Availability
Engine Lift Sling, Nylon Strap, 24 in. Straps, 1,200 lb. Capacity, Each
Part Number: SUM-905230
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
BUILD IT WITH SUMMIT!
Door Bar Kits, Swing-Out, Release Pin, 1.625 in. Tube Diameter, Fits 0.083 in. Wall Tubing, Kit
Part Number: SUM-770992
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Traction Compound, Track Bite, 1 Gallon, Each
Part Number: PJI-SP-162
Cannot be shipped Internationally
Cannot be shipped Internationally
Muffler, Super 44 Series, 2 1/2 in. Inlet/2 1/2 in. Outlet, Steel, Black, Each
Part Number: FLO-942548
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Cover, Direct OEM Replacement, Stock Height, Cast Aluminum, Black Finish, Includes Bolts,Grommets ,Gaskets, Right/Passenger Side, GM LS, Each
Part Number: SUM-440555B
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Door Bar Kits, Swing-Out, Release Pin, 1.625 in. Tube Diameter, Fits 0.134 in. Wall Tubing, Kit
Part Number: SUM-770990
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Cover, Direct OEM Replacement, Stock Height, Cast Aluminum, Natural Finish, Includes Bolts, Grommets, Gaskets, Left/Drivers Side, GM LS, Each
Part Number: SUM-440550
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Cover, Direct OEM Replacement, Stock Height, Cast Aluminum, Black Finish, Includes Bolts, Grommets,Gaskets, Left/Drivers Side, GM LS, Each
Part Number: SUM-440550B
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Valve Cover, Direct OEM Replacement, Stock Height, Cast Aluminum, Natural Finish, Includes Bolts, Grommets, Gaskets, Right/Passenger Side, GM LS, Each
Part Number: SUM-440555
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Ignition Coil, GM HEI Super Coil, In-Cap, Square, Epoxy, Gray, 45,000 V, Red/Yellow Wire, Each
Part Number: ACC-140003
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Transfer Pump, Fuel, Battery Powered, 3 Gallons Per Minute, Each
Part Number: MRG-8000MRG
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Shifter Cover, Aluminum, Black Anodized, Quarter Stick, Each
Part Number: HUU-1300051
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Bumper, Stock, Rear, Polished, Jeep, Pair
Part Number: KTL-30438
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Muffler, Delta Flow 40 Series, 2 1/2 in. Inlet/2 1/2 in. Outlet, Stainless Steel, Black, Each
Part Number: FLO-842541
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Spark Plug Wires, Go-Spark, Pre-Made, Ceramic, Black, 8mm, Spiral Core, 135 Degree Boots, LS Engine, Set
Part Number: FIF-90010
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Pump, In-Tank, High-Flow, 90 psi, 320 lph, 11mm Inlet, 8mm Hose Barb Outlet, Gasoline or E85 Fuel Type, Each
Part Number: SUM-250110-E
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Filter, Inline, 10 microns, Black Housing, Cellulose Depth Filter Element, -6 AN O-ring, Female Threads
Part Number: EAR-230606ERL
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Motorcycle Jack, 1,100 lb. Capacity, 16.25 in. Maximum Lift, Steel, Black, Each
Part Number: RRR-MC-JACK
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Exhaust and Header Wrap Kit, Volcano, 2,500 degrees F, Lava Rock, Natural, 1 in. Width, 100 ft. Length, with Stainless Steel Locking Ties, Kit
Part Number: SUM-350210K
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Muffler, Maximum Flow, 3 in. Inlet/3 in. Outlet, Steel, Aluminized, Each
Part Number: HOK-21630HKR
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Pump, Electric, 95 gph., 7 psi., 3/8 in. NPT Inlet/Outlet, Each
Part Number: MRG-95P
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Filters, Dominator, Billet Filter, Inline, -12 AN Inlet/Outlet, Female Straight, Stainless Element, 100 microns, 260 gph, Black, Gas/E85, Each
Part Number: HLY-162-572
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Pro-grade Digital Caliper, 0-6 in. range, 0-150mm, with ..0005 accuracy, SAE and Metric conversion, IP67 Rated for harsh conditions,
Part Number: SUM-900463
Not Yet Reviewed
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
AN Wrench Kit, 7-Piece, Aluminum, Anodized, -4 AN through -20 AN, Kit
Part Number: MRG-33200G
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Fuel Filters, Dominator, Billet Filter, Inline, -12 AN Inlet/Outlet, Female Straight, Paper Element, 10 microns, 260 gph, Black Finish, Gas/E85, Each
Part Number: HLY-162-570
Estimated Ship Date: Monday 8/4/2025
Estimated Ship Date: Monday 8/4/2025
Modal Header
Call To Order
This is a custom order part. You can order this part by Contacting Us.