall, Steel, Natural, Plain, Chevy, Small Block, Pair
Part Number: SUM-G3290
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Lifter Valley Cover, Finned, Aluminum, Black Powdercoated, Chevy, LS, Each
Part Number: SUM-240065-BLK
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Distributor Hold-Down Clamps, Zinc Alloy, Natural Finish, Chevy, Each
Part Number: SUM-400510
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Main Bearings, SBC 350 Main .001 Extra Clearance for .010 undersize, Half-Upper groove, set
Part Number: SUM-909H009
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Spark Plug Wires, Race Series, 8.5mm, Black, 50 Ohm, 12" Leads, OEM Spark Plug Boots With Heat Shields Installed, LS, V8, Set
Part Number: SUM-887830WS
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Crankshaft Socket, 1/2 in., Steel, Chevrolet, LS1/LS6, Each
Part Number: SUM-904914
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster