Availability
2000 Summit Racing Engines & Components
SBF 302 Windsor Cast crank, 3.400 in. stroke, 5.400 rod, Nitride Hardened, External 28 0z. Balance, Req. Narrowed Rod bearings
Part Number: SUM-SBF3023400C
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pro LS 4340 Piston and Rod Kit, 364 Cid., 3.810 bore, 4.000 stroke, 6.125 rod, 5cc dish, 11:1 @ 61cc, 10.5:1 @ 65cc, File-Fit Rings
Part Number: SUM-PR408105
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Oil Pump, Standard-Volume, Standard Pressure, Chevy, Small Block, Each
Part Number: SUM-121155SV
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pistons, Forged, Flat, 4.000 in. Bore, Chevy, Set of 8
Part Number: SUM-17360FC-00
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft Kit, Pro LS Vortec Truck Swap, Hydraulic Roller Tappet, Advertised Duration 278/282, Lift .550/.550, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8714-2-BHV
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Water Pump Pulley, V-Belt, 2-Groove, Steel, Chrome, Chevy, Small Block, Long Pump, Each
Part Number: SUM-G3955
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.7 in. Length, .990 Floating Pin, 8740 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC67008H
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Tall, Die-cast, Aluminum, Polished, 347 C.I. Stroker, Ford, Small Block, Pair
Part Number: SUM-440407
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Forged Pro BB Chevy 4340 Forged Steel H-Beam Connecting Rods, 6.385 in. Length, .990 Floating Pin, ARP 2000 7/16 in. 12 pt. Bolts, Set of 8
Part Number: SUM-BBC63852H
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Stage 5 Pro LS Twin-Turbo Cam. 247/251 Dur., 117.5+5.5, .625/.615 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0, Vortec Truck, LS1 LS2 LS6 LS3 LQ4 LQ9, Each
Part Number: SUM-8725R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Cover Set, LS Race, Lightweight Die Cast Aluminum, With Coil Mounts, Silver Powder Coat, Pair
Part Number: SUM-440825
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Summit Precision High-Tensile Tri-Metal Alloy COATED Racing Rod Bearings, SBC/LS 2.100 pin, .837 width, Standard Clearance, set
Part Number: SUM-663HCS
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft Kit, Pro LS Turbo, Hydraulic Roller Tappet, Advertised Duration 275/283, Lift .600/.575, Chevy GM, LS/LSX, Gen III/IV, Each
Part Number: SUM-8706-1
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Tall, Steel, Chrome, Plain, Chevy, Big Block, Pair
Part Number: SUM-G3312
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Oil Filter, Canister, 22mm x 1.5 Thread, 3.350 in. High, common on 2007+ LS, Each
Part Number: SUM-127001
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Valve Covers, Aluminum, Finned, Black Powdercoated, Stock Height, Chevy, LS, Pair
Part Number: SUM-440500B
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Oil Pickup, Press Fit, Street/Strip Pan Style, 8.250 in. Pan Depth, Chevy, V8, Big Block, 396-454, Each
Part Number: SUM-G36031
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Camshaft Kit, Pro LS, Hydraulic Roller Tappet, Advertised Duration 275/288, Lift .600/.600, Chevy GM, LS/LSX, Gen III/IV, Kit
Part Number: SUM-8707-2-DLSTL
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Cam and Lifter KIt Muscle Car Replacement SBC Flat tappet hydraulic,L-82 350 hp 350 Cam with Lifters
Part Number: SUM-K1122
Not Yet Reviewed
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
SUM-8722 Level 1 Cam Kit with Dual Springs Steel Retainers Locks and Seals, Stage 3 Pro LS Twin-Turbo Cam. 234/238 Dur., 115+5, .625/.605 Lift, 3-bolt
Part Number: SUM-8722-1-DLSTL
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Pistons, Forged, Flat, 4.040 in. Bore, Ford, Set of 8
Part Number: SUM-17370FC-40
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Oil Pump Driveshaft, Chevy, Big Block, Each
Part Number: SUM-121161
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Lifter, Hydraulic Roller, Chevy, Set of 16
Part Number: SUM-HT21616
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Cam and Lifter kit, Stage 3 Pro LS Cam - Extra Valve Clearance Version, 230/242 113+3, .625/.605 Lift, 3-bolt, 5.3, 5.7, 6.0, 6.2, 7.0L
Part Number: SUM-K8710R1
Not Yet Reviewed
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Combo, Oil Pan, Black Zinc, Pickup, Std-Volume Pump, Shaft, Tray, Scraper, Gaskets, Chevy, 7.4L/454, Kit
Part Number: SUM-PANKIT13
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Estimated Ship Date: Monday 3/9/2026 if shipped by air
Truck / SUV
Jeep®
Restoration
Stock Replacement
Late Model Muscle
Tools
Gifts, Clothing, & More
Circle Track
Street Rod
Powersports
Paint & Body
Marine
Jr Dragster