Availability
2001 CHEVROLET Summit Racing Parts and Accessories
Pro SBC Retrofit Stage 6 Hyd. Roller LS Firing Order Cam, 248/256 Dur., 110 LSA + 2 Adv, .550/.550 1.5 Ratio, .587/.587 1.6 Ratio, 3000-7000 RPM Range
Part Number: SUM-1226
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Intake Manifold, Stage 3, Dual Plane, Aluminum, Natural, Square Bore, Chevy, Small Block, with Vortec Heads
Part Number: SUM-226019
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Lifter Guide, Hydraulic Roller Style, Plastic, Chevy, LS, Non AFM/DOD engines, Each
Part Number: SUM-150132
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Stage 4 Pro LS Twin-Turbo Cam. 240/242 Dur., 116+4, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LS7 LQ4 LQ9, Each
Part Number: SUM-8723R1
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Oil Pan, Aluminum, Polished, 5 qt., 1-Piece Rear Seal, Passenger Dipstick, Thick Front Seal, Chevy, SBC, Each
Part Number: SUM-121012
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Rod Bearings, Direct Replacement, 0.010 in. Crankshaft Undersize, Bi Metal, Chevy, Small Block, Set of 8
Part Number: SUM-171010
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Bellhousing Bolts, Hex Head Flange Type, 10mm x 1.50 Thread, 10.9 Steel, Zinc plated, Chevrolet, LS, 8 piece, Kit
Part Number: SUM-910227
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
DOD Delete Plug Kit, Gen IV/V LS and LT Engines, 8 Piece Set
Part Number: SUM-8779
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS 2618 Forged Pistons. 3.785 bore, 1.299 C.H., 7cc dish, Std. Stroke, .6.125 Rod, NA/Boost/Nitrous, Coated, 4.8L 5.3L LS Vortec Truck, Set of 8
Part Number: SUM-2999273785-7
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cam and Lifter kit, Pro SBC Stage 3 Hyd. Flat-Tappet 4/7 Firing Order Swap, 218/228 Dur., 109 LSA + 2 Adv, .465/.473 1.5 Ratio, 1500-5800 Range
Part Number: SUM-K1202
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Rocker Arm Studs, 3/8-24 in. Thread, 1.74 in. Effective Stud Length, Chevy, Small Block, Set of 8
Part Number: SUM-G1675
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Clutch Kit, Street-Strip Performance, 1-1/8 in. Shaft, 26-Spline, 12 in. Organic/Ceramic Disc, GM, Kit
Part Number: SUM-700936
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cam and Lifter kit, Pro SBC Retrofit Stage 4 Hyd. Roller LS Firing Order, 232/242 Dur., 110 LSA + 3 Adv, .550/.550 1.5 Ratio, 2200-6400 RPM Range
Part Number: SUM-K1224
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Brake Proportioning Valve, Fixed, Dual Inlet, 3 Outlets, Black, 4-Wheel Disc Brakes, Each
Part Number: SUM-760185-B
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS 2618 Forged Piston, 3.898 bore, 1.299 C.H., 3cc mini dome, Std. Stroke, 6.125 Full-float Rod, NA/Boost/Nitrous, Coated, 5.7L LS1 LS6, Set of 8
Part Number: SUM-2999273898-3
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS 4340 Rotating Assembly, 346 Cid., 3.898 bore, 3.622 stroke, 24X, 6.125 rod, 3cc dome, 11:1 @ 65cc, 10.6:1 @ 68cc, File-Fit Rings, H Bearings
Part Number: SUM-R2436L8983
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Standard Clearance, set
Part Number: SUM-663HS
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Combo, Differential, Eaton Truetrac, Ring and Pinion, 4.10:1 Ratio, Install Kit, 30 Spline, Rear, GM 8.5 in./8.6, Kit
Part Number: CMB-14-0082
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 261/269, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8719-1
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, 210/218 112 +1, .500/.500 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, Each
Part Number: SUM-K8712R1
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Main Cap Removal Tool, Steel/Aluminum, Black, GM Gen III-IV LS & Gen V LT, Each
Part Number: SUM-900339
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS Rotating Assembly, 325 Cid, 3.780 bore, Standard 3.622 stroke, 24X, 6.098 rod, 2cc dome,10.9:1 @ 61cc, 10.3:1 @ 65cc, File-Fit Rings, H Bearing
Part Number: SUM-R24367802
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Alternator Bracket, Aluminum, Chrome, Cylinder Head Mount, Short Water Pump, Chevy, Small Block, Kit
Part Number: SUM-420101
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Pro LS Timing Cover Installation Tool, Crankshaft Seal Position, Gen III-IV LS, Each
Part Number: SUM-900337
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Forged Pro Small Block Chevy 4340 Forged Steel I-Beam Connecting Rod, 6 in. Length, .927 Floating Pin, 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-180SBC6000I
Not Yet Reviewed
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Estimated Ship Date: Monday 4/27/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster