Availability
2000 Connecting Rods
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 6.135 in. Length, Chevy, Big Block, Set of 8
Part Number: SCA-26135P
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rod Bolts, Eagle H-Beam Rod Bolt Replacements, 8740 Chromoly Steel, Chevy, Dodge, Ford, Set of 16
Part Number: ESP-12000
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, Big Block Max Plus Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.385 in. Long, Chevy, Big Block, Set of 8
Part Number: OLV-C6385BBMXP8
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, CRS Lightweight H-Beam, Forged 4340 Steel, 5.155 in. Length Center To Center, Ford, 3.6L, 4.2L, 4.3L, 4.7L, 5.0L, Set of 8
Part Number: ESP-CRS5155F3D
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, 4340 Steel H-Beam, 6.135 in. Length, Cap Screw, Bushed, Chevy, Big Block, Set of 8
Part Number: ESP-61353D2000
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, 4340 Steel, H-Beam, 6.250 in. Length, Cap Screw, Bushed, Chevy, Ford, Set of 8
Part Number: ESP-6250B3D2000
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, 4340, H-Beam, 12-Point, Cap Screw, 5.400 in. Length, Ford, Small Block, Set of 8
Part Number: SCA-65400927
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rod Bolts, Pro Series, 2000 Alloy, Ford, 4.6, 5.4L, Set of 16
Part Number: ARP-256-6301
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, CRS Lightweight H-Beam, Forged 4340 Steel, 5.933 in. Length Center To Center, Ford, 4.6L, 5.0L, Set of 8
Part Number: ESP-CRS5933F3D
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy, Small Block, Set of 8
Part Number: ESP-6000B3D
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy, Big Block, Set of 8
Part Number: ESP-61353D
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy, 90 Degree V6, Set of 6
Part Number: ESP-570063D
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, FSI I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 6.385 in. Long, Chevrolet, Big Block, Set of 8
Part Number: ESP-FSI6385
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, ESP 4340 H-Beam, Cap Screw, Bushed, Chevy, Small Block, Set of 8
Part Number: ESP-6200B3D
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, H-beam, Forged 4340 Steel, Shot-peened and Tumbled, Floating, 6.000 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-6600021SA
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, Ultra, H-beam, Forged 4330 Steel, 6.125 in. Length, Floating, Chevy, 5.7L LS, Set of 8
Part Number: CPI-U16300
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, SIR 5140 I-Beam, Bushed, Chevy, Big Block, Set of 8
Part Number: ESP-6385B
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, FSI I-Beam, Forged 4340 Steel, Shot-Peened, Floating, 5.700 in. Long, Chevrolet, Small Block, Set of 8
Part Number: ESP-FSI5700B
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, 4340, I-Beam, 12-Point, Cap Screw, 5.700 in. Length, Chevy, Small Block, Set of 8
Part Number: SCA-25700
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rod, I-Beam, Chromoly 4340 Steel, Shot-Peened, Floating Pin, Chevrolet, Big Block, Set of 8
Part Number: BLN-BC6385-990
Not Yet Reviewed
Estimated Ship Date: Mar 25, 2026 if ordered today
Estimated Ship Date: Mar 25, 2026 if ordered today
ESP BBC 6.700" ROD
Part Number: ESP-67003D2000
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Forged Pro SBC 4340 Forged Steel I-Beam Connecting Rods, 5.700 in. Length, .927 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-SBC57008I
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.700 in. Length, .990 Floating Pin, ARP L19 260K PSI 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC670019H
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Forged Pro Mopar SB 4340 Forged Steel H-Beam Connecting Rod, 6.123 in. Length, .984 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-MOP61238H
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Connecting Rods, Big Block Max Series, Forged 4340 Steel I-Beam, 12-Point, Cap Screw, 6.800 in. Long, Chevy, Big Block, Set of 8
Part Number: OLV-C6800BBMX8
Not Yet Reviewed
Estimated Ship Date: Mar 26, 2026 if ordered today
Estimated Ship Date: Mar 26, 2026 if ordered today
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster