Availability
2000 Parts and Accessories
Flexplate, 168-Tooth, External Engine Balance, 1-Piece Rear Main Seal, SFI 29.1, Chevy, V6/V8, Each
Part Number: SUM-G104SFI
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Combo, Differential, Eaton Truetrac, Ring and Pinion, 3.73:1 Ratio, Install Kit, 30 Spline, Rear, GM 8.5 in./8.6, Kit
Part Number: CMB-14-0080
Not Yet Reviewed
Estimated Ship Date: Mar 12, 2026 if ordered today
Estimated Ship Date: Mar 12, 2026 if ordered today
Brake Calipers, GM D52 Dual Piston, Aluminum, Red Powdercoated, Semi-metallic Pads, Front, Kit
Part Number: WIL-140-11291-R
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Timing Chain and Gear Set, True Roller, Single Roller, Billet Steel Sprockets, 3-Bolt, 1X Cam, Chevy, LS1, LS2, Set
Part Number: SUM-G6640
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cam and Lifter kit, Pro SBC Hyd. Roller Hot Cam Plus, 218/227 Dur., 112 LSA + 1, .525/.520 1.5 Ratio,1800-6300 RPM Range, '87-02 Gen 1 Roller Block
Part Number: SUM-K8802
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Fuel Injection System, Pro-Flo 4, Self-Learning, Sequential Multi-Port, Satin, 550 HP Max, Small Block Ford, Kit
Part Number: EDL-35940
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Spark Plug Wires, Super Conductor, Spiral, 8.5mm, Red, Multi-Angle Boots, Chevy, LS1, Set
Part Number: MSD-32819
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Lowering Springs, Rear, Black, 3 in. Drop, Chevy, GMC, Pickup, SUV, Each
Part Number: SUM-708205
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cylinder Head, PowerPort® 365, CNC Comp Port, Assy, 119cc CNC, 2.35" Int, 1.645" Spr, Ti Ret, Big Chevy, Each
Part Number: TFS-4141T804-C02
Estimated Ship Date: Jun 4, 2026 if ordered today
Estimated Ship Date: Jun 4, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
Summit Racing™ Precision Cast BBC Cylinder Head SUM-162BBCREC335
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026
Oil Filter, Canister, 13/16 in.-16 Thread, Each
Part Number: WIX-51061R
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Fuel Pumps, Street Performance, Mechanical, 110 gph, 6.5-8 psi, 3/8 in.-NPT Ports, Female Thread, Aluminum, Shiny, Rotatable, Chevy, 262-400ci, Each
Part Number: HLY-12-327-11
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Main Bearings, Bi-Metal, Silicon Aluminum, Standard Size, GM Gen III/IV LS, Set of 5
Part Number: SUM-172300
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Starter, PowerMax, Mini, Inline, Black Painted, Chevy, Each
Part Number: PWM-9000
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Spring Kit, Platinum, Dual, Standard, Titanium Retainer, 0.060 in. Thick, 377 lbs./in., Factory Valve Guides, Kit
Part Number: BTC-SK001T0560BB
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Shock, 5100 Series, Monotube, Front, Each
Part Number: BSN-24-185776
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cylinder Head, GenX® 220, Fast As Cast®, Assembled, 64cc CNC Chambers, Titanium Retainers, GM LS1, Each
Part Number: TFS-3061T001
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cylinder Head, Assembled, Aluminum, Natural, Jeep, 4.0, L6, Each
Part Number: EDL-50169
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 2 Pro LS Cam. 226/238 113+3, .600/.600 Lift, 3-bolt, 4.8, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck LS1 LS2 LS6 LS3 LS7 LSA LQ4 LQ9 LS9 LS4 LY6
Part Number: SUM-8707R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Flexplate Bolts, Pro Series, 7/16 in.- 20 RH, .680 in. Length, 12-Point, Chevy, Ford, Set of 6
Part Number: ARP-200-2902
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Starter, PowerMax Plus, Mini Hitachi, 1.7 HP Motor, 160 ft. lbs. of Torque, Gear Reduction, Chevy, GMC, LS, Each
Part Number: PWM-9109
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Starter, PowerMAX EFI, Mini, 3/4 in. Offset, 2 3/8 in. Nose Length, Ford, 289/302/351W, Each
Part Number: PWM-9162
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Bellhousing Adapter, Conversion, Cummins to GM, Billet Aluminum, 141-tooth Flexplate, Kit
Part Number: SUM-770380
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Crate Engine, Remanufactured Long Block, Assembled, Cadillac, Chevrolet, GMC, 5.3L LS, Each
Part Number: VRE-DCT8
Estimated Ship Date: Apr 20, 2026 if ordered today
Estimated Ship Date: Apr 20, 2026 if ordered today
Need It Sooner? We recommend these similar substitute parts:
ATK High Performance Chevy LM7 5.3L 385 HP Long BLock Crate Engines HP97
Estimated Ship Date: Monday 3/9/2026
Spark Plug, V-Power, Gasket Seat, 14mm Thread, .750 in. Reach, Projected Tip, Resistor, Each
Part Number: NGK-7938
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cam and Lifter kit, Stage 1 Pro LS Drop-in Truck Swap Cam, Maximum Torque for Towing, 205/217 112+2, .500 /.500 Lift, 3-bolt, 4.8, 5.3, 6.0, 6.2
Part Number: SUM-K8718R1
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster